Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New License for Major Project--Existing
Dam.
b. Project No.: P-67-113.
c. Date Filed: February 23, 2007.
d. Applicant: Southern California Edison Company.
e. Name of Project: Big Creek Nos. 2A, 8 and Eastwood Power Station
Hydroelectric Power Project.
f. Location: The Big Creek Nos. 2A, 8 and Eastwood Hydroelectric
Project is located in Fresno County, California near the town of Shaver
Lake within the South Fork San Joaquin River, Big Creek, and Stevenson
Creek watersheds. The project affects 2,143.25 acres of federal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Russ W. Krieger, Vice President, Power
Production, Southern California Edison Company, 300 North Lone Hill
Ave., San Dimas, California 91773. Phone: (909) 394-8667.
i. FERC Contact: Jim Fargo, (202) 502-6095, or e-mail:
[email protected].
j. Deadline for filing motions to intervene and protests: 60 days
from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Motions to intervene and protests may be filed electronically via
the Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (http://www.ferc.gov) under the ``e-
Filing'' link.
k. This application has been accepted, but is not ready for
environmental analysis at this time.
l. Description of Project: The existing Big Creek Nos. 2A, 8 and
Eastwood Power Station Hydroelectric Power Project consists of two
powerhouses and an underground power station; two major dams and
reservoirs; five moderate-sized dams forming two forebays and three
small diversion pools; eight small diversions; six water conveyance
systems; and one transmission line. The project would have an average
annual generation of 1,125,429 megawatt-hours.
Powerhouses and powerstation (i) Big Creek Powerhouse No.
2A with two turbine/generator units and a total dependable operating
capacity of about 98.5 MW; (ii) Powerhouse No. 8 with two turbine/
generator units and a dependable operating capacity of about 64.5 MW;
and (iii) Eastwood Power Station, with one turbine/pump/generator unit
and a dependable operating capacity of about 207 MW.
Major dams and reservoirs (i) Shaver Dam, forming Shaver
Lake, which has a usable storage capacity of about 135,568 ac-ft, at an
elevation of about 5,370 ft above mean sea level (msl); and (ii)
Florence Dam, forming Florence Lake, which has a usable storage
capacity of about 64,406 ac-ft, at an elevation of about 7,327 ft above
msl.
Moderate-sized dams, forebays and diversion pools (i)
Balsam Forebay, with a usable storage capacity of about 1,547 ac-ft, at
an elevation of about 6,670 ft above msl; (ii) Dam 5 Impoundment
(Powerhouse 8 Forebay), with a usable storage capacity of 49 ac-ft, at
an elevation of about 2,943 ft above msl; (iii) Pitman Diversion Pool,
with a usable capacity of about 1 ac-ft, at an elevation of about 6,900
ft above msl; (iv) Bear Diversion Pool, with a usable capacity of about
103 ac-ft, at an elevation of about 7,350 ft above msl; and (v) Mono
Diversion Pool, with a usable capacity of about 47 ac-ft, at an
elevation of about 7,350 ft above msl.
Small diversions (i) Hooper Creek Diversion, with a usable
capacity of about 3 ac-ft, at an elevation of about 7,505 ft above msl;
(ii) Bolsillo Creek Diversion, with a usable capacity of less than 1
ac-ft, at an elevation of about 7,535 ft above msl; (iii) Chinquapin
Creek Diversion, with a usable capacity of less than 1 ac-ft, at an
elevation of about 7,629 ft above msl; (iv) Camp 62 Creek Diversion,
with a usable capacity of less than 1 ac-ft, at an elevation of about
7,307 ft above msl.
Water conveyance systems (i) Ward Tunnel, about 12.8 miles
long, conveys water from Florence Lake to Huntington Lake (Huntington
Lake is a component of FERC Project No. 2175) and has a conveyance
capacity of about 1,760 cubic feet per second (cfs). The tunnel
receives water from Florence Lake, Mono Creek, Bear Creek, the small
tributaries discussed above, and the East and West Forks of Camp 61
Creek (via Portal Forebay, a component of the Portal Project, (FERC
Project No. 2174); (ii) Mono-Bear Siphon, about 1.6 miles of flowline
from Mono Diversion and 1.4 miles of flowline and tunnel from Bear
Creek Diversion connect at the Mono-Bear Wye and continues for about
2.6 miles through a combined flowline/
[[Page 38079]]
siphon, conveys water from the Mono and Bear diversions to Ward Tunnel.
The Mono Tunnel and Bear Tunnel have conveyance capacities of 450 cfs
each and the combined flowline/siphon has a conveyance capacity of
about 650 cfs; (iii) Huntington-Pitman-Shaver Conduit, also known as
Tunnel No. 7, conveys water from Huntington Lake and the Pitman Creek
Diversion to Shaver Lake through either North Fork Stevenson Creek or
through Balsam Forebay and the Eastwood Power Station. Tunnel No. 7 is
about 5.4 miles long and terminates at Gate No. 2 tunnel outlet located
on North Fork Stevenson Creek upstream of Shaver Lake. The Balsam
Diversion Tunnel is about 1.1 miles long and branches off Tunnel No. 7
about 1,200 ft upstream of the Gate No. 2 outlet, connecting to Balsam
Forebay; (iv) Eastwood Power Station and Tailrace Tunnels, which convey
water from Balsam Forebay through the Eastwood Power Station to Shaver
Lake. The Eastwood Power Station Tunnel is about 1 mile long. The
Tailrace Tunnel is about 1.4 miles long. The conveyance capacity of the
tunnels is about 2,500 cfs. (v) Tunnel No. 5, about 2.6 miles long,
conveys water from Shaver Lake to Big Creek Powerhouse No. 2A and has a
conveyance capacity of about 650 cfs. (vi)Tunnel No. 8, about 1 mile
long, conveys water from the Dam No. 5 Impoundment just downstream of
Powerhouse 2/2A to Powerhouse No. 8, has a conveyance capacity of about
1,173 cfs.
Transmission line (i) Eastwood Power Station-Big Creek 1
Transmission Line, which connects Eastwood Power Station to a non-
Project switchyard at Big Creek Powerhouse No. 1. This transmission
line is about 4.7 miles long, and is a 220kV line.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at: http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the three digits in the docket
number field to access the document. For assistance, please contact
FERC Online Support at [email protected] or toll free at (866)
208-3676, or for TTY, contact (202) 502-8659. A copy is also available
for inspection and reproduction at the address in item h above.
You may also register online at: http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) Bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application.
Kimberly D. Bose,
Secretary.
[FR Doc. E7-13521 Filed 7-11-07; 8:45 am]
BILLING CODE 6717-01-P