[Docket No. EG03-84-000, et al.]
Conectiv Delmarva Generation, Inc., et al.; Electric Rate and
Corporate Filings
August 14, 2003.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Conectiv Delmarva Generation, Inc.
[Docket No. EG03-84-000]
Take notice that on August 5, 2003, Conectiv Delmarva Generation,
Inc. (CDG) filed an amendment to Paragraph 6 of its July 24, 2003
Application for Determination of Exempt Wholesale Generator Status in
the above-captioned proceeding.
CDG states that it has served this filing on the Maryland Public
Service Commission, the Delaware Public Service Commission, the New
Jersey Board of Public Utilities, the Virginia State Corporation
Commission, the District of Columbia Public Service Commission and the
Securities and Exchange Commission.
Comment Date: September 4, 2003.
2. Conectiv Atlantic Generation, L.L.C.
[Docket No. EG03-85-000]
Take notice that on August 5, 2003, Conectiv Atlantic Generation,
L.L.C. (CAG) filed an amendment to Paragraph 6 of its July 24, 2003
Application for Determination of Exempt Wholesale Generator Status in
the above-captioned proceeding.
CAG states that it has served this filing on the Maryland Public
Service Commission, the Delaware Public Service Commission, the New
Jersey Board of Public Utilities, the Virginia State Corporation
Commission, the District of Columbia Public Service Commission and the
Securities and Exchange Commission.
Comment Date: September 4, 2003.
3. San Marco Bioenergia S.p.A.
[Docket No. EG03-88-000]
Take notice that on August 8, 2003, San Marco Bioenergia S.p.A.
(San Marco) with its principal office at Via G. de Castro 4, 20144
Milano, Italy, filed with the Federal Energy Regulatory Commission
(Commission) an application for determination of exempt wholesale
generator status pursuant to part 365 of the Commission's regulations.
San Marco states that it is a company organized under the laws of
Italy. San Marco further states that it will be engaged, directly or
indirectly through an affiliate as defined in Section 2(a)(11)(B) of
the Public Utility Holding Company Act of 1935, exclusively in owning,
or both owning and operating an electric generating facility consisting
of a 20 MW Power Plant in Italy, selling electric energy at wholesale
and engaging in project development activities with respect thereto.
Comment Date: September 4, 2003.
4. Stonycreek WindPower LLC
[Docket No. EG03-89-000]
Take notice that on August 8, 2003, Stonycreek WindPower LLC
(Applicant) filed with the Federal Energy Regulatory Commission
(Commission) an Application for Determination of Exempt Wholesale
Generator Status pursuant to part 365 of the Commission's regulations.
Applicant states that it is developing a wind-powered eligible
facility with a capacity of 72 megawatts, which will be located in
Somerset County, Pennsylvania.
Comment Date: September 4, 2003.
5. PJM Interconnection, L.L.C.
[Docket No. EL01-122-006]
Take notice that on August 7, 2003, PJM Interconnection, L.L.C.
(PJM) tendered for filing with the Federal Energy Regulatory Commission
(Commission), minor revisions to Attachment M of the PJM Open Access
Transmission Tariff which is in compliance with the Commission's July
2, 2003 order (104 FERC [rsqbb] 61,020).
PJM states that copies of this filing have been served on all PJM
members and utility regulatory commissions in the PJM region and on all
parties listed on the official service list in the above-captioned
proceeding.
Comment Date: August 26, 2003.
1. Central Iowa Power Cooperative; Clarke Electric Cooperative, Inc.;
Consumers Energy Cooperative; East-Central Iowa Rural Electric
Cooperative; Eastern Iowa Light & Power Cooperative; Farmers Electric
Cooperative, Inc.; Guthrie County Rural Electric Cooperative
Association; Maquoketa Valley Electric Cooperative; Midland Power
Cooperative; Pella Cooperative Electric Association; Rideta Electric
Cooperative, Inc.; South Iowa Municipal Electric Cooperative;
Association; Southwest Iowa Service Cooperative; T.I.P. Rural Electric
Cooperative
[Docket No. EL03-219-000]
Take notice that on August 8, 2003, the above-named non-regulated
utilities have filed with the Federal Energy Regulatory Commission
(Commission) a joint PURPA implementation plan pursuant to Section
292.402 of the Commission's regulations, for waiver of certain
obligations imposed on these applicant utilities under Sections
292.303(a) and 292.303(b) of the Commission's regulations which
implement Section 210 of the Public Utility Regulatory Policies Act of
1978.
Comment Date: September 8, 2003.
7. Otter Tail Corporation
[Docket No. ER00-3080-001]
Take notice that on August 11, 2003, Otter Tail Corporation,
formerly known as Otter Tail Power Company (Otter Tail) filed an
updated market analysis as required by the Commission's August 11, 2000
Order in Docket ER00-3080-000 granting Otter Tail market-based rate
authority.
Comment Date: September 2, 2003.
8. Panda Gila River, L.P.
[Docket No. ER01-931-002]
Take notice that on August 6, 2003, Panda Gila River, L.P. filed
with the Federal Energy Regulatory Commission a notice of change in
status in connection with the transfer by Panda GS V, LLC and Panda GS
VI, LLC of their respective interests in TECO-PANDA Generating Company,
L.P. to TPS GP, Inc. and TPS LP, Inc.
Comment Date: August 27, 2003.
9. Occidental Power Services, Inc.
[Docket No. ER02-1947-004]
Take notice that on August 6, 2003, Occidental Power Services,
Inc., (OPSI) filed a Notice of Change in Status in regard to the Asset
Management Agreement with Elk Hills Power L.L.C.
Comment Date: August 27, 2003.
10. Sierra Pacific Power Company
[Docket Nos. ER03-37-004 and ER02-2609-004]
Take notice that on August 8, 2003, Sierra Pacific Power Company
submitting a refund report in compliance with the Commission Order
issued July 1, 2003 in Docket Nos. ER03-37-000 and ER02-2609-000.
Comment Date: August 29, 2003.
11. Idaho Power Company
[Docket No. ER03-488-004]
Take notice that on August 5, 2003, Idaho Power Company (Idaho
Power) tendered for filing Second Revised Service Agreement No. 153,
Second Revised Service Agreement No. 155, and Second Revised Service
Agreement No. 156, under FERC Electric Tariff First Revised Volume No.
5 for Network
[[Page 52392]]
Integration Transmission Service between Idaho Power and Bonneville
Power Administration. Idaho Power seeks an effective date of January 1,
2003.
Comment Date: August 26, 2003.
12. Devon Power LLC, Middletown Power LLC, Montville Power LLC Norwalk
Power LLC and NRG Power Marketing Inc.
[Docket No. ER03-563-013]
Take notice that on August 5, 2003, Devon Power LLC, Middletown
Power LLC, Montville Power LLC, Norwalk Power LLC (collectively
Applicants) and NRG Power Marketing Inc., on May 28, 2003, tendered for
filing in compliance with the Commission's Order, issued July 24, 2003
(July 24 Order) 104 FERC Sec. 61,123, Third Revised Cost of Service
Agreements (COS Agreements) among each of the Applicants, NRG Power
Marketing Inc, as agent for each Applicant, and ISO New England Inc.,
and changes to Applicants' cost-of-service to reflect rate adjustments
determined by the July 24 Order and supporting documents.
Applicants state that they have served a copy of its filing on ISO
New England, Inc. and each person designated on the official service
list in Docket No. ER03-563..
Comment Date: August 26, 2003.
13. Southern Company Services, Inc.
[Docket No. ER03-872-001]
Take notice that on August 11, 2003, Southern Company Services,
Inc., (SCS), acting on behalf of Georgia Power Company (GPC), filed
additional material relating to supplement their May 23, 2003 filing of
an Interconnection Agreement between Southern Power Company and Georgia
Power. The additional material was submitted in response to the
Commission's Letter Order issued July 10, 2003 in Docket No. ER03-872-
000.
Comment Date: September 2, 2003.
14. New York Independent System Operator, Inc.
[Docket No. ER03-873-001]
Take notice that on August 6, 2003, the New York Independent System
Operator, Inc. (NYISO) tendered for filing a compliance filing in
connection with the Commission's July 22, 2003, order in Docket No.
ER03-873-000.
The NYISO states it has served a copy of this filing to all parties
listed on the official service list. The NYISO also states it has
served a copy of this filing on all parties that have executed Service
Agreements under the NYISO's Open-Access Transmission Tariff or
Services Tariff, the New York State Public Service Commission and to
the electric utility regulatory agencies in New Jersey and
Pennsylvania.
Comment Date: August 27, 2003.
15. PPL Montana LLC
[Docket ER03-1133-001]
Take notice that on August 6, 2003, PPL Montana LLC (PPL), tendered
for filing a supplement to its July 30, 2003 filing of Rate Schedule
No. 13. PPL states that the supplemental filing contains a complete set
of attachments to replace the attachments to the July 30, 2003 filing.
PPL Montana LLC states that copies of this filing have been served
on all PNCA parties.
Comment Date: August 27, 2003.
16. Carolina Power & Light Company
[Docket No. ER03-1156-001]
Take notice that on August 8, 2003, Carolina Power & Light Company,
d/b/a Progress Energy Carolinas, Inc., (CPL) filed Substitute Tariff
Sheets for Rate Schedule No. 121, originally filed on August 4, 2003.
CPL states that the substitute tariff sheets correct typographical
errors and minor omissions in the August 4, 2003 filing.
Carolina Power & Light Company states that copies of the filing
were served on the original list of recipients in the August 4, 2003
filing.
Comment Date: August 29, 2003.
17. Direct Commodities Trading, Inc.
[Docket No. ER03-1162-000]
Take notice that on August 5, 2003, Direct Commodities Trading, Inc
(DCT) petitioned the Commission for acceptance of DCT Rate Schedule
FERC No. 1; the granting of certain blanket approvals, including the
authority to sell electricity at market-based rates; and the waiver of
certain Commission regulations.
DCT states that it intends to engage in wholesale electric power
and energy purchases and sales as a marketer. DCT states that it is not
in the business of generating or transmitting electric power. DCT also
states that it is an independent private corporation, has no affiliates
and is not a subsidiary or parent of any other entity.
Comment Date: August 26, 2003.
18. Energy Cooperative Association of Pennsylvania
[Docket No. ER03-1165-000]
Take notice that on August 6, 2003, Energy Cooperative Association
of Pennsylvania (ECAP) petitioned the Commission for acceptance of ECAP
Rate Schedule FERC No. 1; the granting of certain blanket approvals,
including the authority to sell electricity at market-based rates; and
the waiver of certain Commission regulations.
ECAP states that it intends to engage in wholesale electric power
and energy purchases and sales as a marketer. ECAP further states it is
not in the business of generating or transmitting electric power and
that it is not affiliated with any other organization
Comment Date: August 27, 2003.
19. Avista Corporation
[Docket No. ER03-1166-000]
Take notice that on August 6, 2003, Avista Corporation (Avista)
tendered for filing revisions to its 18th Revised FERC Rate Schedule
No. 105, the General Transfer Agreement between Avista and the
Bonneville Power Administration. Avista states that the revisions to
the rate schedule consist of changes to data in exhibits to the General
Transfer Agreement to reflect changes in transmission facilities and
Bonneville Power Administration's customers and correct certain
clerical errors in the effective date. Avista requests an effective
date for the changes of October 1, 2003.
Avista states that a copy of this filing was served upon the
Bonneville Administration, the counterparty to the General Transfer
Agreement.
Comment Date: August 27, 2003.
20. PJM Interconnection, L.L.C.
[Docket No. ER03-1167-000]
Take notice that on August 6, 2003, PJM Interconnection, L.L.C.
(PJM), submitted for filing an interconnection service agreement (ISA)
among PJM, DuPont Textiles and Interiors, Inc., and Delmarva Power &
Light Company d/b/a Conectiv Power Delivery and a notice of
cancellation of an Interim ISA that has been superseded.
PJM requests a waiver of the Commission's 60-day notice requirement
to permit a July 17, 2003 effective date for the ISA. PJM states that
copies of this filing were served upon the parties to the agreement and
the state regulatory commissions within the PJM region.
Comment Date: August 27, 2003.
21. PJM Interconnection, L.L.C.
[Docket No. ER03-1168-000]
Take notice that on August 6, 2003, PJM Interconnection, L.L.C.
(PJM), submitted for filing an interconnection service agreement (ISA)
among PJM, U.S. General Service Administration, Heating Operation and
Transmission District, and Potomac Electric Power Company.
[[Page 52393]]
PJM requests a waiver of the Commission's 60-day notice requirement
to permit a July 14, 2003 effective date for the ISA. PJM states that
copies of this filing were served upon the parties to the agreement and
the state regulatory commissions within the PJM region.
Comment Date: August 27, 2003.
22. PJM Interconnection, L.L.C.
[Docket No. ER03-1169-000]
Take notice that on August 6, 2003, PJM Interconnection, L.L.C.
(PJM), submitted for filing an interconnection service agreement (ISA)
among PJM, Bethesda Triangle LLC, and Potomac Electric Power Company.
PJM requests a waiver of the Commission's 60-day notice requirement
to permit a July 29, 2003 effective date for the ISA. PJM states that
copies of this filing were served upon the parties to the agreement and
the state regulatory commissions within the PJM region.
Comment Date: August 27, 2003.
23. Entegra North America, L.P.
[Docket No. ER03-1170-000]
Take notice that on August 6, 2003, Entegra North America, L.P.
(Entegra) petitioned the Commission for acceptance of Entegra Rate
Schedule FERC No. 1; the granting of certain blanket approvals,
including the authority to sell electricity at market-based rates; and
the waiver of certain Commission regulations.
Entegra states that it intends to engage in wholesale electric
power and energy purchases and sales as a marketer. Entegra also states
that it is not in the business of generating or transmitting electric
power.
Comment Date: August 27, 2003.
24. Deseret Generation & Transmission Co-operative, Inc.
[Docket No. ER03-1171-000]
Take notice that on August 6, 2003, Deseret Generation &
Transmission Co-operative, Inc. (Deseret) tendered an informational
filing in compliance with Service Agreements on file with the
Commission. Deseret states that the filing sets forth the revised
approved costs for member-owned generation resources and the revised
approved reimbursements under its Resource Integration Agreements with
two of its members, Garkane Power Association, Inc. and Moon Lake
Electric Association, Inc.
Deseret states that a copy of this filing has been served upon all
of Deseret's members.
Comment Date: August 27, 2003.
25. Midwest Energy, Inc.
[Docket No. ER03-1172-000]
Take notice that on August 6, 2003, Midwest Energy, Inc. (Midwest)
submitted for filing an amendment to FERC Rate Schedule No. 19,
superseding Westar Energy, Inc. First Revised FERC No. 264,
Transmission Service Contract between Midwest and Kansas Electric Power
Cooperative, Inc., (KEPCo).
Midwest states that a copy of this filing was served upon the
Kansas Corporation Commission and KEPCo.
Comment Date: August 27, 2003.
26. Nicole Energy Marketing, Inc.
[Docket No. ER03-1179-000]
Take notice that on August 8, 2003, Nicole Energy Marketing, Inc.,
submitted for filing a Notice of Cancellation of the Market-based Rate
Authority for Nicole Energy Marketing of Illinois, Inc., issued in
Docket No. ER00-3637-000. Nicole Energy Marketing of Illinois, Inc.,
states it is no longer in business.
Comment Date: August 29, 2003.
27. Nicole Energy Services, Inc.
[Docket No. ER03-1180-000]
Take notice that on August 8, 2003, Nicole Energy Services, Inc.,
submitted for filing a Notice of Cancellation of the Market-based Rate
Authority for Nicole Energy Services, Inc., issued in Docket No. ER98-
2683-000. Nicole Energy Services, Inc. states that it is dissolved and
will not be doing any business.
Comment Date: August 29, 2003.
28. New England Power Pool
[Docket No. ER03-1181-000]
Take notice that on August 8, 2003, the New England Power Pool
(NEPOOL) Participants Committee submitted a filing pursuant to Section
203 of the Federal Power Act requesting acceptance of Amendment No. 4
(Amendment) to the Interim Independent System Operator Agreement (ISO
Agreement) dated July 1, 1997 between ISO New England Inc. (ISO) and
the NEPOOL Participants. NEPOOL states that the Amendment is solely to
extend the term of the ISO Agreement by up to one year, to December 31,
2004. NEPOOL has requested that the Commission issue an order approving
the Amendment on or before October 7, 2003.
NEPOOL Participants Committee states that copies of these materials
were sent to the New England state governors and regulatory commissions
and the Participants in NEPOOL.
Comment Date: August 29, 2003.
29. Tyr Energy, LLC
[Docket No. ER03-1182-000]
Take notice that on August 7, 2003, Tyr Energy, LLC tendered for
filing a request for acceptance of Tyr Energy, LLC's FERC Rate Schedule
No. 1; the granting of certain blanket approvals, including the
authority to sell electricity at market-based rates; and the waiver of
certain Commission regulations.
Tyr Energy, LLC states that it intends to engage in wholesale
electric power and energy purchases and sales as a marketer. Tyr
Energy, LLC also states that it is not in the business of generating or
transmitting electric power.
Comment Date: August 28, 2003.
30. White River Electric Association, Inc.
[Docket No. ER03-1184-000]
Take notice that on August 8, 2003, White River Electric
Association, Inc. (White River) filed a rate schedule and a service
agreement for the provision of emergency service to Moon Lake Electric
Association, Inc., pursuant to Section 205 of the Federal Power Act
(FPA), 16 U.S.C. 824d and 35.12 of the Federal Energy Regulatory
Commission's (Commission) Regulations. White River requests that the
Commission grant all waivers necessary to allow the rate schedule to
have an effective date of October 26, 1999. White River states that its
filing is available for public inspection at its offices in Meeker,
Colorado.
White River states that a copy of the filing was served upon Moon
Lake Electric Association Inc. and the Colorado Public Utilities
Commission.
Comment Date: August 29, 2003.
31. Commonwealth Edison Company
[Docket No. ER03-1196-000]
Take notice that on August 8, 2003, Commonwealth Edison Company
(ComEd) tendered for filing with the Federal Energy Regulatory
Commission (Commission) an executed Dynamic Scheduling Agreement (DSA)
entered into between ComEd and Wisconsin Electric Power Company
(Wisconsin Electric) under ComEd's Open Access Transmission Tariff.
ComEd states that the executed DSA replaces the unexecuted DSA filed in
connection with seven Service Agreements which were previously accepted
for filing. ComEd requests effective dates of June 1, 2003 and June 1,
2004 for the respective Service Agreements and associated DSA.
ComEd states that copies of the filing were served upon Wisconsin
Electric,
[[Page 52394]]
the Illinois Commerce Commission and Wisconsin Public Service
Commission.
Comment Date: August 29, 2003.
Standard Paragraph
Any person desiring to intervene or to protest this filing should
file with the Federal energy Regulatory Commission, 888 First Street,
NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211
and385.214). Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Any person wishing to
become a party must file a motion to intervene. All such motions or
protests should be filed on or before the comment date, and, to the
extent applicable, must be served on the applicant and on any other
person designated on the official service list. This filing is
available for review at the Commission or may be viewed on the
Commission's Web site at http://www.ferc.gov, using the eLibrary
(FERRIS) link. Enter the docket number excluding the last three digits
in the docket number field to access the document. For assistance,
please contact FERC Online Support at [email protected] or
toll-free at (866)208-3676, or for TTY, contact (202)502-8659. Protests
and interventions may be filed electronically via the Commission's Web
site under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. 03-22590 Filed 9-2-03; 8:45 am]
BILLING CODE 6717-01-P