[Federal Register Volume 70, Number 86 (Thursday, May 5, 2005)]
[Notices]
[Pages 23892-23893]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 05-8948]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-382]
Entergy Operations, Inc.; Notice of Consideration of Issuance of
Amendment to Facility Operating License, Proposed No Significant
Hazards Consideration Determination, and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Facility Operating License No.
NPF-38, issued to Entergy Operations, Inc. (Entergy or the licensee),
for operation of the Waterford Steam Electric Station, Unit 3
(Waterford 3) located in Saint Charles Parish, Louisiana.
The proposed amendment would remove the license condition on
instrument uncertainty, that was imposed on the Waterford 3 license
with the issuance of License Amendment 199 for the extended power
uprate (EPU) on April 15, 2005.
The amendment request was submitted on an exigent basis because the
need for a license amendment to remove the license condition was not
recognized by Entergy or the NRC staff until just prior to the issuance
of the EPU, and the licensee requests approval of the proposed
amendment by May 27, 2005, to support power ascension from the Spring
2005 refueling outage.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act) and the Commission's regulations.
Pursuant to 10 CFR 50.91(a)(6) for amendments to be granted under
exigent circumstances, the NRC staff must determine that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in 10 CFR 50.92, this means that operation of
the facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. As
required by 10 CFR 50.91(a), the licensee has provided its analysis of
the issue of no significant hazards consideration, which is presented
below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change is administrative in nature and does not
result in a change to any structure, system, or component (SSC). The
accident mitigation features of the plant for previously evaluated
accidents are not affected by the proposed change. The proposed
change has no impact on the safety analysis because the application
of an explicit offset to the Technical Specification parameters for
instrument uncertainty provides additional assurance that the plant
will operate within the operating envelop[e] previously analyzed.
The completion of the license condition will allow Waterford 3 to
operate at the power level of 3716 MWt [megawatts-thermal] which has
previously been evaluated and approved by the NRC staff as
documented in Amendment 199 to the Waterford 3 Operating License.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change is administrative in nature and does not
change the design function or operation of any SSC. The proposed
change introduces no new mode of operation. The proposed change does
not affect the functional capability of safety-related equipment.
The completion of the license condition will allow Waterford 3 to
operate at the power level of 3716 MWt which has previously been
evaluated and approved by the NRC staff as documented in Amendment
199 to the Waterford 3 Operating License.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change is administrative in nature and does not
result in a change to any structure, system, or component (SSC). The
accident mitigation features of the plant for previously evaluated
accidents are not affected by the proposed change. The proposed
change has no impact on the safety analysis because the application
of an explicit offset to the Technical Specification parameters for
instrument uncertainty provides additional assurance that the plant
will operate within the operating envelop[e] previously analyzed.
Existing Technical Specification operability and surveillance
requirements are not reduced by the proposed change. The completion
of the license condition will allow Waterford 3 to operate at the
power level of 3716 MWt which has previously been evaluated and
approved by the NRC staff as documented in Amendment 199 to the
Waterford 3 Operating License.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 14 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of the 14-day notice period. However, should circumstances
change during the notice period, such that failure to act in a timely
way would result, for example, in derating or shutdown of the facility,
the Commission may issue the license amendment before the expiration of
the 14-day notice period, provided that its final determination is that
the amendment involves no significant hazards consideration. The final
determination will consider all public and State comments received.
Should the Commission take this action, it will publish in the Federal
Register a notice of issuance. The Commission expects that the need to
take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rules and
Directives Branch, Division of Administrative Services, Office of
Administration, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, and should cite the publication date and page number of
this Federal Register notice. Written comments may also be delivered to
Room 6D59, Two White Flint North, 11545 Rockville Pike, Rockville,
Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. Documents may
be examined, and/or copied for a fee, at the NRC's Public Document Room
(PDR), located at One White Flint North, 11555 Rockville Pike (first
floor), Rockville, Maryland.
The filing of requests for hearing and petitions for leave to
intervene is discussed below.
Within 60 days after the date of publication of this notice, the
licensee may file a request for a hearing with respect to issuance of
the amendment to the subject facility operating license and any person
whose interest may be
[[Page 23893]]
affected by this proceeding and who wishes to participate as a party in
the proceeding must file a written request for a hearing and a petition
for leave to intervene. Requests for a hearing and a petition for leave
to intervene shall be filed in accordance with the Commission's ``Rules
of Practice for Domestic Licensing Proceedings and Issuance of Orders''
in 10 CFR part 2. Interested persons should consult a current copy of
10 CFR 2.309, which is available at the Commission's PDR, located at
One White Flint North, Public File Area 01F21, 11555 Rockville Pike
(first floor), Rockville, Maryland. Publicly available records will be
accessible from the Agencywide Documents Access and Management System's
(ADAMS) Public Electronic Reading Room on the Internet at the NRC Web
site, http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request
for a hearing or petition for leave to intervene is filed by the above
date, the Commission or a presiding officer designated by the
Commission or by the Chief Administrative Judge of the Atomic Safety
and Licensing Board Panel, will rule on the request and/or petition;
and the Secretary or the Chief Administrative Judge of the Atomic
Safety and Licensing Board will issue a notice of a hearing or an
appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner/requestor is aware and on
which the petitioner/requestor intends to rely to establish those facts
or expert opinion. The petitioner/requestor must provide sufficient
information to show that a genuine dispute exists with the applicant on
a material issue of law or fact. Contentions shall be limited to
matters within the scope of the amendment under consideration. The
contention must be one which, if proven, would entitle the petitioner/
requestor to relief. A petitioner/requestor who fails to satisfy these
requirements with respect to at least one contention will not be
permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
Nontimely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission or the presiding
officer of the Atomic Safety and Licensing Board that the petition,
request and/or the contentions should be granted based on a balancing
of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii).
A request for a hearing or a petition for leave to intervene must
be filed by: (1) First class mail addressed to the Office of the
Secretary of the Commission, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, Attention: Rulemaking and Adjudications
Staff; (2) courier, express mail, and expedited delivery services:
Office of the Secretary, Sixteenth Floor, One White Flint North, 11555
Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and
Adjudications Staff; (3) E-mail addressed to the Office of the
Secretary, U.S. Nuclear Regulatory Commission, [email protected];
or (4) facsimile transmission addressed to the Office of the Secretary,
U.S. Nuclear Regulatory Commission, Washington, DC, Attention:
Rulemakings and Adjudications Staff at (301) 415-1101, verification
number is (301) 415-1966. A copy of the request for hearing and
petition for leave to intervene should also be sent to the Office of
the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, and it is requested that copies be transmitted either by
means of facsimile transmission to 301-415-3725 or by e-mail to
[email protected]. A copy of the request for hearing and petition
for leave to intervene should also be sent to Nicolas S. Reynolds,
Esquire, Winston and Strawn, 1400 L Street, NW., Washington, DC 2005-
3502, attorney for the licensee.
For further details with respect to this action, see the
application for amendment dated April 27, 2005, which is available for
public inspection at the Commission's PDR, located at One White Flint
North, Public File Area O1 F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available records will be accessible
electronically from the ADAMS Public Electronic Reading Room on the
Internet at the NRC Web site http://www.nrc.gov/reading-rm.html.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS, should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-
mail to [email protected].
Dated at Rockville, Maryland, this 29th day of April 2005.
For the Nuclear Regulatory Commission.
Thomas W. Alexion,
Project Manager, Section 1, Project Directorate IV, Division of
Licensing Project Management, Office of Nuclear Reactor Regulation.
[FR Doc. 05-8948 Filed 5-4-05; 8:45 am]
BILLING CODE 7590-01-P