[Federal Register Volume 72, Number 74 (Wednesday, April 18, 2007)]
[Notices]
[Pages 19553-19554]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E7-7373]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Preclosure Safety Analysis--Level of Information and Reliability
Estimation; Availability of Final Interim Staff Guidance Document
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of issuance; correction.
-----------------------------------------------------------------------
SUMMARY: This document corrects a notice, appearing in the Federal
Register on March 22, 2007 (72 FR 13534), that announces the
availability of a final interim staff guidance document on ``Preclosure
Safety
[[Page 19554]]
Analysis--Level of Information and Reliability Estimation.'' This
action is necessary to correct typographical errors.
FOR FURTHER INFORMATION, CONTACT: Jon Chen, Project Manager, Division
of High-Level Waste Repository Safety, Office of Nuclear Material
Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001 [Telephone: (301) 415-5526; fax number: (301) 415-5399;
e-mail: [email protected].]
SUPPLEMENTARY INFORMATION: On page 13534, in the middle column, in the
first paragraph, last sentence, ``waste at a geologic repository'' is
changed to ``waste geologic repository.''
On page 13536, in the middle column, in the fourth complete
paragraph, lines 4-5, ``DOE should to consider'' is changed to read
``DOE should consider.''
On page 13536, in the middle column, in the fourth complete
paragraph, lines 7-8, ``DOE should to provide'' is changed to read
``DOE should provide.''
On page 13537, in the third column, in the eighth complete
paragraph, lines 1-2, ``Lines 445: Though 453: [lgr] was changed to, to
distinguish this quantity'' is changed to ``Lines 445 through 453:
[lgr] was changed to p to distinguish this quantity.''
Dated at Rockville, Maryland, this 11th day of April, 2007.
For the Nuclear Regulatory Commission.
N. King Stablein,
Chief Project-Management Branch B, Division of High-Level Repository
Safety, Office of Nuclear Material Safety and Safeguards.
[FR Doc. E7-7373 Filed 4-17-07; 8:45 am]
BILLING CODE 7590-01-P