[Federal Register Volume 73, Number 151 (Tuesday, August 5, 2008)]
[Notices]
[Pages 45479-45485]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E8-17697]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Notice; Applications and Amendments to Facility Operating
Licenses Involving Proposed No Significant Hazards Considerations and
Containing Sensitive Unclassified Non-Safeguards Information or
Safeguards Information and Order Imposing Procedures for Access to
Sensitive Unclassified Non-Safeguards Information or Safeguards
Information
I. Background
Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear Regulatory Commission (the
Commission or NRC staff) is publishing this notice. The Act requires
the Commission publish notice of any amendments issued, or proposed to
be issued and grants the Commission the authority to issue and make
immediately effective any amendment to an operating license upon a
determination by the Commission that such amendment involves no
significant hazards consideration, notwithstanding the pendency before
the Commission of a request for a hearing from any person.
This notice includes notices of amendments containing sensitive
unclassified non-safeguards information (SUNSI) or safeguards
information (SGI).
Notice of Consideration of Issuance of Amendments to Facility Operating
Licenses, Proposed No Significant Hazards Consideration Determination,
and Opportunity for a Hearing
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in 10 CFR 50.92, this means that operation
of the facility in accordance with the proposed amendment would not (1)
Involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
[[Page 45480]]
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking,
Directives and Editing Branch, Division of Administrative Services,
Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be delivered to Room 6D44, Two White Flint North, 11545 Rockville Pike,
Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays.
Copies of written comments received may be examined at the Commission's
Public Document Room (PDR), located at One White Flint North, Public
File Area O1F21, 11555 Rockville Pike (first floor), Rockville,
Maryland. The filing of requests for a hearing and petitions for leave
to intervene is discussed below.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this proceeding and who
wishes to participate as a party in the proceeding may file a request
for a hearing and a petition to intervene with respect to issuance of
the amendment to the subject facility operating license. Such requests
for a hearing and petitions to intervene must be written requests filed
via electronic submission through the NRC E-Filing system. Requests for
a hearing and a petition for leave to intervene shall be filed in
accordance with the Commission's ``Rules of Practice for Domestic
Licensing Proceedings'' in 10 CFR part 2. Interested person(s) should
consult a current copy of 10 CFR 2.309, which is available at the
Commission's PDR, located at One White Flint North, Public File Area
01F21, 11555 Rockville Pike (first floor), Rockville, Maryland, or at
http://www.nrc.gov/reading-rm/doc-collections/cfr/part002/part002-0309.html. Publicly available records will be accessible from the
Agencywide Documents Access and Management System's (ADAMS) Public
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. If a request for a hearing or petition for
leave to intervene is filed within 60 days, the Commission or a
presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the request and/or petition; and the Secretary or the
Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also set forth the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner/
requestor intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner/requestor intends to rely to establish those facts or expert
opinion. The petition must include sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact. Contentions shall be limited to matters within the scope of
the amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner/requestor to relief. A petitioner/
requestor who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
A request for hearing or a petition for leave to intervene must be
filed in accordance with the NRC E-Filing rule, which the NRC
promulgated in August 28, 2007 (72 FR 49139). The E-Filing process
requires participants to submit and serve documents over the internet
or in some cases to mail copies on electronic storage media.
Participants may not submit paper copies of their filings unless they
seek a waiver in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the petitioner/requestor
must contact the Office of the Secretary by e-mail at
[email protected], or by calling (301) 415-1677, to request (1) a
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
in which the petitioner/requestor (or its counsel or representative)
already holds an NRC-issued digital ID certificate). Each petitioner/
requestor will need to download the Workplace Forms Viewer\TM\ to
access the Electronic Information Exchange (EIE), a
[[Page 45481]]
component of the E-Filing system. The Workplace Forms Viewer\TM\ is
free and is available at http://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information about applying for a digital ID
certificate is available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate,
had a docket created, and downloaded the EIE viewer, it can then submit
a request for hearing or petition for leave to intervene. Submissions
should be in Portable Document Format (PDF) in accordance with NRC
guidance available on the NRC public Web site at http://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the
time the filer submits its documents through EIE. To be timely, an
electronic filing must be submitted to the EIE system no later than
11:59 p.m. Eastern Time, on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
EIE system also distributes an e-mail notice that provides access to
the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically may seek assistance through the
``Contact Us'' link located on the NRC Web site at http://www.nrc.gov/site-help/e-submittals.html or by calling the NRC technical help line,
which is available between 8 a.m. and 4:15 p.m., Eastern Time, Monday
through Friday. The help line number is (800) 397-4209 or locally,
(301) 415-4737.
Participants who believe that they have a good cause for not
submitting documents electronically must file a motion, in accordance
with 10 CFR 2.302(g), with their initial paper filing requesting
authorization to continue to submit documents in paper format. Such
filings must be submitted by: (1) First class mail addressed to the
Office of the Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier, express mail, or expedited
delivery service to the Office of the Secretary, Sixteenth Floor, One
White Flint North, 11555 Rockville, Pike, Rockville, Maryland, 20852,
Attention: Rulemaking and Adjudications Staff. Participants filing a
document in this manner are responsible for serving the document on all
other participants. Filing is considered complete by first-class mail
as of the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service.
Non-timely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission, the presiding
officer, or the Atomic Safety and Licensing Board that the petition
and/or request should be granted and/or the contentions should be
admitted, based on a balancing of the factors specified in 10 CFR
2.309(c)(1)(i)-(viii). To be timely, filings must be submitted no later
than 11:59 p.m. Eastern Time on the due date.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission, an Atomic Safety and Licensing Board, or
a Presiding Officer. Participants are requested not to include personal
privacy information, such as social security numbers, home addresses,
or home phone numbers in their filings. With respect to copyrighted
works, except for limited excerpts that serve the purpose of the
adjudicatory filings and would constitute a Fair Use application,
participants are requested not to include copyrighted materials in
their submission.
For further details with respect to this amendment action, see the
application for amendment which is available for public inspection at
the Commission's PDR, located at One White Flint North, Public File
Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible from the ADAMS Public
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. If you do not have access to ADAMS or if
there are problems in accessing the documents located in ADAMS, contact
the PDR Reference staff at 1 (800) 397-4209, (301) 415-4737 or by email
to [email protected].
FPL Energy, Point Beach, LLC, Docket No. 50-266 , Point Beach Nuclear
Plant, Unit 1, Town of Two Creeks, Manitowoc County, Wisconsin.
Date of amendment request: May 28, 2008.
Description of amendment request: This amendment request contains
sensitive unclassified non-safeguards information (SUNSI). The
amendment proposes a one cycle revision to the Point Beach Nuclear
Plant (PBNP) Unit 1 technical specifications (TS). Specifically, TS
5.5.8, ``Steam Generator (SG) Program,'' and TS 5.6.8, ``Steam
Generator Tube Inspection Report,'' will be revised to incorporate an
interim alternate repair criterion into the provisions for SG tube
repair for use during the Unit 1 2008 fall refueling outage and the
subsequent operating cycle.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
Of the various accidents previously evaluated, the proposed
changes only affect steam generator tube rupture (SGTR) event
evaluation and the postulated steam line break (SLB), locked rotor,
and control rod ejection accident evaluations.
Loss-of-coolant accident (LOCA) conditions cause a compressive
axial load to act on the tube. Therefore, since the LOCA tends to
force the tube into the tubesheet rather than pull it out, it is not
a factor in this amendment request. Another faulted load
consideration is a safe shutdown earthquake (SSE); however, the
seismic analysis of Model F steam generators has shown that axial
loading of the tubes is negligible during an SSE.
At normal operating pressures, leakage from [primary water
stress cracking corrosion] PWSCC below 17 inches from the [top of
the tubesheet] TTS is limited by both the tube-to-tubesheet crevice
and the limited crack opening permitted by the tubesheet constraint.
Consequently, negligible normal operating leakage is expected from
cracks within the tubesheet region.
For the SGTR event, the required structural margins of the steam
generator tubes is maintained by limiting the allowable ligament
size for a circumferential crack to remain in service to 203 degrees
below 17 inches from the TTS for the subsequent operating cycle.
Tube rupture is precluded for cracks in the hydraulic expansion
region due to the constraint provided by the tubesheet. The
potential for tube pullout is mitigated by limiting the allowable
crack size to 203 degrees subsequent operating cycle. These
allowable crack sizes take into account
[[Page 45482]]
eddy current uncertainty and crack growth rate. It has been shown
that a circumferential crack with an azimuthal extent of 203 degrees
for the 18-month SG tubing eddy current inspection interval meets
the performance criteria of NEI 97-06, Rev. 2, ``Steam Generator
Program Guidelines'' and Draft Regulatory Guide (RG) 1.121, ``Bases
for Plugging Degraded PWR [pressurized water reactors] Steam
Generator Tubes.'' Therefore, the margin against tube burst pullout
is maintained during normal and postulated accident conditions and
the proposed change does not result in a significant increase in the
probability or consequence of a SGTR.
The probability of a SLB is unaffected by the potential failure
of a SG tube as the failure of a tube is not an initiator for a SLB
event. SLB leakage is limited by leakage flow restrictions resulting
from the leakage path above potential cracks through the tube-to-
tubesheet crevice. The leak rate during postulated accident
conditions (including locked rotor) has been shown to remain within
the accident analysis assumptions for all axial or circumferentially
oriented cracks occurring 17 inches below the top of the tubesheet.
Since normal operating leakage is limited to 150 [gallons per day]
gpd (approximately 0.10 [gallons per minute] gpm), the attendant
accident condition leak rate, assuming all leakage to be from
indications below 17 inches from the top of the tubesheet would be
bounded by 500 gpd (approximately 0.35 gpm). This value is within
the accident analysis assumptions for the design basis accident for
PBNP.
Based on the above, the performance criteria of NEI-97-06, Rev.
2 and Draft Regulatory Guide (RG) 1.121 continue to be met and the
proposed change does not involve a significant increase in the
probability or consequences of an accident previously evaluated.
(2) Does the proposed change create the possibility of a new or
different accident from any accident previously evaluated?
Response: No.
The proposed change does not introduce any changes or mechanisms
that create the possibility of a new or different kind of accident.
Tube bundle integrity is expected to be maintained for all plant
conditions upon implementation of the interim alternate repair
criteria. The proposed change does not introduce any new equipment
or any change to existing equipment. No new effects on existing
equipment are created nor are any new malfunctions introduced.
Therefore, based on the above evaluation, the proposed changes
do not create the possibility of a new or different kind of accident
from any accident previously evaluated.
(3) Does the proposed change involve a significant reduction in
a margin of safety?
Response: No.
The proposed change maintains the required structural margins of
the steam generator tubes for both normal and accident conditions.
NEI 97-06, Revision 2 and RG I.I21 are used as the basis in the
development of the limited tubesheet inspection depth methodology
for determining that steam generator tube integrity considerations
are maintained within acceptable limits. RG 1.121 describes a method
acceptable to the NRC staff for meeting [general design criteria]
GDC 14, 15, 31, and 32 by reducing the probability and consequences
of an SGTR. PBNP GDC 9, 33, 31, 34, and 36 are similar to Appendix A
GDC 14, 15, 31, and 32. RG 1. 12 1 concludes that by determining the
limiting safe conditions of tube wall degradation beyond which tubes
with unacceptable cracking, as established by inservice inspection,
should be removed from service or repaired, the probability and
consequences of a SGTR are reduced. This RG uses safety factors on
loads for tube burst that are consistent with the requirements of
Section III of the ASME [American Society of Mechanical Engineers]
Code.
For axially oriented cracking located within the tubesheet, tube
burst is precluded due to the presence of the tubesheet. For
circumferentially oriented cracking in a tube or the tube-to-
tubesheet weld, References 2 and 4 [of the application] define a
length of remaining tube ligament that provides the necessary
resistance to tube pullout due to the pressure induced forces (with
applicable safety factors applied). Additionally, it is shown that
application of the limited tubesheet inspection depth criteria will
not result in unacceptable primary-to-secondary leakage during all
plant conditions.
Based on the above, it is concluded that the proposed changes do
not result in any reduction of margin with respect to plant safety
as defined in the Final Safety Analysis Report or Bases of the plant
Technical Specifications.
Attorney for licensee: Antonio Fernandez, Esquire, Senior Attorney,
FPL Energy Point Beach, LLC, P.O. Box 14000, Juno Beach, FL 33408-0420.
NRC Branch Chief: Lois James.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information (SUNSI) and Safeguards Information (SGI) for
Contention Preparation
FPL Energy, Point Beach, LLC, Docket No. 50-266, Point Beach Nuclear
Plant, Unit 1, Town of Two Creeks, Manitowoc County, Wisconsin
1. This order contains instructions regarding how potential parties
to the proceedings listed above may request access to documents
containing sensitive unclassified information (SUNSI and SGI).
2. Within ten (10) days after publication of this notice of
opportunity for hearing, any potential party as defined in 10 CFR 2.4
who believes access to SUNSI or SGI is necessary for a response to the
notice may request access to SUNSI or SGI. A ``potential party'' is any
person who intends or may intend to participate as a party by
demonstrating standing and the filing of an admissible contention under
10 CFR 2.309. Requests submitted later than ten (10) days will not be
considered absent a showing of good cause for the late filing,
addressing why the request could not have been filed earlier.
3. The requester shall submit a letter requesting permission to
access SUNSI and/or SGI to the Office of the Secretary, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemakings and Adjudications Staff, and provide a copy to the
Associate General Counsel for Hearings, Enforcement and Administration,
Office of the General Counsel, Washington, DC 20555-0001. The expedited
delivery or courier mail address for both offices is U.S. Nuclear
Regulatory Commission, 11555 Rockville Pike, Rockville, MD 20852. The
e-mail address for the Office of the Secretary and the Office of the
General Counsel are [email protected] and
[email protected], respectively.\1\ The request must
include the following information:
---------------------------------------------------------------------------
\1\ See footnote 6. While a request for hearing or petition to
intervene in this proceeding must comply with the filing
requirements of the NRC's ``E-Filing Rule,'' the initial request to
access SUNSI and/or SGI under these procedures should be submitted
as described in this paragraph.
---------------------------------------------------------------------------
a. A description of the licensing action with a citation to this
Federal Register notice of opportunity for hearing;
b. The name and address of the potential party and a description of
the potential party's particularized interest that could be harmed by
the action identified in (a.);
c. If the request is for SUNSI, the identity of the individual
requesting access to SUNSI and the requester's need for the information
in order to meaningfully participate in this adjudicatory proceeding,
particularly why publicly available versions of the application would
not be sufficient to provide the basis and specificity for a proffered
contention;
d. If the request is for SGI, the identity of the individual
requesting access to SGI and the identity of any expert, consultant or
assistant who will aid the requester in evaluating the SGI, and
information that shows:
(i) Why the information is indispensable to meaningful
participation in this licensing proceeding; and
(ii) The technical competence (demonstrable knowledge, skill,
experience, training or education) of the requester to understand and
use (or evaluate) the requested information to provide the basis and
specificity for a proffered contention. The technical competence of a
potential party or its counsel may be shown by reliance on a qualified
expert, consultant or assistant
[[Page 45483]]
who demonstrates technical competence as well as trustworthiness and
reliability, and who agrees to sign a non-disclosure affidavit and be
bound by the terms of a protective order; and
e. If the request is for SGI, Form SF-85, ``Questionnaire for Non-
Sensitive Positions,'' Form FD-258 (fingerprint card), and a credit
check release form completed by the individual who seeks access to SGI
and each individual who will aid the requester in evaluating the SGI.
For security reasons, Form SF-85 can only be submitted electronically,
through a restricted-access database. To obtain online access to the
form, the requester should contact the NRC's Office of Administration
at 301-415-0320. The other completed forms must be signed in original
ink, accompanied by a check or money order payable in the amount of
$191.00 to the U.S. Nuclear Regulatory Commission for each individual,
and mailed to the: \2\ Office of Administration, Security Processing
Unit, Mail Stop T-6E46, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0012.
---------------------------------------------------------------------------
\2\ The requester will be asked to provide his or her full name,
social security number, date and place of birth, telephone number,
and email address. After providing this information, the requester
usually should be able to obtain access to the online form within
one business day.
---------------------------------------------------------------------------
These forms will be used to initiate the background check, which
includes fingerprinting as part of a criminal history records check.
Note: Copies of these forms do not need to be included with the
request letter to the Office of the Secretary, but the request
letter should state that the forms and fees have been submitted as
described above.
4. To avoid delays in processing requests for access to SGI, all
forms should be reviewed for completeness and accuracy (including
legibility) before submitting them to the NRC. Incomplete packages will
be returned to the sender and will not be processed.
5. Based on an evaluation of the information submitted under items
2 and 3.a through 3.d, above, the NRC staff will determine within ten
days of receipt of the written access request whether (1) there is a
reasonable basis to believe the petitioner is likely to establish
standing to participate in this NRC proceeding, and (2) there is a
legitimate need for access to SUNSI or need to know the SGI requested.
For SGI, the need to know determination is made based on whether the
information requested is necessary (i.e., indispensable) for the
proposed recipient to proffer and litigate a specific contention in
this NRC proceeding \3\ and whether the proposed recipient has the
technical competence (demonstrable knowledge, skill, training,
education, or experience) to evaluate and use the specific SGI
requested in this proceeding.
---------------------------------------------------------------------------
\3\ Broad SGI requests under these procedures are thus highly
unlikely to meet the standard for need to know; furthermore, staff
redaction of information from requested documents before their
release may be appropriate to comport with this requirement. These
procedures do not authorize unrestricted disclosure or less scrutiny
of a requester's need to know than ordinarily would be applied in
connection with an already-admitted contention.
---------------------------------------------------------------------------
6. If standing and need to know SGI are shown, the NRC staff will
further determine based upon completion of the background check whether
the proposed recipient is trustworthy and reliable. The NRC staff will
conduct (as necessary) an inspection to confirm that the recipient's
information protection systems are sufficient to protect SGI from
inadvertent release or disclosure. Recipients may opt to view SGI at
the NRC's facility rather than establish their own SGI protection
program to meet SGI protection requirements.
7. A request for access to SUNSI or SGI will be granted if:
a. The request has demonstrated that there is a reasonable basis to
believe that a potential party is likely to establish standing to
intervene or to otherwise participate as a party in this proceeding;
b. The proposed recipient of the information has demonstrated a
need for SUNSI or a need to know for SGI, and that the proposed
recipient of SGI is trustworthy and reliable;
c. The proposed recipient of the information has executed a Non-
Disclosure Agreement or Affidavit and agrees to be bound by the terms
of a Protective Order setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI and/or SGI; and
d. The presiding officer has issued a protective order concerning
the information or documents requested.\4\ Any protective order issued
shall provide that the petitioner must file SUNSI or SGI contentions 25
days after receipt of (or access to) that information. However, if more
than 25 days remain between the petitioner's receipt of (or access to)
the information and the deadline for filing all other contentions (as
established in the notice of hearing or opportunity for hearing), the
petitioner may file its SUNSI or SGI contentions by that later
deadline.
---------------------------------------------------------------------------
\4\ If a presiding officer has not yet been designated, the
Chief Administrative Judge will issue such orders, or will appoint a
presiding officer to do so.
---------------------------------------------------------------------------
8. If the request for access to SUNSI or SGI is granted, the terms
and conditions for access to sensitive unclassified information will be
set forth in a draft protective order and affidavit of non-disclosure
appended to a joint motion by the NRC staff, any other affected parties
to this proceeding,\5\ and the petitioner(s). If the diligent efforts
by the relevant parties or petitioner(s) fail to result in an agreement
on the terms and conditions for a draft protective order or non-
disclosure affidavit, the relevant parties to the proceeding or the
petitioner(s) should notify the presiding officer within ten (10) days,
describing the obstacles to the agreement.
---------------------------------------------------------------------------
\5\ Parties/persons other than the requester and the NRC staff
will be notified by the NRC staff of a favorable access
determination (and may participate in the development of such a
motion and protective order) if it concerns SUNSI and if the party/
person's interest independent of the proceeding would be harmed by
the release of the information (e.g., as with proprietary
information).
---------------------------------------------------------------------------
9. If the request for access to SUNSI is denied by the NRC staff or
a request for access to SGI is denied by NRC staff either after a
determination on standing and need to know or, later, after a
determination on trustworthiness and reliability, the NRC staff shall
briefly state the reasons for the denial. Before the Office of
Administration makes an adverse determination regarding access, the
proposed recipient must be provided an opportunity to correct or
explain information. The requester may challenge the NRC staff's
adverse determination with respect to access to SUNSI or with respect
to standing or need to know for SGI by filing a challenge within ten
(10) days of receipt of that determination with (a) the presiding
officer designated in this proceeding; (b) if no presiding officer has
been appointed, the Chief Administrative Judge, or if he or she is
unavailable, another administrative judge, or an administrative law
judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another
officer has been designated to rule on information access issues, with
that officer. In the same manner, an SGI requester may challenge an
adverse determination on trustworthiness and reliability by filing a
challenge within fifteen (15) days of receipt of that determination.
In the same manner, a party other than the requester may challenge
an NRC staff determination granting access to SUNSI whose release would
harm that party's interest independent of the proceeding. Such a
challenge must be filed within ten (10) days of the notification by the
NRC staff of its grant of such a request.
If challenges to the NRC staff determinations are filed, these
[[Page 45484]]
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\6\
---------------------------------------------------------------------------
\6\ As of October 15, 2007, the NRC's final ``E-Filing Rule''
became effective. See Use of Electronic Submissions in Agency
Hearings (72 FR 49139; Aug. 28, 2007). Requesters should note that
the filing requirements of that rule apply to appeals of NRC staff
determinations (because they must be served on a presiding officer
or the Commission, as applicable), but not to the initial SUNSI/SGI
requests submitted to the NRC staff under these procedures.
---------------------------------------------------------------------------
10. The Commission expects that the NRC staff and presiding
officers (and any other reviewing officers) will consider and resolve
requests for access to SUNSI and/or SGI, and motions for protective
orders, in a timely fashion in order to minimize any unnecessary delays
in identifying those petitioners who have standing and who have
propounded contentions meeting the specificity and basis requirements
in 10 CFR Part 2. Attachment 1 to this Order summarizes the general
target schedule for processing and resolving requests under these
procedures.
Dated at Rockville, Maryland, this 28th day of July, 2008.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
(SUNSI) and Safeguards Information (SGI) in This Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0............................ Publication of Federal Register notice of
proposed action and opportunity for
hearing, including order with
instructions for access requests.
10........................... Deadline for submitting requests for
access to SUNSI and/or SGI with
information: Supporting the standing of
a potential party identified by name and
address; describing the need for the
information in order for the potential
party to participate meaningfully in an
adjudicatory proceeding; demonstrating
that access should be granted (e.g.,
showing technical competence for access
to SGI); and, for SGI, including
application fee for fingerprint/
background check.
60........................... Deadline for submitting petition for
intervention containing: (i)
Demonstration of standing; (ii) all
contentions whose formulation does not
require access to SUNSI and/or SGI (+25
Answers to petition for intervention; +7
petitioner/requestor reply).
20........................... NRC staff informs the requester of the
staff's determination whether the
request for access provides a reasonable
basis to believe standing can be
established and shows (1) need for SUNSI
or (2) need to know for SGI. (For SUNSI,
NRC staff also informs any party to the
proceeding whose interest independent of
the proceeding would be harmed by the
release of the information.) If NRC
staff makes the finding of need for
SUNSI and likelihood of standing, NRC
staff begins document processing
(preparation of redactions or review of
redacted documents). If NRC staff makes
the finding of need to know for SGI and
likelihood of standing, NRC staff begins
background check (including
fingerprinting for a criminal history
records check), information processing
(preparation of redactions or review of
redacted documents), and readiness
inspections.
25........................... If NRC staff finds no ``need,'' ``need to
know,'' or likelihood of standing, the
deadline for petitioner/requester to
file a motion seeking a ruling to
reverse the NRC staff's denial of
access; NRC staff files copy of access
determination with the presiding officer
(or Chief Administrative Judge or other
designated officer, as appropriate). If
NRC staff finds ``need'' for SUNSI, the
deadline for any party to the proceeding
whose interest independent of the
proceeding would be harmed by the
release of the information to file a
motion seeking a ruling to reverse the
NRC staff's grant of access.
30........................... Deadline for NRC staff reply to motions
to reverse NRC staff determination(s).
40........................... (Receipt +30) If NRC staff finds standing
and need for SUNSI, deadline for NRC
staff to complete information processing
and file motion for Protective Order and
draft Non-Disclosure Affidavit. Deadline
for applicant/licensee to file Non-
Disclosure Agreement for SUNSI.
190.......................... (Receipt +180) If NRC staff finds
standing, need to know for SGI, and
trustworthiness and reliability,
deadline for NRC staff to file motion
for Protective Order and draft Non-
disclosure Affidavit (or to make a
determination that the proposed
recipient of SGI is not trustworthy or
reliable). Note: Before the Office of
Administration makes an adverse
determination regarding access, the
proposed recipient must be provided an
opportunity to correct or explain
information.
205.......................... Deadline for petitioner to seek reversal
of a final adverse NRC staff
determination either before the
presiding officer or another designated
officer.
A............................ If access granted: Issuance of presiding
officer or other designated officer
decision on motion for protective order
for access to sensitive information
(including schedule for providing access
and submission of contentions) or
decision reversing a final adverse
determination by the NRC staff.
A + 3........................ Deadline for filing executed Non-
Disclosure Affidavits. Access provided
to SUNSI and/or SGI consistent with
decision issuing the protective order.
A + 28....................... Deadline for submission of contentions
whose development depends upon access to
SUNSI and/or SGI. However, if more than
25 days remain between the petitioner's
receipt of (or access to) the
information and the deadline for filing
all other contentions (as established in
the notice of hearing or opportunity for
hearing), the petitioner may file its
SUNSI or SGI contentions by that later
deadline.
A + 53....................... (Contention receipt +25) Answers to
contentions whose development depends
upon access to SUNSI and/or SGI.
A + 60....................... (Answer receipt +7) Petitioner/Intervenor
reply to answers.
B............................ Decision on contention admission.
------------------------------------------------------------------------
[[Page 45485]]
[FR Doc. E8-17697 Filed 8-4-08; 8:45 am]
BILLING CODE 7590-01-P