[Federal Register Volume 70, Number 126 (Friday, July 1, 2005)]
[Notices]
[Pages 38131-38132]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 05-13044]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6664-8]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 06/20/2005
Through 06/24/2005 Pursuant to 40 CFR 1506.9.
EIS No. 20050256, Draft EIS, AFS, MT, Beaverhear-Deerlodge National
Forest Draft Revised Land and Resource Management Plan, Implementation,
Beaverhead, Butte-Silver Bow, Deerlodge, Granite, Jefferson, Madison
Counties, MT, Comment Period Ends: 08/15/2005, Contact: Marty Gardner
406-683-3860.
EIS No. 20050257, Final EIS, AFS, MT, Northeast Yaak Project, Proposed
Harvest to Reduce Fuels in Old Growth, Implementation, Kootenai
National Forest, Three Rivers Ranger District, Lincoln County, MT, Wait
Period Ends: 08/01/2005, Contact: Kathy Mohar 406-295-4693.
EIS No. 20050258, Final EIS, AFS, OR, B&B Fire Recovery Project,
Proposed Harvest of Fire-Killed Trees, Reduction of Fuels, Planting of
Tree, Deschutes National Forest, Sisters Ranger District, Jefferson and
Deschutes Counties, OR, Wait Period Ends: 08/01/2005, Contact: Brent
Ralston 541-383-5784.
EIS No. 20050259, Draft EIS, FHW, NY, Southtowns Connector/Buffalo
Outer Harbor Project, Improvements on the NYS Route 5 Corridor from
Buffalo Skyway Bridge to NYS Route 179, in the City of Buffalo, City of
Lackawanna and Town of Hamburg, Erie County, NY, Comment Period Ends:
08/15/2005, Contact: Amy Jackson-Grove 518-431-4131.
EIS No. 20050260, Draft EIS, AFS, AK, Scott Peak Project Area,
Harvesting Timber and Development of Road Management, Tongrass National
Forest, Petersburg Ranger District, Northeat of Kupreanof Island, AK ,
Comment Period Ends: 08/15/2005, Contact: Patty Grantham 907-772-3871.
EIS No. 20050261, Final EIS, IBR, CA, Cental Valley Project Long-Term
Water Service Contract Renewals -American River Division, Proposes to
Renew Long-Term Water Service Contracts, Sacramento, Placer and El
Dorado Counties, CA, Wait Period Ends: , 08/01/2005Contact: David
Robinson 916-989-7179.
EIS No. 20050262, Draft EIS, FHW, DC, Klingle Road Reconstruction
Project, Reconstructing for Vehicular and Recreational Uses, Between
Porter Street, NW and Cortland Place, NW, Funding, Washington, DC,
Comment Period Ends: 08/15/2005, Contact: Michael Hicks 202-219-3513.
EIS No. 20050263, Final EIS, AFS, CA, Power Fire Restoration Project,
To Reduce Long-Term Fuel Loading for the Purpose of Reducing Future
[[Page 38132]]
Severity and Resistance to Control, Amador Ranger District, Eldorado
National Forest, Amado County, CA,Wait Period Ends: 08/01/2005,
Contact: Patricia Ferrell 530-642-5146.
EIS No. 20050264, Draft EIS, NPS, ID, Minidoka Internment National
Monument (Former Minidoka Relocation Center) , General Management Plan,
Implementation, Jerome County, ID, Comment Period Ends: 09/19/2005,
Contact: Neil King 208-837-4793.
EIS No. 20050265, Final EIS, NPS, AZ, Chiricahua National Monument Fire
Management Plan (FMP), Implementation, AZ, Wait Period Ends: 08/01/
2005, Contact: Alan Whalon 520-824-3560.
EIS No. 20050266, Draft EIS, DOE, 00, Proposed Consolidation of Nuclear
Operations Related to Production of radioisotope Power Systems, Located
or Planned Sites: Oak Ridge National Laboratory (ORNL), Tennessee; Los
Alamos National Laboratory (LANL), New Mexico; and the Idaho National
Laboratory (INL), Idaho, TN, NM, ID, Comment Period Ends: 08/29/2005,
Contact: Timothy A. Frazier 301-903-9420.
EIS No. 20050267, Final EIS, NRC, NM, National Enrichment Facility
(NEF), To Construct, Operate, and Decommission a Gas Centrifuge Uranium
Enrichment Facility, License Application, NUREG-1790, near Eunice, Lea
County, NM, Wait Period Ends: 08/01/2005, Contact: Melanie Wong 301-
415-6262.
EIS No. 20050268, Draft EIS, NOA, 00, Programmatic--Codified
Regulations at 50 CFR 300 Subparts A and G Implementing Conservation
and Management Measures Adopted by the Commission for the Conservation
of Antarctic Marine Living Resources, Comment Period Ends: 08/15/2005,
Contact: Robert B. Gorrell 301-713-1193.
EIS No. 20050269, Final EIS, AFS, CA, Freds Fire Restoration Project,
To Reduce Long-Term Fuel Loading for the Purpose of Reducing Future
Fire Severity and Resistance to Control, Eldorado National Forest, El
Dorado County, CA, Wait Period Ends: 08/01/2005, Contact: Laura
Hierholzer 530-647-53892.
EIS No. 20050270, Final EIS, NRC, AL, Generic--License Renewal of
Nuclear Plants for Browns Ferry, Unit 1, 2 and 33 (TAC Nos. MC7168,
MC1769, and MC1770), Supplement 21 to NUREG-1437, Implementation,
Athens, AL, Wait Period Ends: 08/01/2005, Contact: Dr. Michael Masnik
301-415-1191.
EIS No. 20050271, Final EIS, AFS, MT, Gallatin National Forest Noxious
and Invasive Weed Control Project, To Prevent and Reduce Loss of Native
Plant, Bozeman, Carbon, Madison, Gallatin, Meagher, Park, and Sweet
Grass Counties, MT, Wait Period Ends: 08/01/2005, Contact: Susan LaMont
406-823-6976.
EIS No. 20050272, Final EIS, NRS, OR, Williamson River Delta
Restoration Project, To Restore and Maintain the Ecological Functions
of the Delta, Williamson River, Klamath County, OR, Wait Period Ends:
08/01/2005, Contact: Kevin Conroy 541-883-6924, Ext 115.
EIS No. 20050273, Final EIS, AFS, ID, Porcupine East, 9 Allotment
Grazing Analysis Project, Authorizing Livestock Grazing, Caribou-
Targhee National Forest, Dubois Ranger District, Cenntenial Mountains,
Clark County, ID, Wait Period Ends: 08/01/2005, Contact: Shane Q.
Jacobson 208-374-5422.
Dated: June 28, 2005.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 05-13044 Filed 6-30-05; 8:45 am]
BILLING CODE 6560-50-P