[Federal Register Volume 70, Number 102 (Friday, May 27, 2005)]
[Notices]
[Pages 30819-30820]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E5-2688]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-266 and 50-301]


Nuclear Management Company, LLC; Point Beach Nuclear Plant, Units 
1 and 2; Environmental Assessment and Finding of No Significant Impact

    The U.S. Nuclear Regulatory Commission (NRC) is considering 
issuance of an exemption from Title 10 of the Code of Federal 
Regulations (10 CFR) Part 50, Appendix R, Section IlI.G.1.a for 
Facility Operating License Nos. DPR-24 and DPR-27, issued to Nuclear 
Management Company, LLC (NMC), the licensee, for operation of the Point 
Beach Nuclear Plant (PBNP), Units 1 and 2, located in Manitowoc County, 
Wisconsin. Therefore, as required by 10 CFR 51.21, the NRC is issuing 
this environmental assessment and finding of no significant impact.

Environmental Assessment

Identification of the Proposed Action

    The proposed action would exempt 10 CFR Part 50, Appendix R, 
Section III.G.1.a as it applies to the PBNP, Unit 1 auxiliary and 
turbine buildings; and the PBNP, Unit 2 auxiliary and turbine 
buildings, and the control building. The exemption requested is from 
the requirement that, ``one train of systems necessary to achieve and 
maintain hot shutdown from either the control room or emergency control 
station(s) is free of fire damage,'' as it applies to the PBNP, Unit 1 
auxiliary and turbine buildings; the PBNP, Unit 2 auxiliary and turbine 
buildings, and the control building. Specifically, NMC has asked for a 
repair consisting of powering a dedicated air compressor from one of 
two pre-planned 480 volt power sources using pre-staged power cords and 
connecting the air compressor to nitrogen bottle manifolds on one or 
both reactor units using pre-staged pneumatic hose with quick connect 
fittings. The repair would be required no earlier than 8 hours into an 
event in which instrument air is disabled.
    The proposed action is in accordance with the licensee's 
application dated March 5, 2004, as supplemented by letter dated 
November 8, 2004.

The Need for the Proposed Action

    Appendix R, Section Ill.G.1.a of 10 CFR Part 50 requires that, 
``one train of systems necessary to achieve and maintain hot shutdown 
conditions from either the control room or emergency control station(s) 
is free of fire damage.'' Appendix R, Section Ill.L.1 of 10 CFR Part 50 
requires that an alternative or dedicated shutdown capability shall be 
able to, among other things, ``(c) achieve and maintain hot standby 
conditions for a pressurized water reactor (PWR)''; and ``(d) achieve 
cold shutdown conditions within 72 hours.'' NRC Inspection Report 50-
266/2003-007; 50-301/2003-007, dated February 4, 2004, documents a Non-
Cited Violation of Appendix R, Section III.L.1.c, in that NMC, ``failed 
to ensure, without the need for 'hot standby repairs,' adequate control 
air to the speed controllers for the charging pumps during a postulated 
fire requiring an alternative shutdown method.'' The installed backup 
nitrogen gas bottle bank (for the charging pump speed controllers) 
meets the requirements of the regulation, with the exception that it is 
of limited capacity. This means that the hot shutdown conditions could 
not be maintained indefinitely while relying only on the installed 
bottle bank. However, the 8 to 14 hour capacity of the bottle banks is

[[Page 30820]]

ample time to extinguish the fire, achieve stable plant conditions in 
hot shutdown, augment staff with personnel from the emergency response 
organization, and connect dedicated power cabling and hoses to the 
dedicated compressor using the furnished plugs and quick connect 
fittings (i.e., no tools required).
    Because the bottle banks, hoses, cables, and compressor are all 
located in areas that would not be affected by the fires of concern, 
none would be damaged. Thus, the proposed exemption is fully consistent 
with the intent of the applicable sections of 10 CFR Part 50, Appendix 
R, and literal compliance is not necessary to achieve the underlying 
purpose of the rules.

Environmental Impacts of the Proposed Action

    The NRC has completed its safety evaluation of the proposed action 
and concludes that pursuant to 10 CFR 50.12(a)(2)(ii), the level of 
fire safety provided is equivalent to the technical requirements of 10 
CFR Part 50 Appendix R, Section IlI.G.1.a. As such, the requested 
exemption does not pose an undue risk to the health and safety of the 
public.
    The details of the NRC staff's safety evaluation will be provided 
in the exemption that will be issued as part of the letter to the 
licensee approving the exemption to the regulation.
    The proposed action will not significantly increase the probability 
or consequences of accidents. No changes are being made in the types of 
effluents that may be released off site. There is no significant 
increase in the amount of any effluent released off site. There is no 
significant increase in occupational or public radiation exposure. 
Therefore, there are no significant radiological environmental impacts 
associated with the proposed action.
    With regard to potential non-radiological impacts, the proposed 
action does not have a potential to affect any historic sites. It does 
not affect non-radiological plant effluents and has no other 
environmental impact. Therefore, there are no significant non-
radiological environmental impacts associated with the proposed action.
    Accordingly, the NRC concludes that there are no significant 
environmental impacts associated with the proposed action.

Environmental Impacts of the Alternatives to the Proposed Action

    As an alternative to the proposed action, the NRC staff considered 
denial of the proposed action (i.e., the ``no-action'' alternative). 
Denial of the application would result in no change in current 
environmental impacts. The environmental impacts of the proposed action 
and the alternative action are similar.

Alternative Use of Resources

    The action does not involve the use of any different resources than 
those previously considered in the Final Environmental Statement for 
the Point Beach Nuclear Plant, Units 1 and 2.

Agencies and Persons Consulted

    In accordance with its stated policy, on April 4, 2005, the NRC 
staff consulted with the Wisconsin State official, Jeffery Kitsembel of 
the Public Service Commission of Wisconsin, regarding the environmental 
impact of the proposed action. The State official had no comments.

Finding of No Significant Impact

    On the basis of the environmental assessment, the NRC concludes 
that the proposed action will not have a significant effect on the 
quality of the human environment. Accordingly, the NRC has determined 
not to prepare an environmental impact statement for the proposed 
action.
    For further details with respect to the proposed action, see the 
licensee's letter dated March 5, 2004, as supplemented by letter dated 
November 8, 2004. Documents may be examined, and/or copied for a fee, 
at the NRC's Public Document Room (PDR), located at One White Flint 
North, 11555 Rockville Pike (first floor), Rockville, Maryland. 
Publicly available records will be accessible electronically from the 
Agencywide Documents Access and Management System (ADAMS) Public 
Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to 
ADAMS or who encounter problems in accessing the documents located in 
ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-
397-4209 or 301-415-4737, or send an e-mail to [email protected].

    Dated at Rockville, Maryland, this 23rd day of May, 2005.

    For the Nuclear Regulatory Commission.
Harold K. Chernoff,
Project Manager, Section 1, Project Directorate III, Division of 
Licensing Project Management, Office of Nuclear Reactor Regulation.
[FR Doc. E5-2688 Filed 5-26-05; 8:45 am]