[Federal Register Volume 73, Number 119 (Thursday, June 19, 2008)]
[Notices]
[Pages 34922-34923]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E8-13809]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2210-175]
American Electric Power; Notice of Application for Amendment of
License And Soliciting Comments, Motions to Intervene, and Protests
June 12, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Request to increase water withdrawal for
municipal use.
b. Project No.: 2210-175.
c. Date Filed: May 27, 2008.
d. Applicant: American Electric Power.
e. Name of Project: Smith Mountain.
f. Location: Smith Mountain Lake on the Roanoke River, Bedford
County, Virginia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Frank M. Simms, American Electric Power, P.O.
Box 2021, Roanoke, Virginia 24022-2121 (540) 985-2875.
i. FERC Contact: Derek Crane, [email protected] (202) 502-8047.
j. Deadline for filing comments, motions to intervene and protests:
July 11, 2008.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: American Electric Power (AEP) proposes
to grant permission to Bedford County Public Service Authority (BCPSA)
to install a 12-inch diameter, high density polyethylene raw water
intake pipeline and associated intake structure within the Smith
Mountain Project boundary to increase water withdrawn from the Smith
Mountain Project reservoir from an annual average of 0.5 million
gallons per day (mgd) and peak of 0.999 mgd to an annual average of 2.0
mgd with a peak of 2.999 mgd. The proposed withdrawal is for municipal
use by the BCPSA, Bedford County, GA.
l. Location of the Application: The filing is available for
inspection and reproduction at the Commission's Public Reference Room,
located at 888 First Street, NE., Room 2A, Washington, DC 20426 or by
calling (202) 502-8371, or by calling (202) 502-8371. This filing may
also be viewed on the Commission's Web site at http://ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at http://www.ferc.gov/docsfiling/esubscription.asp to
be notified via e-mail of new filings and
[[Page 34923]]
issuances related to this or other pending projects. For assistance,
call 1-866-208-3676 or e-mail [email protected], for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filing must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(I)(iii) and
the instructions on the Commission's Web site at http://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-13809 Filed 6-18-08; 8:45 am]
BILLING CODE 6717-01-P