NUCLEAR REGULATORY COMMISSION


Advisory Committee On Reactor Safeguards; Meeting Notice

    In accordance with the purposes of Sections 29 and 182b. of the 
Atomic Energy Act (42 U.S.C. 2039, 2232b), the Advisory Committee on 
Reactor Safeguards (ACRS) will hold a meeting on March 8-10, 2007, 
11545 Rockville Pike, Rockville, Maryland. The date of this meeting was 
previously published in the Federal Register on Wednesday, November 15, 
2006 (71 FR 66561).

Thursday, March 8, 2007, Conference Room T-2B3, Two White Flint North, 
Rockville, Maryland

    8:30 a.m.-8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)--
The ACRS Chairman will make opening remarks regarding the conduct of 
the meeting.
    8:35 a.m.-10:15 a.m.: Technical Basis Associated with the Proposed 
NRC Staff Action for Dealing with the Dissimilar Metal Weld Issue 
(Open/Closed)--The Committee will hear presentations by and hold 
discussions with representatives of the NRC staff, their contractors, 
and the Nuclear Energy Institute regarding the technical basis for the 
proposed regulatory action for dealing with the dissimilar metal weld 
issue stemming from the Wolf Creek pressurizer weld flaws, as well as 
the industry activities associated with this matter.


    Note: A portion of this session may be closed to discuss 
industry proprietary information applicable to this matter, pursuant 
to 5 U.S.C. 552b(c)(4).


    10:30 a.m.-12 noon: Proposed Revisions to Standard Review Plan 
(SRP) Sections (Open)--The Committee will hear presentations by and 
hold discussions with representatives of the NRC staff regarding SRP 
Sections 15.0, Accident Analysis--Introduction, and 15.9, BWR Core 
Stability.
    1:30 p.m.-3:30 p.m.: Final Results of the Chemical Effects Head 
Loss Tests Related to the Resolution of the PWR Sump Performance Issues 
(Open)--The Committee will hear presentations by and hold discussions 
with representatives of the NRC staff regarding final results of the 
chemical effects head loss tests in a pressurized water reactor (PWR) 
sump pool environment, and related matters.
    3:45 p.m.-5:15 p.m.: Technology Neutral Licensing Framework and 
Related Matters (Open)--The Committee will hear presentations by and 
hold discussions with representatives of the NRC staff regarding the 
Technology Neutral Licensing Framework, and the Commission request in 
the November 8, 2006 Staff Requirements Memorandum that the ACRS 
provide its views to the Commission with respect to the staff's work on 
Technology Neutral Licensing Framework with the focus on ensuring the 
value of such an approach versus the development of a licensing 
framework for specific designs.
    5:30 p.m.-7 p.m.: Preparation of ACRS Reports (Open)--The Committee 
will discuss proposed ACRS reports on matters considered during this 
meeting, as well as a proposed ACRS report on the TRACE thermal-
hydraulic system analysis code.

Friday, March 9, 2007, Conference Room T-2B3, Two White Flint North, 
Rockville, Maryland

    8:30 a.m.-8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)--
The ACRS Chairman will make opening remarks regarding the conduct of 
the meeting.
    8:35 a.m.-9 a.m.: Proposed Revisions to Regulatory Guides and SRP 
Sections in Support of New Reactor Licensing (Open)--The Committee will 
discuss and determine whether to review proposed revisions to certain 
regulatory guides and Standard Review Plan (SRP) Sections related to 
new reactor licensing.
    9 a.m.-9:45 a.m.: Future ACRS Activities/Report of the Planning and 
Procedures Subcommittee (Open)--The Committee will discuss the 
recommendations of the Planning and Procedures Subcommittee regarding 
items proposed for consideration by the full Committee during future 
meetings. Also, it will hear a report of the Planning and Procedures 
Subcommittee on matters related to the conduct of ACRS business, 
including anticipated workload and member assignments.
    9:45 a.m.-10 a.m.: Reconciliation of ACRS Comments and 
Recommendations (Open)--The Committee will discuss the responses from 
the NRC Executive Director for Operations to comments and 
recommendations included in recent ACRS reports and letters.
    10:15 a.m.-12 noon: Safeguards and Security Matters (Closed) (Room 
T-8E8)--The Committee will hear presentations by and hold discussions 
with representatives of the NRC staff regarding the research on 
mitigating strategies for new reactor designs.


    Note: This session will be closed to protect information 
classified as National Security information as well as safeguards 
information pursuant to 5 U.S.C. 552b(c)(1) and (3).

    1:30 p.m.-6:30 p.m.: Preparation of ACRS Reports (Open)--The 
Committee will discuss proposed ACRS reports.

Saturday, March 10, 2007, Conference Room T-2B3, Two White Flint North, 
Rockville, Maryland

    8:30a.m.-12:30 p.m.: Preparation of ACRS Reports (Open)--The 
Committee will continue discussion of proposed ACRS reports.
    12:30 p.m.-1 p.m.: Miscellaneous (Open)--The Committee will discuss 
matters related to the conduct of Committee activities and matters and 
specific issues that were not completed during previous meetings, as 
time and availability of information permit.
    Procedures for the conduct of and participation in ACRS meetings 
were published in the Federal Register on October 2, 2006 (71 FR 
58015). In accordance with those procedures, oral or written views may 
be presented by members of the public, including representatives of the 
nuclear industry. Electronic recordings will be permitted only during 
the open portions of the meeting. Persons desiring to make oral 
statements should notify the Cognizant ACRS staff named below five days 
before the meeting, if possible, so that

[[Page 7482]]

appropriate arrangements can be made to allow necessary time during the 
meeting for such statements. Use of still, motion picture, and 
television cameras during the meeting may be limited to selected 
portions of the meeting as determined by the Chairman. Information 
regarding the time to be set aside for this purpose may be obtained by 
contacting the Cognizant ACRS staff prior to the meeting. In view of 
the possibility that the schedule for ACRS meetings may be adjusted by 
the Chairman as necessary to facilitate the conduct of the meeting, 
persons planning to attend should check with the Cognizant ACRS staff 
if such rescheduling would result in major inconvenience.
    In accordance with Subsection 10(d) P.L. 92-463, I have determined 
that it will be necessary to close portions of this meeting to discuss 
industry proprietary information, pursuant to 5 U.S.C. 552b(c)(4) and 
to protect information classified as National Security information as 
well as safeguards information pursuant to 5 U.S.C. 552b(c)(1) and (3).
    Further information regarding topics to be discussed, whether the 
meeting has been canceled or rescheduled, as well as the Chairman's 
ruling on requests for the opportunity to present oral statements and 
the time allotted therefor can be obtained by contacting Mr. Sam 
Duraiswamy, Cognizant ACRS staff (301-415-7364), between 7:30 a.m. and 
4 p.m., (ET).
    ACRS meeting agenda, meeting transcripts, and letter reports are 
available through the NRC Public Document Room at [email protected], or by 
calling the PDR at 1-800-397-4209, or from the Publicly Available 
Records System (PARS) component of NRC's document system (ADAMS) which 
is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html or http://www.nrc.gov/reading-rm/doc-collections/ (ACRS & 
ACNW Mtg schedules/agendas).
    Videoteleconferencing service is available for observing open 
sessions of ACRS meetings. Those wishing to use this service for 
observing ACRS meetings should contact Mr. Theron Brown, ACRS Audio 
Visual Technician (301-415-8066), between 7:30 a.m. and 3:45 p.m., 
(ET), at least 10 days before the meeting to ensure the availability of 
this service. Individuals or organizations requesting this service will 
be responsible for telephone line charges and for providing the 
equipment and facilities that they use to establish the 
videoteleconferencing link. The availability of videoteleconferencing 
services is not guaranteed.

     Dated: February 9, 2007.
Andrew L. Bates,
Advisory Committee Management Officer.
[FR Doc. E7-2669 Filed 2-14-07; 8:45 am]