[Federal Register Volume 72, Number 60 (Thursday, March 29, 2007)]
[Notices]
[Pages 14794-14795]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E7-5699]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 659-014]
Crisp County Power Commission; Notice of Application and
Applicant-Prepared EA Accepted for Filing, Soliciting Motions To
Intervene and Protests, and Soliciting Comments, Final Recommendations,
Terms and Conditions, and Prescriptions
March 22, 2007.
Take notice that the following hydroelectric application and
applicant-prepared environmental assessment has been filed with the
Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 659-014.
c. Date filed: August 3, 2006.
d. Applicant: Crisp County Power Commission.
e. Name of Project: Lake Blackshear Hydroelectric Project.
f. Location: On the Flint River in Worth, Lee, Sumter, Dooly, and
Crisp Counties, near Cordele, Georgia. The project does not occupy
Federal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Steve Rentfrow, General Manager, Crisp County
Power Commission, 202 South 7th Street, Cordele, GA 31015, Phone: 229-
273-3811.
i. FERC Contact: Allyson Conner at (202) 502-6082, or
[email protected].
j. Deadline for filing motions to intervene and protests, comments,
and final recommendations, terms and conditions, and prescriptions is
60 days from the issuance of this notice; reply comments are due 105
days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Philis J. Posey, Acting Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Motions to intervene and protests, comments, recommendations, terms
and conditions, and prescriptions may be filed electronically via the
Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (http://www.ferc.gov) under the ``e-
Filing'' link.
k. This application has been accepted for filing.
l. Description of Project: The Lake Blackshear Project is located
on the Flint River at river mile 134.7. The project includes the
following constructed facilities: (1) A 4,462-foot-long dam consisting
of (a) a 3,410-foot-long, 30-foot-maximum height north embankment with
a crest elevation of 247.0 feet mean sea level (msl) and containing a
630-foot-long concrete auxiliary spillway section with a crest
elevation of 238.0 feet msl, (b) a 402-foot-long, 46-foot-maximum
height gated spillway with fourteen 25-foot-wide by 17-foot-high
Tainter gates, (c) a 150-foot-long, 77-foot-wide, 49-foot-high combined
powerhouse and intake section integral with the dam, containing one
Francis fixed-blade propeller turbine, two vertical shaft propeller
turbines, and one vertical shaft Kaplan turbine each coupled to
generating units with a total generating capacity of 15.2 megawatts,
and (d) a 650-foot-long, 30-foot-high south embankment, with the crest
at elevation 247.5 feet msl; (2) an 8,700-acre reservoir at a normal
maximum water surface elevation of 237.0 feet msl, with 34,800 acre-
feet of usable storage; and (3) appurtenant facilities. The average
annual generation is estimated to be about 47,414 megawatt-hours. The
applicant has no plans to modify existing project facilities or
operations.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at [email protected] or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
[[Page 14795]]
n. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules of Practice and Procedure,
18 CFR 385.210, 385.211, 385.214. In determining the appropriate action
to take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must: (1) Bear in all capital letters the title
``PROTEST,'' ``MOTION TO INTERVENE,'' ``COMMENTS,'' ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;''
(2) set forth in the heading the name of the applicant and the project
number of the application to which the filing responds; (3) furnish the
name, address, and telephone number of the person protesting or
intervening; and (4) otherwise comply with the requirements of 18 CFR
385.2001 through 385.2005. All comments, recommendations, terms and
conditions or prescriptions must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may
obtain copies of the application directly from the applicant. A copy of
any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
o. A license applicant must file, no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Philis J. Posey,
Acting Secretary.
[FR Doc. E7-5699 Filed 3-28-07; 8:45 am]
BILLING CODE 6717-01-P