NUCLEAR REGULATORY COMMISSION
[Docket No. 50-293]
Pilgrim Nuclear Power Station, Entergy Nuclear Operations, Inc.;
Notice of Consideration of Issuance of Amendment to Facility Operating
License, Proposed No Significant Hazards; Consideration Determination,
and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is
considering issuance of an amendment to Facility Operating License No.
DPR-35 issued to Entergy Nuclear Operations, Inc. (the licensee) for
operation of the Pilgrim Nuclear Power Station (Pilgrim), located in
Plymouth County, Massachusetts.
The proposed amendment would revise Limiting Condition for
Operation (LCO) 3.14.A to adopt the Technical Specification Task Force-
484, Revision 0, ``Use of Technical Specification 3.10.1 for Scram Time
Testing Activities.''
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in Title 10 of the Code of Federal Regulations
(10 CFR), Section 50.92, this means that operation of the facility in
accordance with the proposed amendment would not (1) involve a
significant increase in the probability or consequences of an accident
previously evaluated; (2) create the possibility of a new or different
kind of accident from any accident previously evaluated; or (3) involve
a significant reduction in a margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its analysis of the issue of no
significant hazards consideration, which is presented below:
Criterion 1--The Proposed Change Does Not Involve a Significant
Increase in the Probability or Consequences of an Accident Previously
Evaluated
Technical Specifications currently allow for operation at
greater than [200][deg]F while imposing MODE 4 requirements in
addition to the secondary containment requirements required to be
met. Extending the activities that can apply this allowance will not
adversely impact the probability or consequences of an accident
previously evaluated.
[[Page 7777]]
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
Criterion 2--The Proposed Change Does Not Create the Possibility of a
New or Different Kind of Accident From Any Previously Evaluated
Technical Specifications currently allow for operation at
greater than [200][deg]F while imposing MODE 4 requirements in
addition to the secondary containment requirements required to be
met. No new operational conditions beyond those currently allowed by
LCO 3.10.1 are introduced. The changes do not involve a physical
alteration of the plant (i.e., no new or different type of equipment
will be installed) or a change in the methods governing normal plant
operation. In addition, the changes do not impose any new or
different requirements or eliminate any existing requirements. The
changes do not alter assumptions made in the safety analysis. The
proposed changes are consistent with the safety analysis assumptions
and current plant operating practice.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
Criterion 3--The Proposed Change Does Not Involve a Significant
Reduction in a Margin of Safety
Technical Specifications currently allow for operation at
greater than [200][deg]F while imposing MODE 4 requirements in
addition to the secondary containment requirements required to be
met. Extending the activities that can apply this allowance will not
adversely impact any margin of safety. Allowing completion of
inspections and testing and supporting completion of scram time
testing initiated in conjunction with an inservice leak or
hydrostatic test prior to power operation results in enhanced safe
operations by eliminating unnecessary maneuvers to control reactor
temperature and pressure.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example, in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking,
Directives and Editing Branch, Division of Administrative Services,
Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be delivered to NRC's Public Document Room (PDR), located at One White
Flint North, Public File Area O1F21, 11555 Rockville Pike (first
floor), Rockville, Maryland.
The filing of requests for hearing and petitions for leave to
intervene is discussed below.
Within 60 days after the date of publication of this notice, the
licensee may file a request for a hearing with respect to issuance of
the amendment to the subject facility operating license and any person
whose interest may be affected by this proceeding and who wishes to
participate as a party in the proceeding must file a written request
for a hearing and a petition for leave to intervene. Requests for a
hearing and a petition for leave to intervene shall be filed in
accordance with the Commission's ``Rules of Practice for Domestic
Licensing Proceedings'' in 10 CFR Part 2. Interested persons should
consult a current copy of 10 CFR 2.309, which is available at the
Commission's PDR, located at One White Flint North, Public File Area
O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly-available records will be accessible from the Agencywide
Documents Access and Management System's (ADAMS) Public Electronic
Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition
for leave to intervene is filed by the above date, the Commission or a
presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the request and/or petition; and the Secretary or the
Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requester/petitioner's interest. The petition must
also identify the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A petitioner/requestor
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to
[[Page 7778]]
participate fully in the conduct of the hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
Nontimely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission or the presiding
officer of the Atomic Safety and Licensing Board that the petition,
request and/or the contentions should be granted based on a balancing
of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii).
A request for a hearing or a petition for leave to intervene must
be filed by: (1) First class mail addressed to the Office of the
Secretary of the Commission, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, Attention: Rulemaking and Adjudications
Staff; (2) courier, express mail, and expedited delivery services:
Office of the Secretary, Sixteenth Floor, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and
Adjudications Staff; (3) E-mail addressed to the Office of the
Secretary, U.S. Nuclear Regulatory Commission, [email protected];
or (4) facsimile transmission addressed to the Office of the Secretary,
U.S. Nuclear Regulatory Commission, Washington, DC, Attention:
Rulemakings and Adjudications Staff at (301) 415-1101, verification
number is (301) 415-1966. A copy of the request for hearing and
petition for leave to intervene should also be sent to the Office of
the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, and it is requested that copies be transmitted either by
means of facsimile transmission to 301-415-3725 or by e-mail to
[email protected]. A copy of the request for hearing and petition
for leave to intervene should also be sent to Travis C. McCullough,
Assistant General Counsel, Entergy Nuclear Operations, Inc., 400
Hamilton Avenue, White Plains, NY 10601, attorney for the licensee.
For further details with respect to this action, see the
application for amendment dated December 27, 2006, which is available
for public inspection at the Commission's PDR, located at One White
Flint North, File Public Area O1 F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly-available records will be
accessible from the ADAMS Public Electronic Reading Room on the
Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS, should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-
mail to [email protected].
For The Nuclear Regulatory Commission.
Dated at Rockville, Maryland, this 8th day of February 2007.
James Kim,
Project Manager, Plant Licensing Branch I-1, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.