[Federal Register Volume 67, Number 210 (Wednesday, October 30, 2002)]
[Notices]
[Pages 66136-66137]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 02-27658]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER02-763-003, et al.]


Indigo Generation LLC, et al.; Electric Rate and Corporate 
Filings

October 23, 2002.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Indigo Generation LLC, Larkspur Energy LLC and Wildflower Energy LP 
(collectively the Wildflower Entities)

[Docket No. ER02-763-003]

    Take notice that on October 21, 2002, Indigo Generation LLC, 
Larkspur Energy LLC and Wildflower Energy LP (collectively the 
Wildflower Entities) supplemented their June 26, 2002 filing in 
compliance with the directives of the Commission in a letter order 
dated June 11, 2002 in the above-captioned dockets.
    Comment Date: November 12, 2002.

2. PECO Energy Company

[Docket No. ER02-1779-001]

    Take notice that on October 21, 2002, PECO Energy Company (PECO) 
submitted for filing First Revised Page 32 to the Interconnection 
Agreement between PECO, and Rock Springs Generation LLC and CED Rock 
Springs, Inc. (Rock Springs/CED), and requests an effective date of 
October 21, 2002. The Interconnection Agreement had originally been 
filed by PECO Energy unexecuted. The unexecuted Interconnection 
Agreement was designated as Service Agreement No. 669 under PJM 
Interconnection L.L.C.'s (PJM) FERC Electric Tariff Fourth Revised 
Volume No. 1, and accepted by the Commission for filing with an 
effective date of May 10, 2002, subject to PECO Energy making this 
compliance filing. Original Page 32 has been revised to reflect the 
electronic signatures of the parties to the Interconnection Agreement.
    Other than the addition of the parties' signatures, the 
Interconnection Agreement remains unchanged. Copies of this filing were 
served on Rock Springs/CED and PJM.
    Comment Date: November 12, 2002.

3. New England Power Pool and ISO New England Inc.

[Docket No. ER02-2330-003]

    Take notice that on October 21, 2002, the New England Power Pool 
(NEPOOL) Participants Committee and ISO New England Inc. submitted 
revisions to Market Rule 1 in response to requirements of the 
Commission's September 20, 2002 order in New England Power Pool et al., 
100 FERC ] 61,287 (2002).
    The NEPOOL Participants Committee states that copies of these 
materials were sent to all persons identified on the service lists in 
the captioned proceedings, the NEPOOL Participants and the six New 
England state governors and regulatory commissions.
    Comment Date: November 12, 2002.

4. PPL Electric Utilities Corporation

[Docket No. ER03-3-001]

    Take notice that on October 21, 2002, PPL Electric Utilities 
Corporation (PPL Electric) filed an executed Interconnection Agreement 
between PPL Electric and Allegheny Electric Cooperative, Inc. for 
interconnection at the Renovo/Chapman delivery point. The executed 
Interconnection Agreement replaces the unexecuted version that was 
filed in this docket on October 1, 2002.
    Comment Date: November 12, 2002.

5. PPL Electric Utilities Corporation

[Docket No. ER03-4-001]

    Take notice that on October 21, 2002, PPL Electric Utilities 
Corporation (PPL Electric) filed an executed Interconnection Agreement 
between PPL Electric and Allegheny Electric Cooperative, Inc. for 
interconnection at the Fairfield delivery point. The executed 
Interconnection Agreement replaces the unexecuted version that was 
filed in this docket on October 1, 2002.
    Comment Date: November 12, 2002.

6. PECO Energy Company

[Docket No. ER03-63-000]

    Take notice that on October 21, 2002 PECO Energy Company (PECO) 
submitted for filing an Interconnection Agreement by and between PECO 
and FPL Energy Marcus Hook, L.P. (FPL) for Generation Interconnection 
and Parallel Operation, designated as Service Agreement No. 791 under 
PJM

[[Page 66137]]

Interconnection, L.L.C.''s FERC Electric Tariff, Fourth Revised Volume 
No. 1, to be effective on October 21, 2002. Copies of this filing were 
served on Visteon and PJM.
    Comment Date: November 12, 2002.

7. PECO Energy Company

[Docket No. ER03-64-000]

    Take notice that on October 21, 2002, PECO Energy Company (PECO) 
submitted for filing a Construction Agreement between PECO and Fairless 
Energy, LLC (Fairless Energy) related to the Fairless Energy Station, 
to be located in Fairless Hills, Pennsylvania. The Construction 
Agreement was designated as Service Agreement 792 under PJM 
Interconnection L.L.C.'s (PJM) FERC Electric Tariff Fourth Revised 
Volume No. 1. The proposed effective date for the Construction 
Agreement is October 21, 2002. Copies of this filing were served on 
Fairless Energy and PJM.
    Comment Date: November 12, 2002.

8. Allegheny Trading Finance Company

[Docket No. ER03-65-000]

    Take notice that on October 21, 2002, Allegheny Trading Finance 
Company (ATF) filed a market rate tariff of general applicability under 
which it proposes to sell capacity and energy to affiliates and non-
affiliates at market-based rates, and to make such sales to franchised 
public utility affiliates at rates capped by a publicly available 
regional index price. ATF requests an effective date of October 22, 
2002.
    Comment Date: November 12, 2002.

9. Idaho Power Company

[Docket No. ER03-66-000]

    Take notice that on October 21, 2002, Idaho Power Company filed the 
Goshen Series Capacitor Replacement Agreement between Idaho Power 
Company and PacifiCorp.
    Comment Date: November 12, 2002.

10. PJM Interconnection, L.L.C.

[Docket No. ER03-67-000]

    Take notice that on October 21, 2002 PJM Interconnection, L.L.C. 
(PJM), submitted for filing thirty-three executed interconnection 
service agreements and interim interconnection service agreements 
between PJM and Conectiv Bethlehem, Inc., Industrial Power Generating 
Corp., PPL Martins Creek, L.L.C., PSEG Nuclear LLC, MM Hackensack 
Energy L.L.C., Delaware Municipal Electric Corporation, Conectiv 
Delmarva Generation, Inc., Constellation Power Source Generation, Inc., 
PPL Holtwood, L.L.C., Energy Systems North East, L.L.C., Conectiv Mid-
Merit Inc., Lebanon Methane Recovery, Inc., Williams Generation 
Company--Hazleton, Somerset Windpower, L.L.C., AES Red Oak, L.L.C., 
Susquehanna Electric Company, LMB Funding, Limited Partnership, PPL 
Susquehanna, LLC, AES Ironwood L.L.C., Sight and Sound Ministries, 
Inc., Motiva Enterprises, L.L.C., Public Service Electric and Gas 
Company, PSEG Power, L.L.C., PPL Montour, LLC, Mantua Creek Generating 
Company, LP, and Liberty Electric Power, LLC, and three notices of 
cancellation of certain ISAs and Interim ISAs that have been 
superceded.
    PJM requests a waiver of the Commission's 60-day notice requirement 
to permit the effective dates agreed to by the parties. Copies of this 
filing were served upon each of the parties to the agreements and the 
state regulatory commissions within the PJM region.
    Comment Date: November 12, 2002.

Standard Paragraph

    Any person desiring to intervene or to protest this filing should 
file with the Federal Energy Regulatory Commission, 888 First Street, 
NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214). Protests will be considered by the Commission in determining 
the appropriate action to be taken, but will not serve to make 
protestants parties to the proceeding. Any person wishing to become a 
party must file a motion to intervene. All such motions or protests 
should be filed on or before the comment date, and, to the extent 
applicable, must be served on the applicant and on any other person 
designated on the official service list. This filing is available for 
review at the Commission or may be viewed on the Commission's Web site 
at http://www.ferc.gov, using the ``FERRIS'' link. Enter the docket 
number excluding the last three digits in the docket number filed to 
access the document. For assistance, call (202) 502-8222 or TTY, (202) 
502-8659. Protests and interventions may be filed electronically via 
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's web site under the ``e-Filing'' link. 
The Commission strongly encourages electronic filings.

Linwood A. Watson, Jr.,
Deputy Secretary.
[FR Doc. 02-27658 Filed 10-29-02; 8:45 am]
BILLING CODE 6717-01-P