[Federal Register Volume 72, Number 19 (Tuesday, January 30, 2007)]
[Notices]
[Pages 4300-4302]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E7-1417]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-261]


Carolina Power and Light; Notice of Consideration of Issuance of 
Amendment to Facility Operating License, Proposed No Significant 
Hazards Consideration Determination, and Opportunity for a Hearing

    The U.S. Nuclear Regulatory Commission (the Commission) is 
considering issuance of an amendment to Renewed Facility Operating 
License No. DPR-23 issued to Carolina Power and Light (the licensee) 
for operation of the H. B. Robinson Steam Electric Plant (HBRSEP), Unit 
No. 2 located in Darlington County, South Carolina.
    The proposed amendment would modify Technical Specification (TS) 
5.5.9 to add steam generator (SG) alternate repair criteria and TS 
5.6.8 to add additional SG reporting requirements.
    Before issuance of the proposed license amendment, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended (the Act), and the Commission's regulations.
    The Commission has made a proposed determination that the amendment 
request involves no significant hazards consideration. Under the 
Commission's regulations in Title 10 of the CODE OF FEDERAL REGULATIONS 
(10 CFR), Section 50.92, this means that operation of the facility in 
accordance with the proposed amendment would not (1) Involve a 
significant increase in the probability or consequences of an accident 
previously evaluated; or (2) create the possibility of a new or 
different kind of accident from any accident previously evaluated; or 
(3) involve a significant reduction in a margin of safety. As required 
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue 
of no significant hazards consideration, which is presented below:

    1. The Proposed Change Does Not Involve a Significant Increase 
in the Probability or Consequences of an Accident Previously 
Evaluated.
    The proposed change does not involve physical changes to any 
plant structure, system, or component. The inspection of the portion 
of the steam generator tubes within the tubesheet region is being 
changed to identify the appropriate scope of inspection and the 
criteria for plugging tubes that are found with degradation. The 
proposed requirements will continue to ensure that the probability 
of a steam generator tube rupture accident is not increased. 
Therefore, the probability of occurrence for a previously analyzed 
accident is not significantly

[[Page 4301]]

increased. The consequences of a previously analyzed accident are 
dependent on the initial conditions assumed for the analysis, the 
behavior of the fission product barriers during the analyzed 
accident, the availability and successful functioning of the 
equipment assumed to operate in response to the analyzed event, and 
the setpoints at which these actions are initiated. The proposed 
inspection and repair requirements will ensure that the plant 
continues to meet applicable design and safety analyses acceptance 
criteria. The proposed change does not affect the performance of any 
equipment used to mitigate the consequences of an analyzed accident. 
As a result, no analysis assumptions are impacted and there are no 
adverse effects on the factors that contribute to offsite or onsite 
dose as a result of an accident. The proposed change does not affect 
setpoints that initiate protective or mitigative actions. The 
proposed change ensures that plant structures, systems, and 
components are maintained consistent with the safety analysis and 
licensing bases. Based on this evaluation, there is no significant 
increase in the consequences of a previously analyzed accident. 
Therefore, this change does not involve a significant increase in 
the probability or consequences of an accident previously evaluated.
    2. The Proposed Change Does Not Create the Possibility of a New 
or Different Kind of Accident From Any Previously Evaluated.
    The proposed change does not involve any physical alteration of 
plant systems, structures, or components. No new or different 
equipment is being installed. No installed equipment is being 
operated in a different manner. There is no change to the parameters 
within which the plant is normally operated or in the setpoints that 
initiate protective or mitigative actions. The proposed inspection 
and repair criteria will establish appropriate requirements to 
ensure that the steam generator tubes are properly maintained. As a 
result, no new failure modes are being introduced. Therefore, the 
proposed change does not create the possibility of a new or 
different kind of accident from any accident previously evaluated.
    3. The Proposed Change Does Not Involve a Significant Reduction 
in the Margin of Safety.
    There is no impact on any margin of safety resulting from the 
proposed steam generator tube inspection and repair criteria. The 
integrity of the steam generator tubes and associated primary to 
secondary leakage criteria will be maintained consistent with the 
applicable safety margins as established for HBRSEP, Unit No. 2, by 
use of the proposed steam generator alternate repair criteria. 
Therefore, this change does not involve a significant reduction in 
the margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment 
involves no significant hazards consideration. In addition, the 
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day 
comment period such that failure to act in a timely way would result, 
for example, in derating or shutdown of the facility. Should the 
Commission take action prior to the expiration of either the comment 
period or the notice period, it will publish in the Federal Register a 
notice of issuance. Should the Commission make a final No Significant 
Hazards Consideration Determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.
    Written comments may be submitted by mail to the Chief, Rulemaking, 
Directives and Editing Branch, Division of Administrative Services, 
Office of Administration, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, and should cite the publication date and 
page number of this Federal Register notice. Written comments may also 
be delivered to Room 6D59, Two White Flint North, 11545 Rockville Pike, 
Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. 
Documents may be examined, and/or copied for a fee, at the NRC's Public 
Document Room (PDR), located at One White Flint North, Public File Area 
O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
    The filing of requests for hearing and petitions for leave to 
intervene is discussed below.
    Within 60 days after the date of publication of this notice, the 
licensee may file a request for a hearing with respect to issuance of 
the amendment to the subject facility operating license and any person 
whose interest may be affected by this proceeding and who wishes to 
participate as a party in the proceeding must file a written request 
for a hearing and a petition for leave to intervene. Requests for a 
hearing and a petition for leave to intervene shall be filed in 
accordance with the Commission's ``Rules of Practice for Domestic 
Licensing Proceedings'' in 10 CFR Part 2. Interested persons should 
consult a current copy of 10 CFR 2.309, which is available at the 
Commission's PDR, located at One White Flint North, Public File Area O1 
F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly 
available records will be accessible from the Agencywide Documents 
Access and Management System's (ADAMS) Public Electronic Reading Room 
on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to 
intervene is filed by the above date, the Commission or a presiding 
officer designated by the Commission or by the Chief Administrative 
Judge of the Atomic Safety and Licensing Board Panel, will rule on the 
request and/or petition; and the Secretary or the Chief Administrative 
Judge of the Atomic Safety and Licensing Board will issue a notice of a 
hearing or an appropriate order.
    As required by 10 CFR 2.309, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the 
following general requirements: (1) The name, address and telephone 
number of the requestor or petitioner; (2) the nature of the 
requestor's/petitioner's right under the Act to be made a party to the 
proceeding; (3) the nature and extent of the requestor's/petitioner's 
property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be entered in the 
proceeding on the requestors/petitioner's interest. The petition must 
also identify the specific contentions which the petitioner/requestor 
seeks to have litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or fact to be raised or controverted. In addition, the 
petitioner/requestor shall provide a brief explanation of the bases for 
the contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on which the petitioner 
intends to rely in proving the contention at the hearing. The 
petitioner/requestor must also provide references to those specific 
sources and documents of which the petitioner is aware and on which the 
petitioner intends to rely to establish those facts or expert opinion. 
The

[[Page 4302]]

petition must include sufficient information to show that a genuine 
dispute exists with the applicant on a material issue of law or fact. 
Contentions shall be limited to matters within the scope of the 
amendment under consideration. The contention must be one which, if 
proven, would entitle the petitioner to relief. A petitioner/requestor 
who fails to satisfy these requirements with respect to at least one 
contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing.
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held. If 
the final determination is that the amendment request involves no 
significant hazards consideration, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendment. If the final determination is that the amendment 
request involves a significant hazards consideration, any hearing held 
would take place before the issuance of any amendment.
    Nontimely requests and/or petitions and contentions will not be 
entertained absent a determination by the Commission or the presiding 
officer of the Atomic Safety and Licensing Board that the petition, 
request and/or the contentions should be granted based on a balancing 
of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii).
    A request for a hearing or a petition for leave to intervene must 
be filed by: (1) First class mail addressed to the Office of the 
Secretary of the Commission, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, Attention: Rulemaking and Adjudications 
Staff; (2) courier, express mail, and expedited delivery services: 
Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and 
Adjudications Staff; (3) E-mail addressed to the Office of the 
Secretary, U.S. Nuclear Regulatory Commission, [email protected]; 
or (4) facsimile transmission addressed to the Office of the Secretary, 
U.S. Nuclear Regulatory Commission, Washington, DC, Attention: 
Rulemakings and Adjudications Staff at (301) 415-1101, verification 
number is (301) 415-1966. A copy of the request for hearing and 
petition for leave to intervene should also be sent to the Office of 
the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001, and it is requested that copies be transmitted either by 
means of facsimile transmission to 301-415-3725 or by e-mail to 
[email protected]. A copy of the request for hearing and petition 
for leave to intervene should also be sent to David T. Conley, 
Associate General Counsel II--Legal Department, Progress Energy Service 
Company, LLC, Post Office Box 1551, Raleigh, North Carolina 27602, 
attorney for the licensee.
    For further details with respect to this action, see the 
application for amendment dated January 19, 2007, which is available 
for public inspection at the Commission's PDR, located at One White 
Flint North, File Public Area O1 F21, 11555 Rockville Pike (first 
floor), Rockville, Maryland. Publicly available records will be 
accessible from the Agencywide Documents Access and Management System's 
(ADAMS) Public Electronic Reading Room on the Internet at the NRC Web 
site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have 
access to ADAMS or who encounter problems in accessing the documents 
located in ADAMS, should contact the NRC PDR Reference staff by 
telephone at 1-800-397-4209, 301-415-4737, or by e-mail to [email protected].

    Dated at Rockville, Maryland, this 23rd day of January 2007.

    For the Nuclear Regulatory Commission.
Chandu P. Patel,
Project Manager, Plant Licensing Branch II-2, Division of Operating 
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. E7-1417 Filed 1-29-07; 8:45 am]
BILLING CODE 7590-01-P