[Federal Register Volume 71, Number 99 (Tuesday, May 23, 2006)] [Corrections] [Page 29710] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: C6-2101] ----------------------------------------------------------------------- DEPARTMENT OF THE INTERIOR Minerals Management Service 30 CFR Part 250 RIN 1010-AC96 Oil and Gas and Sulphur Operations in the Outer Continental Shelf (OCS)--Minimum Blowout Prevention (BOP) System Requirements for Well- Workover Operations Performed Using Coiled Tubing With the Production Tree in Place Correction In rule document 06-2101 beginning on page 11310 in the issue of Tuesday, March 7, 2006, make the following correction: Sec. 250.615 [Corrected] On page 11313, in Sec. 250.615(e)(1), in the table, under the third column, between the current fifth and sixth entries, insert the following entry ``Hydraulically-operated pipe rams.''. [FR Doc. C6-2101 Filed 5-22-06; 8:45 am] BILLING CODE 1505-01-D