DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No.: 12548-002]
Hydrodynamics, Inc.; Notice of Paper Scoping and Soliciting
Scoping Comments and ERRATA to Tendering Notice
July 3, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Minor unconstructed project.
b. Project No.: 12548-002.
c. Date filed: April 1, 2008.
d. Applicant: Hydrodynamics, Inc.
e. Name of Project: Greenfield.
f. Location: On the Greenfields Main Canal, part of the Bureau of
Reclamation's Sun River Irrigation Project, in Teton County, Montana,
near Fairfield, Montana.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
[[Page 39957]]
h. Applicant Contact: Roger Kirk, Hydrodynamics, Inc., P.O. Box
1136, Bozeman, MT 59771, (406) 587-5086.
i. FERC Contact: Dianne Rodman, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426; telephone
(202) 502-6077 or by e-mail at [email protected].
j. Deadline for filing scoping comments: August 4, 2008.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Scoping comments may be filed electronically via the Internet in
lieu of paper. The Commission strongly encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site (http://www.ferc.gov) under the ``e-Filing'' link.
k. This application is not ready for environmental analysis at this
time.
l. The proposed Greenfield Project would be built at the
Greenfields Main Canal's Greenfield drop structure. The applicant
proposes to construct: (1) An inflatable weir spanning the width of the
canal; (2) an intake structure with trash rack and radial gate or stop-
log shut off; (3) a buried, 84-inch-diameter, 650-foot-long steel or
polyethylene penstock; (4) a powerhouse containing one Francis or
propeller (Reaction) turbine and one generator with a rated output of
600 kilowatts; (5) a tailrace about 7 feet long, returning flows to the
canal; (6) a switchyard; and (7) a 0.05-mile-long, 12-kilovolt
transmission line interconnecting with an existing powerline. Average
annual generation would be 1.5 gigawatt hours.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number, excluding the last three digits, in the
docket number field to access the document. For assistance, contact
FERC Online Support at [email protected] or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filings/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Scoping Process: The Commission intends to prepare an
Environmental Assessment (EA) on the project in accordance with the
National Environmental Policy Act of 1969, as amended.\1\ The EA will
consider both site-specific and cumulative environmental impacts and
reasonable alternatives to the proposed action.
---------------------------------------------------------------------------
\1\ One EA will be prepared for the Woods Project (FERC No. P-
12540), Johnson Project, (FERC No. P-12545), Greenfield Project
(FERC No. P-12548) and A-Drop Project (FERC No. P-12549).
---------------------------------------------------------------------------
Commission staff does not propose to conduct any on-site scoping
meetings at this time. Instead, we will solicit comments,
recommendations, information, and alternatives in the Scoping Document
(SD).
Copies of the SD outlining the subject areas to be addressed in the
EA were distributed to the parties on the Commission's mailing list.
Copies of the SD may be viewed on the Web at http://www.ferc.gov using
the ``eLibrary'' link (see item m above).
o. The tendering notice issued April 14, 2008, incorrectly stated
that the application for the Greenfield Project was filed on March 31,
2008. The correct filing date for the Greenfield Project application is
April 1, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-15789 Filed 7-10-08; 8:45 am]
BILLING CODE 6717-01-P