DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP03-327-000]
Southern Natural Gas Company; Notice of Request Under Blanket
Authorization
June 27, 2003.
Take notice that on June 20, 2003, Southern Natural Gas Company
(Southern), P.O. Box 2563, Birmingham, Alabama, filed a request
pursuant to Sections 157.205, 157.208(b)(2) and 157.211(a)(2) of the
Federal Energy Regulatory Commission*s (Commission) Regulations under
the Natural Gas Act (NGA), as amended, and blanket certificate
authority granted September 1, 1982, in Docket No. CP82-406-000, 20
FERC ] 62,414 for authorization to construct and operate a new delivery
point to Tamko Roofing Products, Inc. (Tamko) in Tuscaloosa County,
Alabama, all as more fully set forth in the request, which is on file
with the Commission, and open for public inspection. This filing is
available for review at the Commission or may be viewed on the
Commission's Web site at http://www.ferc.gov, using the ``FERRIS''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, please
contact FERC Online Support at [email protected] or toll-free
at (866) 208-3676 or for TTY, contact (202) 502-8659.
Southern proposes to construct and operate certain measurement and
other appurtenant facilities to provide up to 1,800 Mcf/day of
transportation service for Tamko, under Southern's Rate Schedule IT.
Service to the Tamko Plant will be provided at a new delivery point to
be located at approximately Mile Post 20.625 on Southern's 12-inch
Montgomery-Columbus Line in Tuscaloosa County, Alabama. Southern and
Tamko have complied with all of the requirements under Section 36 of
the General Terms and Conditions of Southern's FERC Gas Tariff, 7th
Revised Volume No. 1 for the installation of the direct delivery
connection by Southern. Tamko will reimburse Southern for the estimated
$235,100 cost of constructing and installing the proposed facilities
pursuant to an executed Construction and Reimbursement Agreement dated
May 30, 2003.
Southern states that the installation of the proposed facilities
will have no adverse effect on its ability to provide its firm
deliveries. Any questions regarding this filing should be directed to
John Griffin, Senior Counsel, Southern Natural Gas Company, P.O. Box
2563, Birmingham, Alabama 35202-2563 or call 205-325-7133.
Any person or the Commission's staff may, within 45 day after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to section 157.205 of
the Regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the NGA. Comments, protests and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings.
Magalie R. Salas,
Secretary.
[FR Doc. 03-16852 Filed 7-2-03; 8:45 am]
BILLING CODE 6717-01-P