NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-275 and 50-323]


Pacific Gas and Electric Company; Notice of Consideration of 
Issuance of Amendments to Facility Operating Licenses, Proposed No 
Significant Hazards Consideration Determination, and Opportunity for a 
Hearing

    The U.S. Nuclear Regulatory Commission (the Commission) is 
considering issuance of amendments to the Facility Operating Licenses 
Nos. DPR-80 and DPR-82, issued to Pacific Gas and Electric Company 
(PG&E/the licensee) for operation of the Diablo Canyon Power Plant, 
Units 1 and 2 (DCPP) located in San Luis Obispo County, California.
    The proposed amendments would delete Section 2F, ``Antitrust'' and 
Appendix C, ``Antitrust Conditions,'' from the facility operating 
licenses. According to the application, the antitrust license 
conditions impose what are known as the ``Stanislaus Commitments,'' 
which were derived from the licensing process for the proposed, but 
never completed, Stanislaus Nuclear Plant. The licensee indicates that, 
as reflected in a 2003 Commission decision (which subsequently was 
vacated), it appears to PG&E that there is no legal authority in the 
Atomic Energy Act of 1954, as amended (AEA or Act), or in the Nuclear 
Regulatory Commission's (NRC's) regulations, for the NRC to continue to 
impose these conditions absent PG&E's consent. Moreover, in light of 
changes in the electric industry, NRC imposition of these conditions 
and the prospect of NRC enforcement of these conditions are no longer 
necessary to serve their original intended purpose.
    Before issuance of the proposed license amendments, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended

[[Page 19552]]

(the Act), and the Commission's regulations.
    The Commission has made a proposed determination that the amendment 
request involves no significant hazards consideration. Under the 
Commission's regulations in Title 10 of the Code of Federal Regulations 
(10 CFR), Sec.  50.92, this means that operation of the facility in 
accordance with the proposed amendments would not (1) involve a 
significant increase in the probability or consequences of an accident 
previously evaluated; or (2) create the possibility of a new or 
different kind of accident from any accident previously evaluated; or 
(3) involve a significant reduction in a margin of safety. As required 
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue 
of no significant hazards consideration, which is presented below:

    1. Does the proposed change involve a significant increase in 
the probability or consequences of an accident previously evaluated?
    Response: No.
    The proposed amendments are administrative changes that do not 
involve a significant increase in the probability or consequences of 
an accident previously evaluated because the amendments do not 
involve any change in the design, configuration, or operation of the 
plant. All limiting conditions for operation, limiting safety system 
settings and safety limits specified in the technical specifications 
(TS) remain unchanged.
    Therefore, the proposed change does not involve a significant 
increase in the probability or consequences of an accident 
previously evaluated.
    2. Does the proposed change create the possibility of a new or 
different accident from any accident previously evaluated?
    Response: No.
    The proposed amendments do not create the possibility of a new 
or different kind of accident from any accident previously evaluated 
because:
     The amendments do not involve any change in the design, 
configuration, or operation of the plant. The current plant design 
and design bases will remain the same. The current plant safety 
analyses remain complete and accurate in addressing the design basis 
events and in analyzing plant response and consequences.
     The limiting conditions for operations, limiting safety 
system settings and safety limits specified in TS are not affected 
by the change.
     The amendments do not introduce a new mode of plant 
operation or new accident precursors, do not involve any physical 
alterations to plant configurations, or make changes to system set 
points that could initiate a new or different kind of accident.
    Therefore, the proposed change does not create the possibility 
of a new or different accident from any accident previously 
evaluated.
    3. Does the proposed change involve a significant reduction in a 
margin of safety?
    Response: No.
    The proposed amendments do not involve a significant reduction 
in a margin of safety because:
     The amendments do not involve any change in the design, 
configuration, or operation of the plant. The change does not affect 
either the way in which the plant structures, systems, and 
components perform their safety function or their design and 
licensing bases.
     The amendments do not affect plant safety margins that 
are established through limiting conditions for operation, limiting 
safety system settings and safety limits specified in TS.
    Therefore, the proposed change does not involve a significant 
reduction in a margin of safety.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendments until the 
expiration of 60 days after the date of publication of this notice. The 
Commission may issue the license amendments before expiration of the 
60-day period provided that its final determination is that the 
amendments involve no significant hazards consideration. In addition, 
the Commission may issue the amendments prior to the expiration of the 
30-day comment period should circumstances change during the 30-day 
comment period such that failure to act in a timely way would result, 
for example in derating or shutdown of the facility. Should the 
Commission take action prior to the expiration of either the comment 
period or the notice period, it will publish in the Federal Register a 
notice of issuance. Should the Commission make a final No Significant 
Hazards Consideration Determination, any hearing will take place after 
issuance. The Commission expects that the need to take this action will 
occur very infrequently.
    Written comments may be submitted by mail to the Chief, Rules and 
Directives Branch, Division of Administrative Services, Office of 
Administration, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001, and should cite the publication date and page number of 
this Federal Register notice. Written comments may also be delivered to 
Room 6D59, Two White Flint North, 11545 Rockville Pike, Rockville, 
Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Documents may 
be examined, and/or copied for a fee, at the NRC's Public Document Room 
(PDR), located at One White Flint North, Public File Area O1 F21, 11555 
Rockville Pike (first floor), Rockville, Maryland.
    The filing of requests for hearing and petitions for leave to 
intervene is discussed below. Within 60 days after the date of 
publication of this notice, the licensee may file a request for a 
hearing with respect to issuance of the amendments to the subject 
facility operating licenses and any person whose interest may be 
affected by this proceeding and who wishes to participate as a party in 
the proceeding must file a written request for a hearing or a petition 
for leave to intervene. Requests for a hearing and petitions for leave 
to intervene shall be filed in accordance with the Commission's ``Rules 
of Practice for Domestic Licensing Proceedings'' in 10 CFR part 2. 
Interested persons should consult a current copy of 10 CFR 2.309, which 
is available at the Commission's PDR, located at One White Flint North, 
Public File Area O1F21, 11555 Rockville Pike (first floor), Rockville, 
Maryland. Publicly available records will be accessible from the 
Agencywide Documents Access and Management System's (ADAMS) Public 
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing 
or petition for leave to intervene is filed by the above date, the 
Commission or a presiding officer designated by the Commission or by 
the Chief Administrative Judge of the Atomic Safety and Licensing Board 
Panel, will rule on the request and/or petition; and the Secretary or 
the Chief Administrative Judge of the Atomic Safety and Licensing Board 
will issue a notice of a hearing or an appropriate order.
    As required by 10 CFR 2.309, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the 
following general requirements: (1) The name, address and telephone 
number of the requestor or petitioner; (2) the nature of the 
requestor's/petitioner's

[[Page 19553]]

right under the Act to be made a party to the proceeding; (3) the 
nature and extent of the requestor's/petitioner's property, financial, 
or other interest in the proceeding; and (4) the possible effect of any 
decision or order which may be entered in the proceeding on the 
requestor's/petitioner's interest. The petition must also identify the 
specific contentions which the petitioner/requestor seeks to have 
litigated at the proceeding.
    Each contention must consist of a specific statement of the issue 
of law or fact to be raised or controverted. In addition, the 
petitioner/requestor shall provide a brief explanation of the bases for 
the contention and a concise statement of the alleged facts or expert 
opinion which support the contention and on which the petitioner 
intends to rely in proving the contention at the hearing. The 
petitioner/requestor must also provide references to those specific 
sources and documents of which the petitioner is aware and on which the 
petitioner intends to rely to establish those facts or expert opinion. 
The petition must include sufficient information to show that a genuine 
dispute exists with the applicant on a material issue of law or fact. 
Contentions shall be limited to matters within the scope of the 
amendments under consideration. The contention must be one which, if 
proven, would entitle the petitioner to relief. A petitioner/requestor 
who fails to satisfy these requirements with respect to at least one 
contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing.
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held. If 
the final determination is that the amendment request involves no 
significant hazards consideration, the Commission may issue the 
amendments and make them immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendments. If the final determination is that the amendment 
request involves a significant hazards consideration, any hearing held 
would take place before the issuance of any amendments.
    Nontimely requests and/or petitions and contentions will not be 
entertained absent a determination by the Commission or the presiding 
officer of the Atomic Safety and Licensing Board that the petition, 
request and/or the contentions should be granted based on a balancing 
of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii).
    A request for a hearing or a petition for leave to intervene must 
be filed by: (1) First class mail addressed to the Office of the 
Secretary of the Commission, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, Attention: Rulemaking and Adjudications 
Staff; (2) courier, express mail, and expedited delivery services: 
Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and 
Adjudications Staff; (3) E-mail addressed to the Office of the 
Secretary, U.S. Nuclear Regulatory Commission, [email protected]; 
or (4) facsimile transmission addressed to the Office of the Secretary, 
U.S. Nuclear Regulatory Commission, Washington, DC, Attention: 
Rulemakings and Adjudications Staff at (301) 415-1101, verification 
number is (301) 415-1966. A copy of the request for hearing and 
petition for leave to intervene should also be sent to the Office of 
the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001, and it is requested that copies be transmitted either by 
means of facsimile transmission to 301-415-3725 or by e-mail to 
[email protected]. A copy of the request for hearing or petition 
for leave to intervene should also be sent to Richard F. Locke, Esq., 
Pacific Gas and Electric Company, P.O. Box 7442, San Francisco, 
California 94120, the attorney for the licensee.
    For further details with respect to this action, see the 
application for amendments dated January 19, 2006, which is available 
for public inspection at the Commission's PDR, located at One White 
Flint North, File Public Area O1 F21, 11555 Rockville Pike (first 
floor), Rockville, Maryland. Publicly available records will be 
accessible from the Agencywide Documents Access and Management System's 
(ADAMS) Public Electronic Reading Room on the Internet at the NRC Web 
site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have 
access to ADAMS or who encounter problems in accessing the documents 
located in ADAMS, should contact the NRC PDR Reference staff by 
telephone at 1-800-397-4209, 301-415-4737, or by e-mail to [email protected].

    Dated at Rockville, Maryland, this 24th day of February 2006.

    For the Nuclear Regulatory Commission.
Alan B. Wang,
Project Manager, Plant Licensing Branch IV, Division of Licensing 
Project Management, Office of Nuclear Reactor Regulation.