[Federal Register Volume 71, Number 250 (Friday, December 29, 2006)]
[Notices]
[Pages 78468-78470]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E6-22390]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-498]


STP Nuclear Operating Company, South Texas Project, Unit 1; 
Notice of Consideration of Issuance of Amendment to Facility Operating 
License, Proposed No Significant Hazards Consideration Determination, 
and Opportunity for a Hearing

    The U.S. Nuclear Regulatory Commission (the Commission) is

[[Page 78469]]

considering issuance of an amendment to Facility Operating License No. 
NPF-76, issued to STP Nuclear Operating Company (STPNOC/the licensee), 
for operation of the South Texas Project, Unit 1, located in Matagorda 
County, Texas.
    The proposed amendment, for a one-time exigent change, would revise 
Technical Specification (TS) 3.3.2 requirements for loss of power (LOP) 
instrumentation (Functional Unit 8). TS 3.3.2, Table 3.3-3 ACTION 20 
applies to the LOP instrumentation. Since the LOP instrumentation 
channels do not have an installed bypass capability, STPNOC proposes to 
add a note to ACTION 20 to establish a one-time provision for 
corrective maintenance on the Unit 1 Train A channel.
    Exigent Approval of the proposed TS change is justified because the 
failure that caused the inoperable channel could not reasonably have 
been anticipated. In addition, STPNOC has requested a one-time change 
because it has included the LOP instrumentation in its broad-scope 
risk-managed TS application, which will be the permanent TS resolution. 
STPNOC has promptly prepared and submitted this proposed amendment to 
the Unit 1 TS.
    Before issuance of the proposed license amendment, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended (the Act) and the Commission's regulations.
    Pursuant to 10 CFR 50.91(a)(6) for amendments to be granted under 
exigent circumstances, the NRC staff must determine that the amendment 
request involves no significant hazards consideration. Under the 
Commission's regulations in 10 CFR 50.92, this means that operation of 
the facility in accordance with the proposed amendment would not (1) 
involve a significant increase in the probability or consequences of an 
accident previously evaluated; or (2) create the possibility of a new 
or different kind of accident from any accident previously evaluated; 
or (3) involve a significant reduction in a margin of safety. As 
required by 10 CFR 50.91(a), the licensee has provided its analysis of 
the issue of no significant hazards consideration, which is presented 
below:

    (1) Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed change to add a note to ACTION 20 for a one-time 
change to allow corrective maintenance on the Unit 1 Train A loss of 
power instrumentation does not change the plant design basis, system 
configuration or operation, and does not add or affect any accident 
initiator.
    Therefore, STPNOC concludes that there is no significant 
increase in the probability or consequences of an accident 
previously evaluated.
    (2) Does the proposed change create the possibility of a new or 
different kind of accident from any accident previously evaluated?
    Response: No.
    The proposed change does not change the plant design basis, 
system configuration or operation, and does not add or affect any 
accident initiator.
    Therefore, STPNOC concludes the proposed change does not create 
the possibility of a new or different kind of accident from any 
accident previously evaluated.
    (3) Does the proposed change involve a significant reduction in 
a margin of safety? 
    Response: No.
    No actual plant equipment or accident analyses will be affected 
by the proposed change. Additionally, the proposed changes will not 
relax any criteria used to establish safety limits, will not relax 
any safety systems settings, and will not relax the bases for any 
limiting conditions of operation. Therefore, STPNOC concludes the 
proposed changes do not involve a significant reduction in the 
margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 14 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of the 14-day notice period. However, should circumstances 
change during the notice period, such that failure to act in a timely 
way would result, for example, in derating or shutdown of the facility, 
the Commission may issue the license amendment before the expiration of 
the 14-day notice period, provided that its final determination is that 
the amendment involves no significant hazards consideration. The final 
determination will consider all public and State comments received. 
Should the Commission take this action, it will publish in the Federal 
Register a notice of issuance. The Commission expe cts that the need to 
take this action will occur very infrequently.
    Written comments may be submitted by mail to the Chief, Rulemaking, 
Directives and Editing Branch, Division of Administrative Services, 
Office of Administration, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, and should cite the publication date and 
page number of this Federal Register notice. Written comments may also 
be delivered to Room 6D59, Two White Flint North, 11545 Rockville Pike, 
Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. 
Documents may be examined, and/or copied for a fee, at the NRC's Public 
Document Room, located at One White Flint North, Public File Area O1 
F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
    The filing of requests for hearing and petitions for leave to 
intervene is discussed below.
    Within 60 days after the date of publication of this notice, the 
licensee may file a request for a hearing with respect to issuance of 
the amendment to the subject facility operating license and any person 
whose interest may be affected by this proceeding and who wishes to 
participate as a party in the proceeding must file a written request 
for a hearing and a petition for leave to intervene. Requests for a 
hearing and a petition for leave to intervene shall be filed in 
accordance with the Commission's ``Rules of Practice for Domestic 
Licensing Proceedings and Issuance of Orders'' in 10 CFR Part 2. 
Interested persons should consult a current copy of 10 CFR 2.309, which 
is available at the Commission's PDR, located at One White Flint North, 
Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, 
Maryland. Publicly available records will be accessible from the 
Agencywide Documents Access and Management System's (ADAMS) Public 
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing 
or petition for leave to intervene is filed by the above date, the 
Commission or a presiding officer designated by the Commission or by 
the Chief Administrative Judge of the Atomic Safety and Licensing Board 
Panel, will rule on the request and/or petition; and the Secretary or 
the Chief Administrative Judge of the Atomic Safety and Licensing Board 
will issue a notice of a hearing or an appropriate order.
    As required by 10 CFR 2.309, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the

[[Page 78470]]

following general requirements: (1) The name, address and telephone 
number of the requestor or petitioner; (2) the nature of the 
requestor's/petitioner's right under the Act to be made a party to the 
proceeding; (3) the nature and extent of the requestor's/petitioner's 
property, financial, or other interest in the proceeding; and (4) the 
possible effect of any decision or order which may be entered in the 
proceeding on the requestor's/petitioner's interest. The petition must 
also identify the specific contentions which the petitioner/requestor 
seeks to have litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or fact to be raised or controverted. In addition, the 
petitioner/requestor shall provide a brief explanation of the bases for 
the contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on which the petitioner 
intends to rely in proving the contention at the hearing. The 
petitioner/requestor must also provide references to those specific 
sources and documents of which the petitioner/requestor is aware and on 
which the petitioner/requestor intends to rely to establish those facts 
or expert opinion. The petitioner/requestor must provide sufficient 
information to show that a genuine dispute exists with the applicant on 
a material issue of law or fact. Contentions shall be limited to 
matters within the scope of the amendment under consideration. The 
contention must be one which, if proven, would entitle the petitioner/
requestor to relief. A petitioner/requestor who fails to satisfy these 
requirements with respect to at least one contention will not be 
permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing.
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held. If 
the final determination is that the amendment request involves no 
significant hazards consideration, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendment. If the final determination is that the amendment 
request involves a significant hazards consideration, any hearing held 
would take place before the issuance of any amendment.
    Nontimely requests and/or petitions and contentions will not be 
entertained absent a determination by the Commission or the presiding 
officer of the Atomic Safety and Licensing Board that the petition, 
request and/or the contentions should be granted based on a balancing 
of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii).
    A request for a hearing or a petition for leave to intervene must 
be filed by: (1) First class mail addressed to the Office of the 
Secretary of the Commission, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, Attention: Rulemaking and Adjudications 
Staff; (2) courier, express mail, and expedited delivery services: 
Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and 
Adjudications Staff; (3) E-mail addressed to the Office of the 
Secretary, U.S. Nuclear Regulatory Commission, [email protected]; 
or (4) facsimile transmission addressed to the Office of the Secretary, 
U.S. Nuclear Regulatory Commission, Washington, DC, Attention: 
Rulemakings and Adjudications Staff at (301) 415-1101, verification 
number is (301) 415-1966. A copy of the request for hearing and 
petition for leave to intervene should also be sent to the Office of 
the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001, and it is requested that copies be transmitted either by 
means of facsimile transmission to 301-415-3725 or by e-mail to 
[email protected]. A copy of the request for hearing and petition 
for leave to intervene should also be sent to A. H. Gutterman, Esq., 
Morgan, Lewis & Bockius, 1111 Pennsylvania Avenue, NW., Washington, DC 
20004, attorney for the licensee.
    For further details with respect to this action, see the 
application for amendment dated December 20, 2006, which is available 
for public inspection at the Commission's Public Document Room (PDR), 
located at One White Flint North, Public File Area O1 F21, 11555 
Rockville Pike (first floor), Rockville, Maryland. Publicly available 
records will be accessible electronically from the Agencywide Documents 
Access and Management System's (ADAMS) Public Electronic Reading Room 
on the Internet at the NRC web site http://www.nrc.gov/reading-rm.html. 
Persons who do not have access to ADAMS or who encounter problems in 
accessing the documents located in ADAMS should contact the NRC PDR 
Reference staff by telephone at 1-800-397-4209, or 301-415-4737, or by 
e-mail to [email protected].

    Dated at Rockville, Maryland, this 22nd day of December 2006.
    For the Nuclear Regulatory Commission.
Mohan C. Thadani,
Senior Project Manager, Plant Licensing Branch IV, Division of 
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
 [FR Doc. E6-22390 Filed 12-28-06; 8:45 am]
BILLING CODE 7590-01-P