[Federal Register Volume 68, Number 14 (Wednesday, January 22, 2003)]
[Notices]
[Page 3052]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 03-1329]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Advisory Committee on Reactor Safeguards Subcommittee Meeting on
Thermal-Hydraulic Phenomena; Notice of Meeting
The ACRS Subcommittee on Thermal-Hydraulic Phenomena will hold a
meeting on February 4, 2003, Room T-2B3, 11545 Rockville Pike,
Rockville, Maryland.
The entire meeting will be open to public attendance.
The agenda for the subject meeting shall be as follows:
Tuesday, February 4, 2003--1:00 p.m. Until the Conclusion of Business
The Subcommittee will review two proposed NRC documents for
resolution of Generic Safety Issue-191, ``Assessment of Debris
Accumulation on PWR Sump Performance''. These documents are: proposed
NRC Generic Letter 2003-XX, ``Potential Impact of Debris Blockage on
Emergency Recirculation During Design-Basis Accidents at Pressurized
Water Reactors'', and associated draft Regulatory Guide DG-1107,
``Water Sources for Long-Term Recirculation Cooling Following a Loss-
of-Coolant Accident''. The purpose of this meeting is to gather
information, analyze relevant issues and facts, and formulate proposed
positions and actions, as appropriate, for deliberation by the full
Committee.
Oral statements may be presented by members of the public with the
concurrence of the Subcommittee Chairman. Written statements will be
accepted and made available to the Committee. Persons desiring to make
oral statements should notify the Designated Federal Official or the
Cognizant Staff Engineer named below five days prior to the meeting, if
possible, so that appropriate arrangements can be made. Electronic
recordings will be permitted only during those portions of the meeting
that are open to the public.
During the initial portion of the meeting, the Subcommittee, along
with any of its consultants who may be present, may exchange
preliminary views regarding matters to be considered during the balance
of the meeting.
The Subcommittee will then hear presentations by and hold
discussions with representatives of the NRC staff, Nuclear Energy
Institute, and other interested persons regarding this review.
Further information regarding topics to be discussed, whether the
meeting has been canceled or rescheduled, and the Chairman's ruling on
requests for the opportunity to present oral statements and the time
allotted therefor can be obtained by contacting the Designated Federal
Official, Mr. Sam Duraiswamy (telephone: 301-415-7364) or Mr. Michael
R. Snodderly, Cognizant Staff Engineer (telephone: 301-415-6927)
between 7:30 a.m. and 4:15 p.m. (EST). Persons planning to attend this
meeting are urged to contact one of the above named individuals at
least two working days prior to the meeting to be advised of any
potential changes to the agenda.
Dated: January 15, 2003.
Sher Bahadur,
Associate Director for Technical Support, ACRS/ACNW.
[FR Doc. 03-1329 Filed 1-21-03; 8:45 am]
BILLING CODE 7590-01-P