[Federal Register Volume 73, Number 151 (Tuesday, August 5, 2008)]
[Notices]
[Pages 45479-45485]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E8-17697]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Notice; Applications and Amendments to Facility Operating 
Licenses Involving Proposed No Significant Hazards Considerations and 
Containing Sensitive Unclassified Non-Safeguards Information or 
Safeguards Information and Order Imposing Procedures for Access to 
Sensitive Unclassified Non-Safeguards Information or Safeguards 
Information

I. Background

    Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as 
amended (the Act), the U.S. Nuclear Regulatory Commission (the 
Commission or NRC staff) is publishing this notice. The Act requires 
the Commission publish notice of any amendments issued, or proposed to 
be issued and grants the Commission the authority to issue and make 
immediately effective any amendment to an operating license upon a 
determination by the Commission that such amendment involves no 
significant hazards consideration, notwithstanding the pendency before 
the Commission of a request for a hearing from any person.
    This notice includes notices of amendments containing sensitive 
unclassified non-safeguards information (SUNSI) or safeguards 
information (SGI).

Notice of Consideration of Issuance of Amendments to Facility Operating 
Licenses, Proposed No Significant Hazards Consideration Determination, 
and Opportunity for a Hearing

    The Commission has made a proposed determination that the following 
amendment requests involve no significant hazards consideration. Under 
the Commission's regulations in 10 CFR 50.92, this means that operation 
of the facility in accordance with the proposed amendment would not (1) 
Involve a significant increase in the probability or consequences of an 
accident previously evaluated; or (2) create the possibility of a new 
or different kind of accident from any accident previously evaluated; 
or (3) involve a significant reduction in a margin of safety. The basis 
for this proposed determination for each amendment request is shown 
below.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the

[[Page 45480]]

expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day 
comment period such that failure to act in a timely way would result, 
for example in derating or shutdown of the facility. Should the 
Commission take action prior to the expiration of either the comment 
period or the notice period, it will publish in the Federal Register a 
notice of issuance. Should the Commission make a final No Significant 
Hazards Consideration Determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.
    Written comments may be submitted by mail to the Chief, Rulemaking, 
Directives and Editing Branch, Division of Administrative Services, 
Office of Administration, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, and should cite the publication date and 
page number of this Federal Register notice. Written comments may also 
be delivered to Room 6D44, Two White Flint North, 11545 Rockville Pike, 
Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. 
Copies of written comments received may be examined at the Commission's 
Public Document Room (PDR), located at One White Flint North, Public 
File Area O1F21, 11555 Rockville Pike (first floor), Rockville, 
Maryland. The filing of requests for a hearing and petitions for leave 
to intervene is discussed below.
    Within 60 days after the date of publication of this notice, any 
person(s) whose interest may be affected by this proceeding and who 
wishes to participate as a party in the proceeding may file a request 
for a hearing and a petition to intervene with respect to issuance of 
the amendment to the subject facility operating license. Such requests 
for a hearing and petitions to intervene must be written requests filed 
via electronic submission through the NRC E-Filing system. Requests for 
a hearing and a petition for leave to intervene shall be filed in 
accordance with the Commission's ``Rules of Practice for Domestic 
Licensing Proceedings'' in 10 CFR part 2. Interested person(s) should 
consult a current copy of 10 CFR 2.309, which is available at the 
Commission's PDR, located at One White Flint North, Public File Area 
01F21, 11555 Rockville Pike (first floor), Rockville, Maryland, or at 
http://www.nrc.gov/reading-rm/doc-collections/cfr/part002/part002-0309.html. Publicly available records will be accessible from the 
Agencywide Documents Access and Management System's (ADAMS) Public 
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. If a request for a hearing or petition for 
leave to intervene is filed within 60 days, the Commission or a 
presiding officer designated by the Commission or by the Chief 
Administrative Judge of the Atomic Safety and Licensing Board Panel, 
will rule on the request and/or petition; and the Secretary or the 
Chief Administrative Judge of the Atomic Safety and Licensing Board 
will issue a notice of a hearing or an appropriate order.
    As required by 10 CFR 2.309, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the 
following general requirements: (1) The name, address, and telephone 
number of the requestor or petitioner; (2) the nature of the 
requestor's/petitioner's right under the Act to be made a party to the 
proceeding; (3) the nature and extent of the requestor's/petitioner's 
property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be entered in the 
proceeding on the requestor's/petitioner's interest. The petition must 
also set forth the specific contentions which the petitioner/requestor 
seeks to have litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or fact to be raised or controverted. In addition, the 
petitioner/requestor shall provide a brief explanation of the bases for 
the contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on which the petitioner/
requestor intends to rely in proving the contention at the hearing. The 
petitioner/requestor must also provide references to those specific 
sources and documents of which the petitioner is aware and on which the 
petitioner/requestor intends to rely to establish those facts or expert 
opinion. The petition must include sufficient information to show that 
a genuine dispute exists with the applicant on a material issue of law 
or fact. Contentions shall be limited to matters within the scope of 
the amendment under consideration. The contention must be one which, if 
proven, would entitle the petitioner/requestor to relief. A petitioner/
requestor who fails to satisfy these requirements with respect to at 
least one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing.
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held. If 
the final determination is that the amendment request involves no 
significant hazards consideration, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendment. If the final determination is that the amendment 
request involves a significant hazards consideration, any hearing held 
would take place before the issuance of any amendment.
    A request for hearing or a petition for leave to intervene must be 
filed in accordance with the NRC E-Filing rule, which the NRC 
promulgated in August 28, 2007 (72 FR 49139). The E-Filing process 
requires participants to submit and serve documents over the internet 
or in some cases to mail copies on electronic storage media. 
Participants may not submit paper copies of their filings unless they 
seek a waiver in accordance with the procedures described below.
    To comply with the procedural requirements of E-Filing, at least 
ten (10) days prior to the filing deadline, the petitioner/requestor 
must contact the Office of the Secretary by e-mail at 
[email protected], or by calling (301) 415-1677, to request (1) a 
digital ID certificate, which allows the participant (or its counsel or 
representative) to digitally sign documents and access the E-Submittal 
server for any proceeding in which it is participating; and/or (2) 
creation of an electronic docket for the proceeding (even in instances 
in which the petitioner/requestor (or its counsel or representative) 
already holds an NRC-issued digital ID certificate). Each petitioner/
requestor will need to download the Workplace Forms Viewer\TM\ to 
access the Electronic Information Exchange (EIE), a

[[Page 45481]]

component of the E-Filing system. The Workplace Forms Viewer\TM\ is 
free and is available at http://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information about applying for a digital ID 
certificate is available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
    Once a petitioner/requestor has obtained a digital ID certificate, 
had a docket created, and downloaded the EIE viewer, it can then submit 
a request for hearing or petition for leave to intervene. Submissions 
should be in Portable Document Format (PDF) in accordance with NRC 
guidance available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the 
time the filer submits its documents through EIE. To be timely, an 
electronic filing must be submitted to the EIE system no later than 
11:59 p.m. Eastern Time, on the due date. Upon receipt of a 
transmission, the E-Filing system time-stamps the document and sends 
the submitter an e-mail notice confirming receipt of the document. The 
EIE system also distributes an e-mail notice that provides access to 
the document to the NRC Office of the General Counsel and any others 
who have advised the Office of the Secretary that they wish to 
participate in the proceeding, so that the filer need not serve the 
documents on those participants separately. Therefore, applicants and 
other participants (or their counsel or representative) must apply for 
and receive a digital ID certificate before a hearing request/petition 
to intervene is filed so that they can obtain access to the document 
via the E-Filing system.
    A person filing electronically may seek assistance through the 
``Contact Us'' link located on the NRC Web site at http://www.nrc.gov/site-help/e-submittals.html or by calling the NRC technical help line, 
which is available between 8 a.m. and 4:15 p.m., Eastern Time, Monday 
through Friday. The help line number is (800) 397-4209 or locally, 
(301) 415-4737.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file a motion, in accordance 
with 10 CFR 2.302(g), with their initial paper filing requesting 
authorization to continue to submit documents in paper format. Such 
filings must be submitted by: (1) First class mail addressed to the 
Office of the Secretary of the Commission, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Rulemaking and 
Adjudications Staff; or (2) courier, express mail, or expedited 
delivery service to the Office of the Secretary, Sixteenth Floor, One 
White Flint North, 11555 Rockville, Pike, Rockville, Maryland, 20852, 
Attention: Rulemaking and Adjudications Staff. Participants filing a 
document in this manner are responsible for serving the document on all 
other participants. Filing is considered complete by first-class mail 
as of the time of deposit in the mail, or by courier, express mail, or 
expedited delivery service upon depositing the document with the 
provider of the service.
    Non-timely requests and/or petitions and contentions will not be 
entertained absent a determination by the Commission, the presiding 
officer, or the Atomic Safety and Licensing Board that the petition 
and/or request should be granted and/or the contentions should be 
admitted, based on a balancing of the factors specified in 10 CFR 
2.309(c)(1)(i)-(viii). To be timely, filings must be submitted no later 
than 11:59 p.m. Eastern Time on the due date.
    Documents submitted in adjudicatory proceedings will appear in 
NRC's electronic hearing docket which is available to the public at 
http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant 
to an order of the Commission, an Atomic Safety and Licensing Board, or 
a Presiding Officer. Participants are requested not to include personal 
privacy information, such as social security numbers, home addresses, 
or home phone numbers in their filings. With respect to copyrighted 
works, except for limited excerpts that serve the purpose of the 
adjudicatory filings and would constitute a Fair Use application, 
participants are requested not to include copyrighted materials in 
their submission.
    For further details with respect to this amendment action, see the 
application for amendment which is available for public inspection at 
the Commission's PDR, located at One White Flint North, Public File 
Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland. 
Publicly available records will be accessible from the ADAMS Public 
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. If you do not have access to ADAMS or if 
there are problems in accessing the documents located in ADAMS, contact 
the PDR Reference staff at 1 (800) 397-4209, (301) 415-4737 or by email 
to [email protected].

FPL Energy, Point Beach, LLC, Docket No. 50-266 , Point Beach Nuclear 
Plant, Unit 1, Town of Two Creeks, Manitowoc County, Wisconsin.

    Date of amendment request: May 28, 2008.
    Description of amendment request: This amendment request contains 
sensitive unclassified non-safeguards information (SUNSI). The 
amendment proposes a one cycle revision to the Point Beach Nuclear 
Plant (PBNP) Unit 1 technical specifications (TS). Specifically, TS 
5.5.8, ``Steam Generator (SG) Program,'' and TS 5.6.8, ``Steam 
Generator Tube Inspection Report,'' will be revised to incorporate an 
interim alternate repair criterion into the provisions for SG tube 
repair for use during the Unit 1 2008 fall refueling outage and the 
subsequent operating cycle.
    Basis for proposed no significant hazards consideration 
determination: As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration which is presented below:

    1. Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    Of the various accidents previously evaluated, the proposed 
changes only affect steam generator tube rupture (SGTR) event 
evaluation and the postulated steam line break (SLB), locked rotor, 
and control rod ejection accident evaluations.
    Loss-of-coolant accident (LOCA) conditions cause a compressive 
axial load to act on the tube. Therefore, since the LOCA tends to 
force the tube into the tubesheet rather than pull it out, it is not 
a factor in this amendment request. Another faulted load 
consideration is a safe shutdown earthquake (SSE); however, the 
seismic analysis of Model F steam generators has shown that axial 
loading of the tubes is negligible during an SSE.
    At normal operating pressures, leakage from [primary water 
stress cracking corrosion] PWSCC below 17 inches from the [top of 
the tubesheet] TTS is limited by both the tube-to-tubesheet crevice 
and the limited crack opening permitted by the tubesheet constraint. 
Consequently, negligible normal operating leakage is expected from 
cracks within the tubesheet region.
    For the SGTR event, the required structural margins of the steam 
generator tubes is maintained by limiting the allowable ligament 
size for a circumferential crack to remain in service to 203 degrees 
below 17 inches from the TTS for the subsequent operating cycle. 
Tube rupture is precluded for cracks in the hydraulic expansion 
region due to the constraint provided by the tubesheet. The 
potential for tube pullout is mitigated by limiting the allowable 
crack size to 203 degrees subsequent operating cycle. These 
allowable crack sizes take into account

[[Page 45482]]

eddy current uncertainty and crack growth rate. It has been shown 
that a circumferential crack with an azimuthal extent of 203 degrees 
for the 18-month SG tubing eddy current inspection interval meets 
the performance criteria of NEI 97-06, Rev. 2, ``Steam Generator 
Program Guidelines'' and Draft Regulatory Guide (RG) 1.121, ``Bases 
for Plugging Degraded PWR [pressurized water reactors] Steam 
Generator Tubes.'' Therefore, the margin against tube burst pullout 
is maintained during normal and postulated accident conditions and 
the proposed change does not result in a significant increase in the 
probability or consequence of a SGTR.
    The probability of a SLB is unaffected by the potential failure 
of a SG tube as the failure of a tube is not an initiator for a SLB 
event. SLB leakage is limited by leakage flow restrictions resulting 
from the leakage path above potential cracks through the tube-to-
tubesheet crevice. The leak rate during postulated accident 
conditions (including locked rotor) has been shown to remain within 
the accident analysis assumptions for all axial or circumferentially 
oriented cracks occurring 17 inches below the top of the tubesheet. 
Since normal operating leakage is limited to 150 [gallons per day] 
gpd (approximately 0.10 [gallons per minute] gpm), the attendant 
accident condition leak rate, assuming all leakage to be from 
indications below 17 inches from the top of the tubesheet would be 
bounded by 500 gpd (approximately 0.35 gpm). This value is within 
the accident analysis assumptions for the design basis accident for 
PBNP.
    Based on the above, the performance criteria of NEI-97-06, Rev. 
2 and Draft Regulatory Guide (RG) 1.121 continue to be met and the 
proposed change does not involve a significant increase in the 
probability or consequences of an accident previously evaluated.
    (2) Does the proposed change create the possibility of a new or 
different accident from any accident previously evaluated?
    Response: No.
    The proposed change does not introduce any changes or mechanisms 
that create the possibility of a new or different kind of accident. 
Tube bundle integrity is expected to be maintained for all plant 
conditions upon implementation of the interim alternate repair 
criteria. The proposed change does not introduce any new equipment 
or any change to existing equipment. No new effects on existing 
equipment are created nor are any new malfunctions introduced.
    Therefore, based on the above evaluation, the proposed changes 
do not create the possibility of a new or different kind of accident 
from any accident previously evaluated.
    (3) Does the proposed change involve a significant reduction in 
a margin of safety?
    Response: No.
    The proposed change maintains the required structural margins of 
the steam generator tubes for both normal and accident conditions. 
NEI 97-06, Revision 2 and RG I.I21 are used as the basis in the 
development of the limited tubesheet inspection depth methodology 
for determining that steam generator tube integrity considerations 
are maintained within acceptable limits. RG 1.121 describes a method 
acceptable to the NRC staff for meeting [general design criteria] 
GDC 14, 15, 31, and 32 by reducing the probability and consequences 
of an SGTR. PBNP GDC 9, 33, 31, 34, and 36 are similar to Appendix A 
GDC 14, 15, 31, and 32. RG 1. 12 1 concludes that by determining the 
limiting safe conditions of tube wall degradation beyond which tubes 
with unacceptable cracking, as established by inservice inspection, 
should be removed from service or repaired, the probability and 
consequences of a SGTR are reduced. This RG uses safety factors on 
loads for tube burst that are consistent with the requirements of 
Section III of the ASME [American Society of Mechanical Engineers] 
Code.
    For axially oriented cracking located within the tubesheet, tube 
burst is precluded due to the presence of the tubesheet. For 
circumferentially oriented cracking in a tube or the tube-to-
tubesheet weld, References 2 and 4 [of the application] define a 
length of remaining tube ligament that provides the necessary 
resistance to tube pullout due to the pressure induced forces (with 
applicable safety factors applied). Additionally, it is shown that 
application of the limited tubesheet inspection depth criteria will 
not result in unacceptable primary-to-secondary leakage during all 
plant conditions.
    Based on the above, it is concluded that the proposed changes do 
not result in any reduction of margin with respect to plant safety 
as defined in the Final Safety Analysis Report or Bases of the plant 
Technical Specifications.

    Attorney for licensee: Antonio Fernandez, Esquire, Senior Attorney, 
FPL Energy Point Beach, LLC, P.O. Box 14000, Juno Beach, FL 33408-0420.
    NRC Branch Chief: Lois James.

Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information (SUNSI) and Safeguards Information (SGI) for 
Contention Preparation

FPL Energy, Point Beach, LLC, Docket No. 50-266, Point Beach Nuclear 
Plant, Unit 1, Town of Two Creeks, Manitowoc County, Wisconsin

    1. This order contains instructions regarding how potential parties 
to the proceedings listed above may request access to documents 
containing sensitive unclassified information (SUNSI and SGI).
    2. Within ten (10) days after publication of this notice of 
opportunity for hearing, any potential party as defined in 10 CFR 2.4 
who believes access to SUNSI or SGI is necessary for a response to the 
notice may request access to SUNSI or SGI. A ``potential party'' is any 
person who intends or may intend to participate as a party by 
demonstrating standing and the filing of an admissible contention under 
10 CFR 2.309. Requests submitted later than ten (10) days will not be 
considered absent a showing of good cause for the late filing, 
addressing why the request could not have been filed earlier.
    3. The requester shall submit a letter requesting permission to 
access SUNSI and/or SGI to the Office of the Secretary, U.S. Nuclear 
Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemakings and Adjudications Staff, and provide a copy to the 
Associate General Counsel for Hearings, Enforcement and Administration, 
Office of the General Counsel, Washington, DC 20555-0001. The expedited 
delivery or courier mail address for both offices is U.S. Nuclear 
Regulatory Commission, 11555 Rockville Pike, Rockville, MD 20852. The 
e-mail address for the Office of the Secretary and the Office of the 
General Counsel are [email protected] and 
[email protected], respectively.\1\ The request must 
include the following information:
---------------------------------------------------------------------------

    \1\ See footnote 6. While a request for hearing or petition to 
intervene in this proceeding must comply with the filing 
requirements of the NRC's ``E-Filing Rule,'' the initial request to 
access SUNSI and/or SGI under these procedures should be submitted 
as described in this paragraph.
---------------------------------------------------------------------------

    a. A description of the licensing action with a citation to this 
Federal Register notice of opportunity for hearing;
    b. The name and address of the potential party and a description of 
the potential party's particularized interest that could be harmed by 
the action identified in (a.);
    c. If the request is for SUNSI, the identity of the individual 
requesting access to SUNSI and the requester's need for the information 
in order to meaningfully participate in this adjudicatory proceeding, 
particularly why publicly available versions of the application would 
not be sufficient to provide the basis and specificity for a proffered 
contention;
    d. If the request is for SGI, the identity of the individual 
requesting access to SGI and the identity of any expert, consultant or 
assistant who will aid the requester in evaluating the SGI, and 
information that shows:
    (i) Why the information is indispensable to meaningful 
participation in this licensing proceeding; and
    (ii) The technical competence (demonstrable knowledge, skill, 
experience, training or education) of the requester to understand and 
use (or evaluate) the requested information to provide the basis and 
specificity for a proffered contention. The technical competence of a 
potential party or its counsel may be shown by reliance on a qualified 
expert, consultant or assistant

[[Page 45483]]

who demonstrates technical competence as well as trustworthiness and 
reliability, and who agrees to sign a non-disclosure affidavit and be 
bound by the terms of a protective order; and
    e. If the request is for SGI, Form SF-85, ``Questionnaire for Non-
Sensitive Positions,'' Form FD-258 (fingerprint card), and a credit 
check release form completed by the individual who seeks access to SGI 
and each individual who will aid the requester in evaluating the SGI. 
For security reasons, Form SF-85 can only be submitted electronically, 
through a restricted-access database. To obtain online access to the 
form, the requester should contact the NRC's Office of Administration 
at 301-415-0320. The other completed forms must be signed in original 
ink, accompanied by a check or money order payable in the amount of 
$191.00 to the U.S. Nuclear Regulatory Commission for each individual, 
and mailed to the: \2\ Office of Administration, Security Processing 
Unit, Mail Stop T-6E46, U.S. Nuclear Regulatory Commission, Washington, 
DC 20555-0012.
---------------------------------------------------------------------------

    \2\ The requester will be asked to provide his or her full name, 
social security number, date and place of birth, telephone number, 
and email address. After providing this information, the requester 
usually should be able to obtain access to the online form within 
one business day.
---------------------------------------------------------------------------

    These forms will be used to initiate the background check, which 
includes fingerprinting as part of a criminal history records check.

    Note: Copies of these forms do not need to be included with the 
request letter to the Office of the Secretary, but the request 
letter should state that the forms and fees have been submitted as 
described above.

    4. To avoid delays in processing requests for access to SGI, all 
forms should be reviewed for completeness and accuracy (including 
legibility) before submitting them to the NRC. Incomplete packages will 
be returned to the sender and will not be processed.
    5. Based on an evaluation of the information submitted under items 
2 and 3.a through 3.d, above, the NRC staff will determine within ten 
days of receipt of the written access request whether (1) there is a 
reasonable basis to believe the petitioner is likely to establish 
standing to participate in this NRC proceeding, and (2) there is a 
legitimate need for access to SUNSI or need to know the SGI requested. 
For SGI, the need to know determination is made based on whether the 
information requested is necessary (i.e., indispensable) for the 
proposed recipient to proffer and litigate a specific contention in 
this NRC proceeding \3\ and whether the proposed recipient has the 
technical competence (demonstrable knowledge, skill, training, 
education, or experience) to evaluate and use the specific SGI 
requested in this proceeding.
---------------------------------------------------------------------------

    \3\ Broad SGI requests under these procedures are thus highly 
unlikely to meet the standard for need to know; furthermore, staff 
redaction of information from requested documents before their 
release may be appropriate to comport with this requirement. These 
procedures do not authorize unrestricted disclosure or less scrutiny 
of a requester's need to know than ordinarily would be applied in 
connection with an already-admitted contention.
---------------------------------------------------------------------------

    6. If standing and need to know SGI are shown, the NRC staff will 
further determine based upon completion of the background check whether 
the proposed recipient is trustworthy and reliable. The NRC staff will 
conduct (as necessary) an inspection to confirm that the recipient's 
information protection systems are sufficient to protect SGI from 
inadvertent release or disclosure. Recipients may opt to view SGI at 
the NRC's facility rather than establish their own SGI protection 
program to meet SGI protection requirements.
    7. A request for access to SUNSI or SGI will be granted if:
    a. The request has demonstrated that there is a reasonable basis to 
believe that a potential party is likely to establish standing to 
intervene or to otherwise participate as a party in this proceeding;
    b. The proposed recipient of the information has demonstrated a 
need for SUNSI or a need to know for SGI, and that the proposed 
recipient of SGI is trustworthy and reliable;
    c. The proposed recipient of the information has executed a Non-
Disclosure Agreement or Affidavit and agrees to be bound by the terms 
of a Protective Order setting forth terms and conditions to prevent the 
unauthorized or inadvertent disclosure of SUNSI and/or SGI; and
    d. The presiding officer has issued a protective order concerning 
the information or documents requested.\4\ Any protective order issued 
shall provide that the petitioner must file SUNSI or SGI contentions 25 
days after receipt of (or access to) that information. However, if more 
than 25 days remain between the petitioner's receipt of (or access to) 
the information and the deadline for filing all other contentions (as 
established in the notice of hearing or opportunity for hearing), the 
petitioner may file its SUNSI or SGI contentions by that later 
deadline.
---------------------------------------------------------------------------

    \4\ If a presiding officer has not yet been designated, the 
Chief Administrative Judge will issue such orders, or will appoint a 
presiding officer to do so.
---------------------------------------------------------------------------

    8. If the request for access to SUNSI or SGI is granted, the terms 
and conditions for access to sensitive unclassified information will be 
set forth in a draft protective order and affidavit of non-disclosure 
appended to a joint motion by the NRC staff, any other affected parties 
to this proceeding,\5\ and the petitioner(s). If the diligent efforts 
by the relevant parties or petitioner(s) fail to result in an agreement 
on the terms and conditions for a draft protective order or non-
disclosure affidavit, the relevant parties to the proceeding or the 
petitioner(s) should notify the presiding officer within ten (10) days, 
describing the obstacles to the agreement.
---------------------------------------------------------------------------

    \5\ Parties/persons other than the requester and the NRC staff 
will be notified by the NRC staff of a favorable access 
determination (and may participate in the development of such a 
motion and protective order) if it concerns SUNSI and if the party/
person's interest independent of the proceeding would be harmed by 
the release of the information (e.g., as with proprietary 
information).
---------------------------------------------------------------------------

    9. If the request for access to SUNSI is denied by the NRC staff or 
a request for access to SGI is denied by NRC staff either after a 
determination on standing and need to know or, later, after a 
determination on trustworthiness and reliability, the NRC staff shall 
briefly state the reasons for the denial. Before the Office of 
Administration makes an adverse determination regarding access, the 
proposed recipient must be provided an opportunity to correct or 
explain information. The requester may challenge the NRC staff's 
adverse determination with respect to access to SUNSI or with respect 
to standing or need to know for SGI by filing a challenge within ten 
(10) days of receipt of that determination with (a) the presiding 
officer designated in this proceeding; (b) if no presiding officer has 
been appointed, the Chief Administrative Judge, or if he or she is 
unavailable, another administrative judge, or an administrative law 
judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another 
officer has been designated to rule on information access issues, with 
that officer. In the same manner, an SGI requester may challenge an 
adverse determination on trustworthiness and reliability by filing a 
challenge within fifteen (15) days of receipt of that determination.
    In the same manner, a party other than the requester may challenge 
an NRC staff determination granting access to SUNSI whose release would 
harm that party's interest independent of the proceeding. Such a 
challenge must be filed within ten (10) days of the notification by the 
NRC staff of its grant of such a request.
    If challenges to the NRC staff determinations are filed, these

[[Page 45484]]

procedures give way to the normal process for litigating disputes 
concerning access to information. The availability of interlocutory 
review by the Commission of orders ruling on such NRC staff 
determinations (whether granting or denying access) is governed by 10 
CFR 2.311.\6\
---------------------------------------------------------------------------

    \6\ As of October 15, 2007, the NRC's final ``E-Filing Rule'' 
became effective. See Use of Electronic Submissions in Agency 
Hearings (72 FR 49139; Aug. 28, 2007). Requesters should note that 
the filing requirements of that rule apply to appeals of NRC staff 
determinations (because they must be served on a presiding officer 
or the Commission, as applicable), but not to the initial SUNSI/SGI 
requests submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------

    10. The Commission expects that the NRC staff and presiding 
officers (and any other reviewing officers) will consider and resolve 
requests for access to SUNSI and/or SGI, and motions for protective 
orders, in a timely fashion in order to minimize any unnecessary delays 
in identifying those petitioners who have standing and who have 
propounded contentions meeting the specificity and basis requirements 
in 10 CFR Part 2. Attachment 1 to this Order summarizes the general 
target schedule for processing and resolving requests under these 
procedures.

    Dated at Rockville, Maryland, this 28th day of July, 2008.

    For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.

   Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
       (SUNSI) and Safeguards Information (SGI) in This Proceeding
------------------------------------------------------------------------
             Day                             Event/activity
------------------------------------------------------------------------
0............................  Publication of Federal Register notice of
                                proposed action and opportunity for
                                hearing, including order with
                                instructions for access requests.
10...........................  Deadline for submitting requests for
                                access to SUNSI and/or SGI with
                                information: Supporting the standing of
                                a potential party identified by name and
                                address; describing the need for the
                                information in order for the potential
                                party to participate meaningfully in an
                                adjudicatory proceeding; demonstrating
                                that access should be granted (e.g.,
                                showing technical competence for access
                                to SGI); and, for SGI, including
                                application fee for fingerprint/
                                background check.
60...........................  Deadline for submitting petition for
                                intervention containing: (i)
                                Demonstration of standing; (ii) all
                                contentions whose formulation does not
                                require access to SUNSI and/or SGI (+25
                                Answers to petition for intervention; +7
                                petitioner/requestor reply).
20...........................  NRC staff informs the requester of the
                                staff's determination whether the
                                request for access provides a reasonable
                                basis to believe standing can be
                                established and shows (1) need for SUNSI
                                or (2) need to know for SGI. (For SUNSI,
                                NRC staff also informs any party to the
                                proceeding whose interest independent of
                                the proceeding would be harmed by the
                                release of the information.) If NRC
                                staff makes the finding of need for
                                SUNSI and likelihood of standing, NRC
                                staff begins document processing
                                (preparation of redactions or review of
                                redacted documents). If NRC staff makes
                                the finding of need to know for SGI and
                                likelihood of standing, NRC staff begins
                                background check (including
                                fingerprinting for a criminal history
                                records check), information processing
                                (preparation of redactions or review of
                                redacted documents), and readiness
                                inspections.
25...........................  If NRC staff finds no ``need,'' ``need to
                                know,'' or likelihood of standing, the
                                deadline for petitioner/requester to
                                file a motion seeking a ruling to
                                reverse the NRC staff's denial of
                                access; NRC staff files copy of access
                                determination with the presiding officer
                                (or Chief Administrative Judge or other
                                designated officer, as appropriate). If
                                NRC staff finds ``need'' for SUNSI, the
                                deadline for any party to the proceeding
                                whose interest independent of the
                                proceeding would be harmed by the
                                release of the information to file a
                                motion seeking a ruling to reverse the
                                NRC staff's grant of access.
30...........................  Deadline for NRC staff reply to motions
                                to reverse NRC staff determination(s).
40...........................  (Receipt +30) If NRC staff finds standing
                                and need for SUNSI, deadline for NRC
                                staff to complete information processing
                                and file motion for Protective Order and
                                draft Non-Disclosure Affidavit. Deadline
                                for applicant/licensee to file Non-
                                Disclosure Agreement for SUNSI.
190..........................  (Receipt +180) If NRC staff finds
                                standing, need to know for SGI, and
                                trustworthiness and reliability,
                                deadline for NRC staff to file motion
                                for Protective Order and draft Non-
                                disclosure Affidavit (or to make a
                                determination that the proposed
                                recipient of SGI is not trustworthy or
                                reliable). Note: Before the Office of
                                Administration makes an adverse
                                determination regarding access, the
                                proposed recipient must be provided an
                                opportunity to correct or explain
                                information.
205..........................  Deadline for petitioner to seek reversal
                                of a final adverse NRC staff
                                determination either before the
                                presiding officer or another designated
                                officer.
A............................  If access granted: Issuance of presiding
                                officer or other designated officer
                                decision on motion for protective order
                                for access to sensitive information
                                (including schedule for providing access
                                and submission of contentions) or
                                decision reversing a final adverse
                                determination by the NRC staff.
A + 3........................  Deadline for filing executed Non-
                                Disclosure Affidavits. Access provided
                                to SUNSI and/or SGI consistent with
                                decision issuing the protective order.
A + 28.......................  Deadline for submission of contentions
                                whose development depends upon access to
                                SUNSI and/or SGI. However, if more than
                                25 days remain between the petitioner's
                                receipt of (or access to) the
                                information and the deadline for filing
                                all other contentions (as established in
                                the notice of hearing or opportunity for
                                hearing), the petitioner may file its
                                SUNSI or SGI contentions by that later
                                deadline.
A + 53.......................  (Contention receipt +25) Answers to
                                contentions whose development depends
                                upon access to SUNSI and/or SGI.
A + 60.......................  (Answer receipt +7) Petitioner/Intervenor
                                reply to answers.
B............................  Decision on contention admission.
------------------------------------------------------------------------


[[Page 45485]]

[FR Doc. E8-17697 Filed 8-4-08; 8:45 am]