NUCLEAR REGULATORY COMMISSION

[Docket No. 40-3453]


Moab Mill Reclamation Trust; Notice of Order and an Opportunity 
for a Hearing

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice of Order transferring License No. SUA-917 for the Moab, 
Utah facility and site from Atlas Corporation to the Moab Mill 
Reclamation Trust; notice of opportunity for a hearing.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory 
Commission (NRC) has signed an Order (copy attached) dated December 27, 
1999, transferring Source Material License SUA-917 for the Moab, Utah, 
facility and site from Atlas Corporation (Atlas) to the Moab Mill 
Reclamation Trust (Trust). On September 22, 1998, Atlas filed a 
petition for relief under Chapter 11 of the U.S. Bankruptcy Code. After 
filing for relief, Atlas entered into settlement discussions with NRC, 
the State of Utah, and other parties to the bankruptcy proceeding 
regarding the reclamation and disposition of the Moab Mill Site. Those 
discussions resulted in the development of the Moab Uranium Millsite 
Transfer Agreement (Settlement Agreement) which provides for transfer 
of the Moab Mill Site and the NRC license to a trust, the trustee of 
which would carry out remediation of the site pursuant to the terms and 
conditions of NRC License SUA-917, as amended on June 24, 1999. The 
terms and conditions of NRC License SUA-917 include the reasonable and 
prudent alternatives (RPAs) and reasonable and prudent measures (RPMs) 
in the U.S. Fish and Wildlife Service's final biological opinion (FBO) 
dated July 29, 1998 (included in the NRC's ``Final Environmental Impact 
Statement Related to Reclamation of the Uranium Mill Tailings at the 
Atlas Site, Moab, Utah,'' (FEIS) NUREG-1531, published in March 1999), 
as well as mitigative measures developed by the NRC staff. The 
Settlement Agreement was submitted to the United States Bankruptcy 
Court for the District of Colorado for approval on April 29, 1999. On 
December 1, 1999, the Court issued an Order confirming the second 
amended plan of reorganization of the Atlas Corporation, which includes 
the Settlement Agreement.

FOR FURTHER INFORMATION CONTACT: Myron Fliegel, Office of Nuclear 
Material Safety and Safeguards, Washington, DC 20555-0001, telephone 
(301) 415-6629, e-mail [email protected].

    Dated at Rockville, Maryland, this 27th day of December 1999.

    For the Nuclear Regulatory Commission.
Michael C. Layton,
Acting Chief, Uranium Recovery and Low-Level Waste Branch, Division of 
Waste Management, Office of Nuclear Material Safety and Safeguards.

Order Transferring License No. SUA-917 for The Moab Mill Site

I.

    Atlas Corporation (Atlas) is the holder of License No. SUA-917, 
which authorized the milling of uranium ore at Atlas' Moab Mill Site 
located in Moab, Utah. In accordance with Amendment No. 31 of the 
license, the license will not expire until the NRC terminates it.

II.

    Atlas acquired the Moab Mill Site in 1962 from the Uranium 
Reduction Company (URC) which built milling facilities and began 
operations at the site in October 1956. The site is located in Grand 
County, Utah, on the northwest shore of the Colorado River, 5 km (3 
miles) from the center of Moab, and can be accessed from U.S. Highway 
191 north of Moab. The site encompasses 162 hectares (400 acres) on the 
outside bend of the Colorado River, at the southern terminus of the 
Moab Canyon. The site is surrounded on the north and west sides by high 
sandstone cliffs; to the north and east is Moab Wash; to the east and 
south is the flood plain of the Colorado River; and, across the river, 
is Moab Marsh. The site generally slopes toward the Colorado River and 
Moab Wash. The uranium tailings from the Moab milling operations occupy 
about 53 hectares (130 acres) of land about 230 m (750 ft) from the 
Colorado River. Mill operations ceased in 1984. Decommissioning of the 
mill began in 1988. Construction of an interim cover for placement over 
the tailing disposal area began in 1989 and was completed in 1995.

III.

    On September 22, 1998, Atlas filed a petition for relief under 
Chapter 11 of the U.S. Bankruptcy Code and since that date has been 
operating as a Debtor in Possession. After filing for relief, Atlas 
entered into settlement discussions with the U.S. Nuclear Regulatory 
Commission (NRC), the State of Utah, and other parties to the 
bankruptcy proceeding regarding the reclamation and disposition of the 
Moab Mill Site. Those discussions resulted in the development of the 
Moab Uranium Millsite Transfer Agreement (Settlement Agreement) which 
provides for transfer of the Moab Mill Site and the NRC license to a 
trust, the trustee of which would carry out remediation of the site 
pursuant to the terms and conditions of NRC License SUA-917, as amended 
on June 24, 1999. The terms and conditions of NRC License SUA-917 
include the reasonable and prudent alternatives (RPAs) and reasonable 
and prudent measures (RPMs) in the U.S. Fish and Wildlife Service's 
final biological opinion (FBO) dated July 29, 1998 (included in the 
NRC's ``Final Environmental Impact Statement Related to Reclamation of 
the Uranium Mill Tailings at the Atlas Site, Moab,

[[Page 139]]

Utah,'' (FEIS) NUREG-1531, published in March 1999), as well as 
mitigative measures developed by the NRC staff.
    The NRC, which had filed claims in bankruptcy against Atlas 
totaling about $44 million, entered into the Settlement Agreement 
described in the preceding paragraph rather than involve the NRC in a 
protracted legal dispute over the limited funds that would be available 
for site remediation from the liquidation of the Atlas Corporation. The 
NRC believes that measures taken pursuant to the Settlement Agreement 
will permit remediation of the Moab Mill Site to proceed in a more 
timely manner and will maximize the amount of private funding available 
for remediation of the Moab Mill Site. The Settlement Agreement was 
submitted to the United States Bankruptcy Court for the District of 
Colorado for approval on April 29, 1999. On December 1, 1999, the Court 
issued an Order confirming the second amended plan of reorganization of 
the Atlas Corporation, which includes the Settlement Agreement.
    Consistent with the terms of the Settlement Agreement, the NRC and 
the State of Utah undertook to identify a Trustee to administer the 
Moab Mill Reclamation Trust (Trust). PricewaterhouseCoopers LLP 
(Trustee) has agreed to undertake remediation of the Moab Mill Site, 
pursuant to 10 CFR Part 40 under License SUA-917 and in accordance with 
the Trust established for such purposes. The NRC has agreed to accept 
the Settlement Agreement in satisfaction of Atlas' regulatory 
responsibilities under 10 CFR Part 40 for remediation of the Moab Mill 
Site, to transfer License SUA-917 to the Trust, and to limit the 
Trustee's liability for remediation and maintenance of the site to the 
amount of funding available to the Trust from Atlas' assets, 
receivables and future receivables transferred to the Trust under the 
Settlement Agreement, and any other assets which may become available 
to the Trust. The NRC is aware that because of the time involved in 
concluding the bankruptcy proceeding, some dates in the license 
conditions have already passed while others are imminent and therefore, 
might be impractical for the Trustee to meet. These dates will be 
considered in future actions.
    Current assets and receivables include the following:
    (1) $5.25 million in cash from Atlas/ACSTAR (the entity which holds 
the reclamation bond issued for the benefit of the NRC to be used for 
reclamation of the Moab Mill Site.
    This entity has agreed to transfer the sum to the Trust in full and 
complete satisfaction of its obligations under Bond #5652);
    (2) The assignment of funds from the Department of Energy pursuant 
to the Energy Policy Act of 1992 (Pub. L. 102-486, Title X, Section 
1001, Oct. 24, 1992, 106 Stat. 2946, codified at 42 U.S.C. 2296(a)), 
[hereinafter ``Title X funds''] for past claims. This amount is 
estimated to be approximately $1,082,000;
    (3) Fifty (50) percent of any net recovery from collection of the 
disputed Title X claim for dismantling performed by American 
Reclamation and Dismantling Inc. (ARD claim);
    (4) Any and all of Atlas' rights as a licensee to future Title X 
funds;
    (5) Atlas' water rights located at the Moab Land, listed as 6.3 
cubic feet per second (cfs) from the Colorado River, Grand County, 
Utah, Water Right Number 01-40, Application 30032, Certificate No. 
60111;
    (6) Atlas' possible Water Rights in the following:
    A. Water Right Number 01-1121 for 31 acre-feet, a segregation 
application from Water Right Number 01-40;
    B. Water Right Number 09-199 for 3.33 cfs in the San Juan River;
    C. Water Right Number 05-982 for .015 cfs for a well in the 
Monticello Mining District;
    D. Water Right Number 99-32 for .004 cfs from Seep Springs 
(approximately 4 miles from Fry Canyon);
    (7) Atlas' interest in the certain real property owned by Atlas and 
consisting of approximately 430 acres, located in Grand County, Utah, 
together with all buildings, structures, improvements, appurtenances, 
fixtures, and easements; and
    (8) Two and a half (2.5) percent of the stock in a reorganized 
Atlas Corporation which would be issued to the Reclamation Trust.
    The land and water rights, herein described, have stand-alone value 
and may be sold by the Trustee independent of, and prior to or during, 
any reclamation work being performed at the site by the Trustee. As to 
items 5, 6, and 7 above, Atlas will transfer all said assets to the 
Trust by way of quit claim deed or similar document, without 
representations, warranties, or indemnification rights of any kind.

IV.

    Remediation of the Moab Mill Site is to be conducted in accordance 
with the terms and conditions of License SUA-917. These include the 
RPAs and RPMs in the U.S. Fish and Wildlife Service's FBO, dated July 
29, 1998. The Trustee has agreed to these terms and conditions. The 
NRC, as the lead Federal Agency regarding the consultation required 
under Section 7 of the Endangered Species Act of 1973 (16 U.S.C. 1531 
et seq.), has included these RPAs and RPMs in the NRC's NUREG-1531 
published in March 1999.
    The Trustee's maintenance of the site and administration of the 
remediation of the site in accordance with the terms of license SUA-917 
and the terms of this Order, will provide adequate protection of the 
public health and safety and reasonable assurance of compliance with 
the Commission's regulations.
    Pursuant to the terms of the Settlement Agreement described in the 
preceding sections of this Order, the NRC, with concurrence from the 
State of Utah, selected PricewaterhouseCoopers LLP as Trustee. 
PricewaterhouseCoopers LLP is qualified to perform the duties 
enumerated in this Order.
    In view of the foregoing, I have authorized the transfer of License 
SUA-917 which will be amended to reflect the change in the named 
licensee. The Trustee accedes to this Order voluntarily, and has agreed 
to take the necessary steps to undertake remediation of the site to the 
extent permitted by the funds available to the Trust, according to the 
requirements in Part V of this Order.

V.

    Accordingly, pursuant to Sections 62, 63, 81, 84, 161b, 161i, 161o 
and 184 of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011 et 
seq.), and the Commission's regulations in 10 CFR Part 40, it is hereby 
ordered That, effective December 30, 1999, License SUA-917 is 
transferred to the Trust and the Trustee is authorized to possess 
byproduct material in the form of uranium waste tailings and other 
uranium waste generated by Atlas' milling operations at the Moab Mill 
Site pursuant to the terms and conditions of License SUA-917. It is 
further ordered that:
    A. The Trustee shall:
    1. Perform remediation of the site pursuant to the terms and 
conditions of NRC License SUA-917.
    2. Notify and request relief from the Chief, Uranium Recovery and 
Low-Level Waste Branch, Division of Waste Management, Office of Nuclear 
Material Safety and Safeguards, NRC, Washington, DC 20555-0001, if the 
Trustee believes it should be relieved of any requirements in the 
license because the Trustee believes that these requirements are 
impracticable given the parameters of the Trust Agreement or that they 
have either been satisfactorily completed or are unnecessary. The 
Trustee will continue

[[Page 140]]

to comply with all requirements in this license pending NRC action on 
the Trustee's request for relief from specified requirements under this 
subsection.
    3. Cooperate with the NRC (or its contractor) in NRC's site 
inspections.
    4. Cooperate with the U.S. Department of Energy (DOE) in matters 
relating to the transfer of the site to DOE, including preparation by 
DOE of the site Long-Term Surveillance Plan required by 10 C.F.R. 
40.28.
    5. Use reasonable efforts to secure all Title X funds from the 
Department of Energy pursuant to section 1001 of the Energy Policy Act 
of 1992 (42 U.S.C. 13201 et seq.) to which it is legally entitled, 
including requests for additional Title X funds from DOE based on 
remediation work at the site performed by or on behalf of the Trust.
    6. Notify the Director, Office of Nuclear Material Safety and 
Safeguards, NRC, Washington, DC 20555-0001, and the Regional 
Administrator, NRC Region IV, NRC Region IV, 611 Ryan Plaza Drive, 
Suite 400, Arlington, TX 76011-8064, by certified registered mail, no 
later than 180 days prior to the anticipated date, that all contractual 
and other projected obligations will have reasonably exhausted the 
Trust Fund.
    7. Upon notification required by paragraph 6 of this Part, cease 
remediation work as set forth in this Order, and commence passive 
maintenance and monitoring only of the site in order to provide for the 
protection of the public health and safety using the remaining assets 
in the Reclamation Trust to fund monitoring and maintenance until 
further order of the NRC.
    B. Upon completion of the NRC inspection to determine that the site 
has been remediated in conformance with the requirements in 10 C.F.R. 
Part 40 and the conditions set forth in the license to the extent 
practicable given the funding available to the Trustee, title to the 
real property and the remaining byproduct material at the Moab Mill 
Site will be transferred in accordance with section 83 of the Atomic 
Energy Act of 1954, as amended, and the Commission's regulations, and 
this license shall be modified or terminated accordingly.
    C. Notwithstanding any of the foregoing requirements, the NRC shall 
not require the Trustee to perform or pay for any reclamation, 
remediation, monitoring, or surveillance, the cost of which would 
exceed the amount of money available to the Trustee from the Trust 
assets and receivables. The Trustee's responsibilities, liabilities and 
authority under this license shall terminate upon further order of the 
NRC.
    D. The requirements identified in this Order may only be modified 
in writing by the Director, Office of Nuclear Material Safety and 
Safeguards.

VI.

    Any person adversely affected by this Order, other than Atlas or 
the Trustee, may request a hearing within 20 days of its issuance. Any 
request for a hearing shall be submitted to the Secretary, U.S. Nuclear 
Regulatory Commission, Washington, D.C. 20555-0001. Copies of any 
hearing requests also shall be sent to the Director, Office of Nuclear 
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, 
Washington, D.C. 20555-0001; to the Assistant General Counsel for 
Materials Litigation and Enforcement, at the same address; to the 
Regional Administrator, NRC Region IV, 611 Ryan Plaza Drive, Suite 400, 
Arlington, TX 76011-8064 and to the Trustee, PricewaterhouseCoopers 
LLP, Attention: Mr. Keith E. Eastin, Director, 1201 Louisiana, Suite 
2900, Houston, TX 77002-5678. If a hearing is requested, the requester 
shall set forth with particularity the manner in which his or her 
interest is adversely affected by this Order and shall address the 
criteria set forth in 10 C.F.R. 2.1306 and 2.1308.
    If a hearing is requested by a person whose interest is adversely 
affected by this Order, the Commission will consider the hearing 
request pursuant to 10 C.F.R. Part 2, Subpart M, and will issue an 
Order designating the time and place of any hearing. If a hearing is 
held, the procedures of Subpart M will be applied as provided by the 
Order designating the time and place of the hearing. The issue to be 
considered at such hearing shall be whether this Order transferring the 
license should be sustained. Any request for a hearing shall not stay 
the effectiveness of this Order.

    Dated at Rockville, Maryland, this 27th day of December 1999.

    For the Nuclear Regulatory Commission.
William F. Kane,
Director, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 99-34053 Filed 12-30-99; 8:45 am]