Dominion Nuclear Connecticut, Inc. (Dominion), Millstone Power
Station, Units 2 And 3; Notice of Availability of the Final Supplement
22 to the Generic Environmental Impact Statement for License Renewal of
Nuclear Plants, Regarding Millstone Power Station, Units 2 And 3
Notice is hereby given that the U.S. Nuclear Regulatory Commission
(Commission) has published a final plant-specific supplement to the
Generic Environmental Impact Statement for License Renewal of Nuclear
Plants (GEIS), NUREG-1437, regarding the renewal of operating licenses
DPR-65 and NPF-49 for an additional 20 years of operation at Millstone
Power Station, Units 2 and 3 (Millstone), respectively. Millstone is
located in Waterford, Connecticut, on Millstone Point between the
Niantic and Thames Rivers, approximately 40 miles to the southeast of
Hartford, Connecticut. Possible alternatives to the proposed action
(license renewal) include no action and reasonable alternative energy
sources. Section 9.3 of the final Supplement 22 states:
Based on: (1) The analysis and findings in the GEIS (NRC 1996;
1999), (2) the ER [environmental report] submitted by Dominion
(Dominion 2004b), (3) consultation with Federal, State, and local
agencies, (4) the staff's own independent review, and (5) the
staff's consideration of public comments, the recommendation of the
staff is that the Commission determine that the adverse
environmental impacts of license renewal for Millstone, are not so
great that preserving the option of license renewal for energy
planning decision makers would be unreasonable.
The final Supplement 22 to the GEIS is publicly available at the
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS
is accessible at http://www.nrc.gov/reading-rm/adams.html; a link is
provided to access documents through the Web-based component of ADAMS.
The accession number for the final Supplement 22 to the GEIS is
ML051960293. Persons who do not have access to ADAMS, or who encounter
problems in accessing the documents located in ADAMS, should contact
the NRC's PDR Reference staff at 1-800-397-4209, or 301-415-4737, or by
e-mail at [email protected]. In addition, the Waterford Public Library, 49
Rope Ferry Road, Waterford, Connecticut, and the Three Rivers Community
College, Thames River Campus Library, 574 New London Turnpike, Norwich,
Connecticut, have agreed to make the final Supplement 22 to the GEIS
available for public inspection.
For Further Information, Contact: Mr. Richard L. Emch, Jr., License
Renewal and Environmental Impacts Program, Division of Regulatory
Improvement Programs, U.S. Nuclear Regulatory Commission, Washington,
DC 20555. Mr. Emch may be contacted at 1-800-368-5642, extension 1590
or via e-mail at [email protected].
Dated at Rockville, Maryland, this 18th day of July, 2005.
For the Nuclear Regulatory Commission.
Pao-Tsin Kuo,
Program Director, License Renewal and Environmental Impacts Program,
Division of Regulatory Improvement Programs, Office of Nuclear Reactor
Regulation.
[FR Doc. E5-3919 Filed 7-21-05; 8:45 am]
BILLING CODE 7590-01-P