[Federal Register Volume 71, Number 235 (Thursday, December 7, 2006)]
[Notices]
[Pages 70997-70999]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E6-20753]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-482]
Notice of Acceptance for Docketing of the Application, Notice of
Opportunity for Hearing, and Notice of Intent To Prepare an
Environmental Impact Statement and Conduct the Scoping Process for
Facility Operating License No. NPF-42 for an Additional 20-Year Period;
Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating
Station, Unit 1
The U.S. Nuclear Regulatory Commission (NRC or the Commission) is
considering an application for the renewal of operating license NPF-42,
which authorizes the Wolf Creek Nuclear Operating Corporation (WCNOC),
to operate the Wolf Creek Generating Station (WCGS), Unit 1, at 3565
megawatts thermal. The renewed license would authorize the applicant to
operate the WCGS, Unit 1, for an additional 20 years beyond the period
specified in the current license. WCGS, Unit 1, is located in
Burlington, Kansas, and its current operating license expires on March
11, 2025.
On October 4, 2006, the Commission's staff received an application
from WCNOC, to renew operating license NPF-42 for WCGS, Unit 1,
pursuant to title 10, part 54, of the Code of Federal Regulations (10
CFR part 54). A notice of receipt and availability of the license
renewal application (LRA) was published in the Federal Register on
October 18, 2006 (71 FR 61512).
The Commission's staff has reviewed the LRA for its acceptability
and has determined that WCNOC has submitted sufficient information in
accordance with 10 CFR 54.19, 54.21, 54.22, 54.23, and 51.53(c), and
that the application is acceptable for docketing. The Commission will
retain the current Docket No. 50-482, for operating license NPF-42. The
docketing of the renewal application does not preclude requests for
additional information as the review proceeds, nor does it predict
whether the Commission will grant or deny the license.
Before issuance of the requested renewed license, the NRC will have
made the findings required by the Atomic Energy Act of 1954, as amended
(the Act), and the Commission's rules and regulations. In accordance
with 10 CFR 54.29, the NRC may issue a renewed license on the basis of
its review if it finds that actions have been identified and have been
or will be taken with respect to: (1) Managing the effects of aging
during the period of extended operation on the functionality of
structures and components that have been identified as requiring aging
management review; and (2) time-limited aging analyses that have been
identified as requiring review, such that there is reasonable assurance
that the activities authorized by the renewed license will continue to
be conducted in accordance with the current licensing basis (CLB), and
that any changes made to the plant's CLB will comply with the Act and
the Commission's regulations. In addition, the Commission must find
that applicable requirements of subpart A of 10 CFR part 51 have been
satisfied, and that matters raised under 10 CFR 2.335 have been
addressed.
Within 60 days after the date of publication of this Federal
Register notice, any person whose interest may be affected by this
proceeding and who desires to participate as a party in the proceeding
must file a written request for a hearing or a petition for leave to
intervene with respect to the renewal of the license. Interested
parties must file requests for a hearing or a petition for leave to
intervene in accordance with the Commission's ``Rules of Practice for
Domestic Licensing Proceedings and Issuance of Orders'' described in 10
CFR part 2. Those interested should consult a current copy of 10 CFR
2.309, which is available at the Commission's Public Document Room
(PDR), located at One White Flint North, 11555 Rockville Pike,
Rockville, Maryland 20852 and is accessible from the Agencywide
Documents Access and Management System's (ADAMS) Public Electronic
Reading Room through the Internet at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to the Internet or who
encounter problems in accessing the documents located in ADAMS should
contact the NRC's PDR reference staff by telephone at 1-800-397-4209,
or 301-415-4737, or via e-mail at [email protected]. If a request for a
hearing or a petition for leave to intervene is filed within the 60-day
period, the Commission or a presiding officer designated by the
Commission or by the Chief Administrative Judge of the Atomic Safety
and Licensing Board Panel will rule on the request and/or petition, and
the Secretary or the Chief
[[Page 70998]]
Administrative Judge of the Atomic Safety and Licensing Board will
issue a notice of a hearing or an appropriate order. If no request for
a hearing or petition for leave to intervene is filed within the 60-day
period, the NRC may, upon completion of its evaluations and upon making
the findings required under 10 CFR parts 51 and 54, renew the license
without further notice.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding, taking into consideration the limited scope of matters
that may be considered pursuant to 10 CFR parts 51 and 54. The petition
must specifically explain the reasons why intervention should be
permitted with particular reference to: (1) The nature of the
requester/petitioner's right under the Act to be made a party to the
proceeding; (2) the nature and extent of the requester/petitioner's
property, financial, or other interest in the proceeding; and (3) the
possible effect of any decision or order which may be entered in the
proceeding on the requester/petitioner's interest. The petition must
also set forth the specific contentions that the petitioner/requester
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requester/petitioner shall briefly explain the bases of each contention
and concisely state the alleged facts or the expert opinion that
supports the contention on which the requester/petitioner intends to
rely in proving the contention at the hearing. The requester/petitioner
must also provide references to those specific sources and documents of
which the requester/petitioner is aware and on which the requester/
petitioner intends to rely to establish those facts or expert opinion.
The requester/petitioner must provide sufficient information to show
that a genuine dispute exists with the applicant on a material issue of
law or fact.\1\ Contentions shall be limited to matters within the
scope of the action under consideration. The contention must be one
that, if proven, would entitle the requester/petitioner to relief. A
requester/petitioner who fails to satisfy these requirements with
respect to at least one contention will not be permitted to participate
as a party.
---------------------------------------------------------------------------
\1\ To the extent that the application contains attachments and
supporting documents that are not publicly available because they
are asserted to contain safeguards or proprietary information,
petitioners desiring access to this information should contact the
applicant or applicant's counsel to discuss the need for a
protective order.
---------------------------------------------------------------------------
The Commission requests that each contention be given a separate
numeric or alpha designation within one of the following groups: (1)
Technical (primarily related to safety concerns), (2) environmental, or
(3) miscellaneous.
As specified in 10 CFR 2.309, if two or more requesters/petitioners
seek to co-sponsor a contention or propose substantially the same
contention, the requesters/petitioners must jointly designate a
representative who shall have the authority to act for the requesters/
petitioners with respect to that contention.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing. A request for a hearing or a petition for leave to intervene
must be filed by either (1) first class mail addressed to the Office of
the Secretary of the Commission, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, Attention: Rulemaking and Adjudications
Staff; (2) courier, express mail, and expedited delivery services to
the Office of the Secretary, Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking
and Adjudications Staff; (3) e-mail addressed to the Office of the
Secretary, U.S. Nuclear Regulatory Commission, [email protected];
or (4) facsimile transmission addressed to the Office of the Secretary,
U.S. Nuclear Regulatory Commission, Washington, DC, Attention:
Rulemaking and Adjudications Staff at 301-415-1101 (verification number
is 301-415-1966).\2\ Requesters/petitioners must send a copy of the
request for hearing and petition for leave to intervene to the Office
of the General Counsel, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001; copies should be transmitted either by facsimile to 301-
415-3725 or via email to [email protected]. Requesters/petitioners
must also send a copy of the request for hearing and petition for leave
to intervene to the attorney for the licensee, Mr. Warren B. Wood, Wolf
Creek Nuclear Operating Corporation, P.O. Box 411, Burlington, Kansas
66839.
---------------------------------------------------------------------------
\2\ If the request/petition is filed by e-mail or facsimile, an
original and two copies of the document must be mailed within 2
(two) business days thereafter to the Secretary, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001; Attention:
Rulemaking and Adjudications Staff.
---------------------------------------------------------------------------
Untimely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission, the presiding
officer, or the Atomic Safety and Licensing Board that the petition,
request and/or contentions should be granted based on a balancing of
the factors specified in 10 CFR 2.309(a)(1)(i)-(viii).
In addition, this notice informs the public that the NRC will be
preparing an environmental impact statement (EIS) related to the review
of the LRA and provides the public an opportunity to participate in the
environmental scoping process, as defined in 10 CFR 51.29. In
accordance with 10 CFR 51.95(c), the NRC will prepare an EIS that will
be used as a supplement to the Commission's NUREG-1437, ``Generic
Environmental Impact Statement for License Renewal of Nuclear Plants''
(GEIS), dated May 1996. Pursuant to 10 CFR 51.26, and as part of the
environmental scoping process, the NRC staff intends to hold a public
scoping meeting. In addition, as outlined in 36 CFR 800.8,
``Coordination with the National Environmental Policy Act,'' the NRC
plans to coordinate compliance with Section 106 of the National
Historic Preservation Act in meeting the requirements of the National
Environmental Policy Act of 1969 (NEPA).
In accordance with 10 CFR 51.53(c) and 10 CFR 54.23, WCNOC prepared
and submitted the environmental report (ER) as part of the LRA. The LRA
and the ER are publicly available at the NRC's PDR, located at One
White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or
from ADAMS. The ADAMS accession numbers for the LRA and the ER are
ML062770308 and ML062770305, respectively. The public may also view the
LRA and the ER on the Internet at http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html. In addition, the LRA and
the ER are available to the public near WCGS, Unit 1, at the Burlington
Library, 410 Juniatta Street, Burlington, Kansas 66839.
Alternatives to the proposed action include no action and
reasonable alternative energy sources. The NRC is required by 10 CFR
51.95(c) to prepare a supplement to the GEIS in connection with the
renewal of an operating license. This notice is being published in
accordance with 10 CFR 51.26.
The NRC staff will first conduct a scoping process for the
supplement to the GEIS and, as soon as practicable thereafter, will
prepare a draft supplement to the GEIS for public comment.
Participation in the scoping process by members of the public and
local, State, tribal, and Federal Government agencies is encouraged. As
[[Page 70999]]
described in 10 CFR 51.29, the NRC staff will use the scoping process
for the supplement to the GEIS to accomplish the following:
a. Define the proposed action which is to be the subject of the
supplement to the GEIS.
b. Determine the scope of the supplement to the GEIS and identify
the significant issues to be analyzed in depth.
c. Identify and eliminate from detailed study those issues that are
peripheral or insignificant.
d. Identify any environmental assessments and other ElSs that are
being or will be prepared that are related to, but are not part of, the
scope of the supplement to this GEIS.
e. Identify other environmental review and consultation
requirements related to the proposed action.
f. Indicate the relationship between the timing of the preparation
of the environmental analyses and the Commission's tentative planning
and decision-making schedule.
g. Identify any cooperating agencies and, as appropriate, allocate
assignments for preparation and schedules for completing the supplement
to the GEIS to the NRC and any cooperating agencies.
h. Describe how the NRC will prepare the supplement to the GEIS and
any contractor assistance to be used.
The NRC invites the following entities to participate in scoping:
a. The applicant, WCNOC.
b. Any Federal agency that has jurisdiction by law or special
expertise with respect to any environmental impact involved, or that is
authorized to develop and enforce relevant environmental standards.
c. Affected State and local government agencies, including those
authorized to develop and enforce relevant environmental standards.
d. Any affected Indian tribe.
e. Any person who requests or has requested an opportunity to
participate in the scoping process.
f. Any person who has petitioned or intends to petition for leave
to intervene.
In accordance with 10 CFR 51.26, the scoping process for an EIS may
include a public scoping meeting to help identify significant issues
related to a proposed activity and to determine the scope of issues to
be addressed in an EIS. The NRC will hold public meetings for the WCGS,
Unit 1, license renewal supplement to the GEIS, at the Burlington
Library, 410 Juniatta Street, Burlington, Kansas 66839 on Tuesday,
December 19, 2006. There will be two identical meetings to accommodate
interested parties. The first meeting will convene at 1:30 p.m. and
will continue until 4:30 p.m., as necessary. The second meeting will
convene at 7:00 p.m. and will continue until 10 p.m., as necessary.
Both meetings will be transcribed and will include: (1) An overview by
the NRC staff of the NRC's license renewal review process; (2) an
overview by the NRC staff of the NEPA environmental review process, the
proposed scope of the supplement to the GEIS, and the proposed review
schedule; and (3) the opportunity for interested government agencies,
organizations, and individuals to submit comments or suggestions on the
environmental issues or the proposed scope of the supplement to the
GEIS. Additionally, the NRC staff will host informal discussions 1 hour
before the start of each session at the same location. The staff will
not accept formal comments on the proposed scope of the supplement to
the GEIS during these informal discussions. For comments to be
considered, persons must provide them either at the transcribed public
meetings or in writing, as discussed below.
For more information about the proposed action, the scoping
process, and the EIS, interested persons should contact the NRC
Environmental Project Manager, Mr. Christian Jacobs, at Mail Stop O-
11F1, U.S. Nuclear Regulatory Commission, 11555 Rockville Pike,
Rockville, Maryland 20852; by telephone at 1-800-368-5642, extension
3874; or via e-mail at [email protected]. Persons may register to attend or
present oral comments at the meetings on the scope of the NEPA review
by contacting Mr. Jacobs. Members of the public may also register to
speak at the meeting within 15 minutes of the start of each meeting.
Individual oral comments may be limited by the time available,
depending on the number of persons who register. Members of the public
who have not registered may also have an opportunity to speak, if time
permits. The NRC will consider public comments in the scoping process
for the supplement to the GEIS. If members of the public need special
equipment or accommodations to attend or present information at the
public meeting, they should contact Mr. Jacobs no later than December
5, 2006, so that the NRC staff can determine if it can accommodate the
request.
Members of the public may send written comments on the
environmental scope of the WCGS, Unit 1, license renewal review to:
Chief, Rules and Directives Branch, Division of Administrative
Services, Office of Administration, Mail Stop T-6D59, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, and should cite the
publication date and page number of this Federal Register notice. The
public may also deliver comments to the U.S. Nuclear Regulatory
Commission, Mail Stop T-6D59, Two White Flint North, 11545 Rockville
Pike, Rockville, Maryland 20852, from 7:30 a.m. to 4:15 p.m. during
Federal workdays. To be considered in the scoping process, written
comments should be postmarked by January 29, 2007. Electronic comments
may be sent by e-mail to the NRC at [email protected], and should be
sent no later than January 29, 2007, to be considered in the scoping
process. Comments will be available electronically and accessible
through ADAMS.
Participation in the scoping process for the supplement to the GEIS
does not entitle participants to become parties to the proceeding to
which the supplement to the GEIS relates. Matters related to
participation in any hearing are outside the scope of matters to be
discussed at this public meeting.
At the conclusion of the scoping process, the NRC will prepare a
concise summary of the determination and conclusions reached, including
the significant issues identified, and will send a copy of the summary
to each participant in the scoping process. The public may also view
the summary in ADAMS. The staff will then prepare and issue for comment
the draft supplement to the GEIS, which will be the subject of separate
notices and separate public meetings. Copies will be available for
public viewing at the above-mentioned addresses, and one copy per
request will be provided free of charge, to the extent of supply. After
receipt and consideration of the comments, the NRC will prepare a final
supplement to the GEIS, which will also be available for public
viewing.
Information about the supplement to the GEIS, and the scoping
process may be obtained from Mr. Jacobs at the telephone number or e-
mail address given previously.
Dated at Rockville, Maryland, this 30th day of November 2006.
For the Nuclear Regulatory Commission.
Pao-Tsin Kuo,
Acting Director, Division of License Renewal, Office of Nuclear Reactor
Regulation.
[FR Doc. E6-20753 Filed 12-6-06; 8:45 am]
BILLING CODE 7590-01-P