[Federal Register Volume 73, Number 54 (Wednesday, March 19, 2008)]
[Notices]
[Pages 14850-14852]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E8-5521]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-443]
Seabrook Station, Unit No. 1; Notice of Consideration of Issuance
of Amendment to Facility Operating License, Proposed No Significant
Hazards; Consideration Determination and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission or NRC) is
considering issuance of an amendment to Facility Operating License No.
NPF-86 issued to FPL Energy Seabrook, LLC (the licensee) for operation
of Seabrook Station, Unit No. 1, located in Rockingham County, New
Hampshire.
The proposed amendment would revise Technical Specification (TS)
Table 4.3-1, ``Reactor Trip System Instrumentation Surveillance
Requirements'' to require the initial plateau curves to be measured
within 24 hours after attaining 100 percent steady-state power.
Currently, initial plateau curves are required to be taken within 24
hours of entry into Mode 2.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in Title 10 of the Code of Federal Regulations
(10 CFR), Section 50.92, this means that operation of the facility in
accordance with the proposed amendment would not: (1) Involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
The probability or consequences of accidents previously
evaluated in the [Updated Final Safety Analysis Report] are
unaffected by this proposed change. The duration for obtaining
neutron detector plateau curves is not an initiator of any accident
previously analyzed. There is no change to any equipment response or
accident scenario, and this change results in no additional
challenges to fission product barrier integrity. The proposed change
does not alter the design, configuration, operation, or function of
any plant system, structure, or component.
The requested amendment modifies the frequency of the channel
calibrations for the intermediate and power range detectors by
permitting 24 hours to perform the SR [surveillance requirement]
(measure and obtain neutron detector plateau curves) after achieving
steady-state operation at rated thermal power. This change has no
impact on the consequences or probability of any accident previously
evaluated. The proposed change does not impact the ability of the
nuclear instrumentation, reactor protection system, or any other
system, structure, or component to perform its intended function to
mitigate the consequences of an accident within acceptable limits.
The proposed change does not affect the source term, containment
isolation, or radiological assumptions used in analyzing the
consequences of accidents previously evaluated. Further, the
proposed change neither increases the type or amount of
radioactivity released offsite nor increases public or occupational
radiation exposures. Therefore, the proposed change does not involve
a significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
No new accident scenarios, failure mechanisms, or limiting
single failures are introduced as a result of the proposed change.
The proposed change does not challenge the performance or integrity
of any safety-related system. The proposed change neither installs
nor removes any plant equipment, and it does not alter the design,
physical configuration, or operation of any plant structure, system,
or component. No physical changes are being made to the plant, so no
new accident causal mechanisms are being introduced. Therefore, the
proposed change does not create the possibility of a new or
different kind of accident from any previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
The margin of safety associated with the acceptance criteria of
any accident is unchanged. The proposed change will have no affect
on the operability or performance of the safety-related systems and
components. The proposed change does not alter the design,
configuration, operation, or function of any plant system,
structure, or component. The ability of any operable structure,
system, or component to perform its designated safety function is
unaffected by this change. With this change, the TS will continue to
require operable nuclear instrumentation. The proposed change does
not create an initiating event, increase the likelihood of an
initiating event, affect the ability to mitigate an event, affect
containment performance, or affect operator actions in response to
an event. Therefore, the margin of safety as defined in the TS is
not reduced and the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example, in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that
[[Page 14851]]
the need to take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking,
Directives and Editing Branch, Division of Administrative Services,
Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be delivered to Room 6D59, Two White Flint North, 11545 Rockville Pike,
Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays.
Documents may be examined, and/or copied for a fee, at the NRC's Public
Document Room (PDR), located at One White Flint North, Public File Area
O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
The filing of requests for hearing and petitions for leave to
intervene is discussed below.
Within 60 days after the date of publication of this notice, the
person(s) may file a request for a hearing with respect to issuance of
the amendment to the subject facility operating license, and any
person(s) whose interest may be affected by this proceeding and who
wishes to participate as a party in the proceeding must file a written
request via electronic submission through the NRC E-filing system for a
hearing and a petition for leave to intervene. Requests for a hearing
and a petition for leave to intervene shall be filed in accordance with
the Commission's ``Rules of Practice for Domestic Licensing
Proceedings'' in 10 CFR Part 2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is available at the Commission's
PDR, located at One White Flint North, Public File Area O1F21, 11555
Rockville Pike (first floor), Rockville, Maryland. Publicly available
records will be accessible from the Agencywide Documents Access and
Management System's (ADAMS) Public Electronic Reading Room on the
Internet at the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to
intervene is filed by the above date, the Commission or a presiding
officer designated by the Commission or by the Chief Administrative
Judge of the Atomic Safety and Licensing Board Panel, will rule on the
request and/or petition; and the Secretary or the Chief Administrative
Judge of the Atomic Safety and Licensing Board will issue a notice of a
hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted, with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A petitioner/requestor
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
Non-timely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission or the presiding
officer of the Atomic Safety and Licensing Board that the petition,
request and/or the contentions should be granted based on a balancing
of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii).
A request for hearing or a petition for leave to intervene must be
filed in accordance with the NRC E-Filing rule, which the NRC
promulgated on August 28, 2007 (72 FR 49139). The E-Filing process
requires participants to submit and serve documents over the internet
or in some cases to mail copies on electronic storage media.
Participants may not submit paper copies of their filings unless they
seek a waiver in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
five (5) days prior to the filing deadline, the petitioner/requestor
must contact the Office of the Secretary by e-mail at
[email protected], or by calling (301) 415-1677, to request: (1) A
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
in which the petitioner/requestor (or its counsel or representative)
already holds an NRC-issued digital ID certificate). Each petitioner/
requestor will need to download the Workplace Forms ViewerTM
to access the Electronic Information Exchange (EIE), a component of the
E-Filing system. The Workplace Forms ViewerTM is free and is
available at http://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information about applying for a digital ID certificate is
available on NRC's public Web site at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate,
had a docket created, and downloaded the EIE viewer, it can then submit
a request for hearing or petition for leave to intervene. Submissions
should be in Portable Document Format (PDF) in accordance with NRC
guidance available on the NRC public Web site at
[[Page 14852]]
http://www.nrc.gov/site-help/e-submittals.html. A filing is considered
complete at the time the filer submits its documents through EIE. To be
timely, an electronic filing must be submitted to the EIE system no
later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
EIE system also distributes an e-mail notice that provides access to
the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically may seek assistance through the
``Contact Us'' link located on the NRC Web site at http://www.nrc.gov/site-help/e-submittals.html or by calling the NRC technical help line,
which is available between 8:30 a.m. and 4:15 p.m., Eastern Time,
Monday through Friday. The help line number is (800) 397-4209 or
locally, (301) 415-4737. Participants who believe that they have a good
cause for not submitting documents electronically must file a motion,
in accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service.
Non-timely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission, the presiding
officer, or the Atomic Safety and Licensing Board that the petition
and/or request should be granted and/or the contentions should be
admitted, based on a balancing of the factors specified in 10 CFR
2.309(c)(1)(i)-(viii). To be timely, filings must be submitted no later
than 11:59 p.m. Eastern Time on the due date.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
http://www.nrc.gov/about-nrc/regulatory/adjudicatory.html, unless
excluded pursuant to an order of the Commission, an Atomic Safety and
Licensing Board, or a Presiding Officer. Participants are requested not
to include personal privacy information, such as social security
numbers, home addresses, or home phone numbers in their filings. With
respect to copyrighted works, except for limited excerpts that serve
the purpose of the adjudicatory filings and would constitute a Fair Use
application, Participants are requested not to include copyrighted
materials in their submissions.
For further details with respect to this license amendment
application, see the application for amendment dated February 16, 2007,
which is available for public inspection at the Commission's PDR,
located at One White Flint North, File Public Area O1F21, 11555
Rockville Pike (first floor), Rockville, Maryland. Publicly available
records will be accessible from the Agencywide Documents Access and
Management System's (ADAMS) Public Electronic Reading Room on the
Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS, should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-
mail to [email protected].
Dated at Rockville, Maryland, this 12th day of March, 2008.
For the Nuclear Regulatory Commission.
G. Edward Miller,
Project Manager, Plant Licensing Branch 1-2, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. E8-5521 Filed 3-18-08; 8:45 am]