[Federal Register Volume 68, Number 97 (Tuesday, May 20, 2003)]
[Notices]
[Pages 27596-27597]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 03-12598]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-302]
Florida Power Corporation, Crystal River Unit 3 Nuclear
Generating Plant; Exemption
1.0 Background
Florida Power Corporation (the licensee) is the holder of Facility
Operating License No. DPR-72, which authorizes operation of the Crystal
River Unit 3 Nuclear Generating Plant (Crystal River). The license
provides, among other things, that the facility is subject to all
rules, regulations, and orders of the U.S. Nuclear Regulatory
Commission (the Commission) now or hereafter in effect.
The facility consists of one pressurized-water reactor located in
Citrus County, Florida.
2.0 Request/Action
Title 10 of the Code of Federal Regulations (10 CFR) Section 55.59
requires that a facility's licensed operator requalification program be
conducted for a continuous period not to exceed 2 years (24 months) and
upon conclusion must be promptly followed, pursuant to a continuous
schedule, by successive requalification programs. Each 2-year
requalification program must include a biennial comprehensive written
examination and annual operating tests.
By letter dated March 6, 2003, the licensee requested a one-time
exemption under 10 CFR 55.11 from the schedule requirements of 10 CFR
55.59. Specifically, for Crystal River, the licensee has requested a
one-time extension from December 31, 2004, to February 28, 2005, for
completing the current licensed operator requalification program. The
next requalification program period would begin March 1, 2005, and
continue for 24 months to February 28, 2007, with successive periods
running for 24 months. This requested exemption would allow an
extension of 2 months beyond the 24-month requalification program
schedule required by 10 CFR 55.59.
3.0 Discussion
Pursuant to 10 CFR 55.11, the Commission may, upon application by
[[Page 27597]]
an interested person, or upon its own initiative, grant exemptions from
the requirements of 10 CFR Part 55 when the exemptions are authorized
by law and will not endanger life or property and are otherwise in the
public interest. The exemption being requested for Crystal River is to
alleviate potential scheduling difficulties associated with
administering requalification examinations and completing the
requalification program at the end of the 2004 calendar year. Moving
the end of the requalification program to February 28, 2005, would: (1)
Minimize the fall refueling outage impact on requalification
examination development; (2) minimize the potential impact from any
fall refueling outage extensions; (3) minimize the scheduling and
resource impact from both the Thanksgiving and Christmas holidays; (4)
minimize the potential scheduling and resource impact of any
examination remediation or retesting requirements during the holidays;
and (5) minimize the potential impact from future bargaining unit
negotiations, which occur periodically in the fourth calendar quarter.
Although the 24-month schedule requirement of 10 CFR 55.59 at
Crystal River would be exceeded, operator performance continues to be
satisfactory, as demonstrated by the operators' strong performance
during the recent end-of-cycle requalification examinations. Granting
this exemption will allow Crystal River to continue with safe plant
operations without undue hardship to plant personnel and Crystal River
licensed operators.
4.0 Conclusion
Accordingly, the Commission has determined that, pursuant to 10 CFR
55.11, granting an exemption to the licensee from the schedule
requirements in 10 CFR 55.59, by allowing Crystal River a one-time
extension in the allowed time for completing the current licensed
operator requalification program, is authorized by law and will not
endanger life or property and is otherwise in the public interest.
Therefore, the Commission hereby grants Florida Power Corporation an
exemption on a one-time only basis from the schedule requirement of 10
CFR 55.59, to allow the completion date for the current licensed
operator requalification program for the Crystal River Unit 3 Nuclear
Generating Plant to be extended from December 31, 2004, to February 28,
2005. The next requalification program period would begin March 1,
2005, and continue for 24 months to February 28, 2007, with successive
periods running for 24 months.
Pursuant to 10 CFR 51.32, the Commission has determined that the
granting of this exemption will not have a significant effect on the
quality of the human environment (68 FR 25069).
This exemption is effective upon issuance and expires on February
28, 2005.
For the Nuclear Regulatory Commission.
Dated at Rockville, Maryland, this 14th day of May 2003.
Bruce A. Boger,
Director, Division of Inspection Program Management, Office of Nuclear
Reactor Regulation.
[FR Doc. 03-12598 Filed 5-19-03; 8:45 am]
BILLING CODE 7590-01-P