[Federal Register Volume 69, Number 60 (Monday, March 29, 2004)]
[Notices]
[Page 16245]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: E4-698]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2232-457]
Duke Power Company; Notice of Availability of Environmental
Assessment
March 23, 2004.
In accordance with the National Environmental Policy Act of 1969,
as amended, and the Federal Energy Regulatory Commission's (Commission)
regulations (18 CFR Part 380), Commission staff have prepared an
environmental assessment (EA) that analyzes the environmental impacts
of allowing Duke Power Company, licensee for the Catawba-Wateree
Hydroelectric Project, to grant an updated Water Withdrawal Easement to
the City of Mount Holly, North Carolina for project property within
Mountain Island Lake that will supercede an existing easement. The
updated easement will allow Mount Holly to install and maintain new
intake screens on existing water intake pipes at its Raw Water Intake
Pumping Station at Mountain Island Lake, and allow Mount Holly to
increase water withdrawals from the currently-permitted rate of 3.0
million gallons per day (MGD) to a maximum of 13.5 MGD. Increases in
water withdrawal would occur incrementally over time. The EA contains
staff's analysis of the potential environmental impacts of the proposal
and concludes that approval of the Proposed Action would not constitute
a major Federal action significantly affecting the quality of the human
environment.
A copy of the EA is attached to a Commission order titled ``Order
Approving Non-Project Use of Project Lands and Waters,'' which was
issued March 23, 2004, and is available for review and reproduction at
the Commission's Public Reference Room, located at 888 First Street,
NE., Room 2A, Washington, DC 20426. The EA may also be viewed on the
Commission's Web site at http://www.ferc.gov using the ``elibrary''
link. Enter the docket number (prefaced by P-) and excluding the last
three digits, in the docket number field to access the document. For
assistance, contact FERC Online Support at [email protected]
or toll-free at (866) 208-3676, or for TTY, contact (202) 502-8659.
Magalie R. Salas,
Secretary.
[FR Doc. E4-698 Filed 3-26-04; 8:45 am]
BILLING CODE 6717-01-P