NUCLEAR REGULATORY COMMISSION

[Docket No. 50-139; EA-05-230]


In the Matter of the University of Washington; (The University of 
Washington Research Reactor); Order Modifying Requirements for 
Dismantling of Facility and Disposition of Component Parts

I

    The University of Washington (UW or the licensee) is the holder of 
Facility License No. R-73 issued by the Nuclear Regulatory Commission 
(NRC or Commission) pursuant to 10 CFR part 50. The license authorizes 
possession but not operation of the UW Research Reactor (the facility) 
in accordance with conditions specified therein. The facility is 
located on the licensee's campus in Seattle, Washington.

II

    By application dated August 2, 1994, the licensee requested 
authorization to dismantle the UW Research Reactor and to dispose of 
the component parts, in accordance with the decommissioning plan (DP) 
submitted as part of the application. The NRC reviewed the application 
with respect to the provisions of the Commission's rules and 
regulations and found that the dismantling and disposal of component 
parts as stated in the licensee's DP are consistent with the 
regulations in 10 CFR Chapter 1 and are not inimical to the common 
defense and security or to the health and safety of the public. On May 
1, 1995, the Commission issued an ``Order Authorizing Dismantling of 
Facility and Disposition of Component Parts'' (the 1995 order) to the 
licensee to dismantle the UW Research Reactor facility covered by 
Facility License No. R-73, as amended, and dispose of the component 
parts in accordance with its DP and the Commission's rules and 
regulations.
    By letter dated October 27, 2004, as supplemented on March 18 and 
September 28, 2005, the licensee requested that the NRC amend the 1995 
order to allow the licensee to make certain changes to the DP without 
prior NRC approval.

III

    The licensee requested that the provisions of 10 CFR 50.59 be made 
applicable to the DP for the UW Research Reactor to allow the licensee 
to make certain changes to the DP without prior Commission approval. 
The licensee made this request to allow flexibility during 
decommissioning in

[[Page 6293]]

making changes which are of minimal significance to safety. At the time 
the UW DP was approved, the DP was a stand-alone document approved by 
the order. The DP was not part of the safety analysis report and there 
was no process in the DP or the 1995 order to allow changes to be made 
to the DP without prior Commission approval. The UW was ordered to 
dismantle the facility and dispose of the component parts in accordance 
with the DP and the Commission's rules and regulations. The regulations 
in 10 CFR 50.59 did not apply to the UW DP because 10 CFR 50.59 applies 
to changes to the facility safety analysis report. In addition, 10 CFR 
50.59 does not apply to the UW reactor, because it no longer is 
authorized to operate. In a request for additional information, the 
staff asked the licensee to propose wording for making changes to the 
UW DP. The staff also asked the licensee to identify the sections of 
the DP that would not be subject to the proposed change process and 
would require prior Commission approval to be made.
    The NRC staff has reviewed the proposed change process by the 
licensee and concludes that it will allow the licensee to make changes 
to the DP without prior Commission approval consistent with the intent 
of the 10 CFR 50.59 process. Therefore, the licensee's proposed change 
process is acceptable to the staff. The staff has also reviewed the 
sections of the DP that the licensee proposes not to change without 
prior Commission approval. These sections concern the DECON 
decommissioning option chosen by the licensee, the criteria proposed by 
the licensee and approved by the Commission for unrestricted release of 
the facility and the site, the Technical and Safety Committee, which is 
a requirement of the technical specifications, and the radiation 
exposure limits, which are a requirement of the regulations in 10 CFR 
part 20. Therefore the licensee's proposed list of DP sections not 
subject to the change process is acceptable to the staff.

IV

    Accordingly, pursuant to sections 104c, 161b, 161i, 161o, 182, and 
186 of the Atomic Energy Act of 1954, as amended, and the Commission's 
regulations in 10 CFR 2.202 and 10 CFR part 50, It is hereby ordered 
that:
    The University of Washington Nuclear Reactor Decommissioning Plan 
dated July 1994 be modified to add the following:
10.0 Decommissioning Plan Change Process
    (a) Definitions for the purposes of this section:
    (1) Change means a modification or addition to, or removal from, 
the facility or procedures that affects a design function, method of 
performing or controlling the function, or an evaluation that 
demonstrates that intended functions will be accomplished.
    (2) Departure from a method of evaluation described in the 
Decommissioning Plan (as updated) used in establishing the design bases 
or in the safety analyses means:
    (i) Changing any of the elements of the method described in the 
Decommissioning Plan (as updated) unless the results of the analysis 
are conservative or essentially the same; or
    (ii) Changing from a method described in the Decommissioning Plan 
to another method unless that method has been approved by NRC for the 
intended application.
    (3) Facility as described in the Decommissioning Plan (as updated) 
means:
    (i) The structures, systems, and components (SSC) that are 
described in the Decommissioning Plan (as updated),
    (ii) The design and performance requirements for such SSCs 
described in the Decommissioning Plan (as updated), and
    (iii) The evaluations or methods of evaluation included in the 
Decommissioning Plan (as updated) for such SSCs which demonstrate that 
their intended function(s) will be accomplished.
    (4) Decommissioning Plan (as updated) means the Decommissioning 
Plan submitted and approved by the Commission, as amended and 
supplemented, and as updated per the requirements of Sec. 50.71, as 
applicable.
    (5) Procedures as described in the Decommissioning Plan (as 
updated) means those procedures that contain information described in 
the Decommissioning Plan (as updated) such as how structures, systems, 
and components are operated and controlled (including assumed operator 
actions and response times).
    (6) Tests or experiments not described in the Decommissioning Plan 
(as updated) means any activity where any structure, system, or 
component is utilized or controlled in a manner which is either:
    (i) Outside the reference bounds of the design bases as described 
in the Decommissioning Plan (as updated) or
    (ii) Inconsistent with the analyses or descriptions in the 
Decommissioning Plan (as updated).
    (b)(1) The University may make changes in the facility as described 
in the Decommissioning Plan (as updated), make changes in the 
procedures as described in the Decommissioning Plan (as updated), and 
conduct tests or experiments not described in the Decommissioning Plan 
(as updated) without obtaining Commission approval only if:
    (i) A change to the technical specifications incorporated in the 
license is not required, and
    (ii) The change, test, or experiment does not meet any of the 
criteria in paragraph (b)(2) of this section.
    (2) The University shall obtain Commission approval prior to 
implementing a proposed change, test, or experiment if the change, 
test, or experiment would:
    (i) Result in more than a minimal increase in the frequency of 
occurrence of an accident previously evaluated in the Decommissioning 
Plan (as updated);
    (ii) Result in more than a minimal increase in the likelihood of 
occurrence of a malfunction of a structure, system, or component (SSC) 
important to safety previously evaluated in the Decommissioning Plan 
(as updated);
    (iii) Result in more than a minimal increase in the consequences of 
an accident previously evaluated in the Decommissioning Plan (as 
updated);
    (iv) Result in more than a minimal increase in the consequences of 
a malfunction of an SSC important to safety previously evaluated in the 
Decommissioning Plan (as updated);
    (v) Create a possibility for an accident of a different type than 
any previously evaluated in the Decommissioning Plan (as updated);
    (vi) Result in a departure from a method of evaluation described in 
the Decommissioning Plan (as updated) used in establishing the design 
bases or in the safety analyses.
    (3) In implementing this paragraph, the Decommissioning Plan (as 
updated) is considered to include Decommissioning Plan changes pursuant 
to this condition and changes ordered by the Commission.
    (4) The provisions in this section do not apply to changes to the 
facility or procedures when the applicable regulations establish more 
specific criteria for accomplishing such changes.
    (c)(1) The licensee shall maintain records of changes in the 
facility, of changes in procedures, and of tests and experiments made 
pursuant to paragraph (b) of this section. These records must include a 
written

[[Page 6294]]

evaluation which provides the bases for the determination that the 
change, test, or experiment does not require Commission approval 
pursuant to paragraph (b)(2) of this section.
    (2) The licensee shall submit, as specified in 10 CFR 50.4, a 
report containing a brief description of any changes, tests, and 
experiments, including a summary of the evaluation of each. A report 
must be submitted at intervals not to exceed 24 months.
    (3) The records of changes in the facility must be maintained until 
the termination of a license issued pursuant to 10 CFR Part 50. Records 
of changes in procedures and records of tests and experiments must be 
maintained for a period of 5 years.
    (d) The following sections of the Decommissioning Plan (as amended) 
are not subject to the Decommissioning Plan change process: 1.3.1, 2.1, 
1.3.7.1, 1.3.7.2, 2.6, 2.3.2, and 3.2.2.

V

    Any person adversely affected by this Order may request a hearing 
on this Order within 20 days of the date of this Order. Where good 
cause is shown, consideration will be given to extending the time to 
request a hearing. A request for an extension must be made in writing 
to the Director, Office of Nuclear Reactor Regulation, U.S. Nuclear 
Regulatory Commission, Washington, DC 20555, and must include a 
statement of good cause for the extension.
    A request for a hearing or a petition for leave to intervene must 
be filed (1) by first class mail addressed to the Office of the 
Secretary of the Commission, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, Attention: Rulemaking and Adjudications 
Staff; (2) by courier, express mail, and expedited delivery services to 
the Office of the Secretary, Sixteenth Floor, One White Flint North, 
11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking 
and Adjudications Staff; (3) by e-mail addressed to the Office of the 
Secretary, U.S. Nuclear Regulatory Commission, [email protected]; 
or (4) by facsimile transmission addressed to the Office of the 
Secretary, U.S. Nuclear Regulatory Commission, Washington, DC, 
Attention: Rulemakings and Adjudications Staff at 301-415-1101 (the 
verification number is 301-415-1966). A copy of the request for hearing 
and petition for leave to intervene must also be sent to the Office of 
the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 
20555-0001, and NRC requests that copies be transmitted either by 
facsimile transmission to 301-415-3725 or by e-mail to 
[email protected]. A copy of the request for hearing and petition 
for leave to intervene should also be sent to the licensee. The 
licensee's contact for this is Stanley J. Addison, UW Radiation Safety 
Officer, University of Washington, Environmental Health and Safety, 201 
Hall Health Center, Box 354400, Seattle, Washington 98195-4400.
    If a person other than the licensee requests a hearing, he or she 
shall set forth with particularity the manner in which his or her 
interest is adversely affected by this Order and shall address the 
criteria set forth in 10 CFR 2.309.
    If a hearing is requested by the licensee or a person whose 
interest is adversely affected, the Commission will issue an order 
designating the time and place of any hearing. If a hearing is held, 
the issue to be considered at such hearing shall be whether this Order 
should be sustained.
    In the absence of any request for a hearing or written approval of 
an extension of time in which to request a hearing, the provisions 
specified in section IV above shall be effective and final 20 days from 
the date of this Order without further order or proceedings. If an 
extension of time for requesting a hearing has been approved, the 
provisions specified in section IV shall be final when the extension 
expires if a hearing request has not been received.
    For further information see the application from the licensee dated 
October 27, 2004 (ML043090558), as supplemented on March 18 
(ML050900307) and September 28, 2005 (ML052770539), and the staff's 
safety evaluation dated January 31, 2006 (ML052910487), available for 
public inspection at the Commission's Public Document Room (PDR), 
located at One White Flint North, Public File Area O1 F21, 11555 
Rockville Pike (first floor), Rockville, Maryland. Publicly available 
records will be accessible electronically from the Agencywide Documents 
Access and Management System (ADAMS) Public Electronic Reading Room on 
the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html (use the ADAMS ML numbers given above). Persons who do not 
have access to ADAMS or who have problems in accessing the documents in 
ADAMS should contact the NRC PDR reference staff by telephone at 1-800-
397-4209 or 301-415-4737 or by e-mail to [email protected].

    For the Nuclear Regulatory Commission.

    Dated this 31st day of January 2006.
Christopher I. Grimes,
Director, Division of Policy and Rulemaking, Office of Nuclear Reactor 
Regulation.
[FR Doc. E6-1625 Filed 2-6-06; 8:45 am]
BILLING CODE 7590-01-P