[Federal Register Volume 64, Number 239 (Tuesday, December 14, 1999)]
[Notices]
[Pages 69754-69755]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-32262]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application and Applicant Prepared Environmental 
Assessment Accepted for Filing; Requesting Interventions and Protests; 
Establishing Procedural Schedule and Final Amendment Deadline; 
Requesting Comments, Final Terms and Conditions, Recommendations and 
Prescriptions; Requesting Reply Comments

December 8, 1999.
    Take notice that the following hydroelectric application has been 
filed with the Commission. An Applicant-Prepared Environmental 
Assessment (APEA) for the Upper Menominee River Basin Project, which 
includes the project below, has been filed with the Commission. Both 
documents are available for public inspection.
    a. Type of Application: Major New License.
    b. Project No.: 11830-000.\1\
---------------------------------------------------------------------------

    \1\ Project No. 1759 currently consists of three developments, 
Way Dam, Twin Falls, and Peavy Falls Hydroelectric Projects. 
Wisconsin Electric requests that the Commission issue separate 
licenses for these three developments. The Commission has designated 
these three developments as P-1759-036 (Way Dam), P-11830-000 (Peavy 
Falls), and P-11831-000 (Twin Falls).
---------------------------------------------------------------------------

    c. Date filed: October 1, 1999.
    d. Applicant: Wisconsin Electric Power Company (WE).
    e. Name of Project: Peavy Falls Hydroelectric Project.
    f. Location: The project is located on the Michigamme River, near 
Crystal Falls, Iron Mountain, and Kingsford, in Iron County, Michigan. 
The project would not utilize any Federal lands or facilities.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Ms. Rita L. Hayen, P.E., Wisconsin Electric 
Power Company, 231 West Michigan Street, P.O. Box 2046, Milwaukee, WI 
53201-2046.
    i. FERC Contact: Any questions on this notice should be addressed 
to Patti Leppert-Slack, E-mail address 
[email protected], or telephone (202) 219-2767.
    j. Deadline for filing motions to intervene, protests, comments, 
final terms and conditions, recommendations, and prescriptions: 60 days 
from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First St., NE, Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, the 
intervenor must also serve a copy of the document on that resource 
agency.
    k. Status of Environmental Analysis: On March 25, 1996, the 
Director, Office of Hydropower Licensing, approved WE's use of the 
Alternative Licensing Process. Scoping, pursuant to the National 
Environmental Policy Act of 1969 as amended, for the project was 
conducted through scoping documents issued in July 1996 and January 
1997, and in public scoping meetings on September 16 and 17, 1996. The 
draft license application and APEA were distributed by the applicant 
for comment on October 20, 1998.
    Commission staff has reviewed the license application and APEA and 
has determined that the application is acceptable for processing and no 
additional information or studies are needed to prepare the 
Commission's environmental assessment. Comments, as indicated above, 
are being requested from interested parties. The applicant will have 45 
days following the end of this period to respond to those comments, or 
may elect to seek a waiver of this deadline.
    l. Description of Project: The project consists of the following: 
(1) a 200-foot-long, 73-foot-high, multiple-arch dam; (2) an 89-foot-
high concrete gated spillway; (3) 80-foot-long, 20-foat-high right 
concrete gravity dam; (4) a 42-foot-wide concrete intake section; (5) a 
194-foot-long, 40-foot-high left concrete gravity dam; (6) an 
impoundment (Peavy Pond) with a surface area of 2,900 acres and a 
40,800 acre-feet storage capacity at summer pool elevation of 1,283.8 
feet National Geodetic Vertical Datum (NGVD), and a surface area of 490 
acres and a 6,840 acre-feet storage capacity at minimum spring pool 
elevation of 1,268.8 feet NGVD; (7) a 94-foot-long, 48-foot-wide 
powerhouse, containing two generating units, each rated at 7,500 
kilowatts; (8) a 749-foot-long, 17-foot-diameter concrete-lined tunnel; 
(9) a 46-foot-diameter concrete surge tank; (10) a substation; and (11) 
appurtenant facilities.
    m. Locations of the application: A copy of the application is 
available for

[[Page 69755]]

inspection and reproduction at the Commission's Public Reference Room, 
located at 888 First Street, NE, Room 2A, Washington, DC 20426, or by 
calling (202) 208-1371. The application may be viewed on the web at 
www.ferc.fed.us. Call (202) 208-2222 for assistance. A copy is also 
available for inspection and reproduction at the address in item h 
above.
    n. Protests or Motions to Intervene--Anyone may submit a protest or 
a motion to intervene in accordance with the requirements of the Rules 
of Practice and Procedures, 18 CFR Sections 385.210, .211, .214. In 
determining the appropriate action to take, the Commission will 
consider all protests filed, but only those who file a motion to 
intervene in accordance with the Commission's Rules may become a party 
to the proceeding. Any protests or motions to intervene must be 
received on or before the specified deadline date for the particular 
application and APEA.
    o. Filing and Service of Responsive Documents--The Commission is 
requesting comments, recommendations, terms and conditions, 
prescriptions, and reply comments.
    The Commission directs, pursuant to 18 CFR section 4.34(b) of the 
regulations, that all comments, recommendations, terms and conditions, 
and prescriptions concerning the application and APEA be filed with the 
Commission within 60 days from the issuance date of this notice. All 
reply comments must be filed with the Commission within 105 days from 
the date of this notice.
    Anyone may obtain an extension of time for these deadlines from the 
Commission only upon a showing of good cause or extraordinary 
circumstances in accordance with 18 CFR 385.2008.
    p. all filings must: (1) bear in all capital letters the title 
``PROTEST,'' ``MOTION TO INTERVENE,'' ``COMMENTS,'' 
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' ``PRESCRIPTIONS,'' or 
``REPLY COMMENTS;'' (2) set forth in the heading the name of the 
applicant and the project number of the application and APEA to which 
the filing responds; (3) furnish the name, address, and telephone 
number of the person submitting the filing; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth the evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application and APEA directly from the applicant. Any of these 
documents must be filed by providing the original and the number of 
copies required by the Commission's regulations to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE, Washington, DC 
20426. An additional copy must be sent to: Director, Division of 
Licensing and Compliance, Office of Hydropower Licensing, Federal 
Energy Regulatory Commission, at the above address. Each filing must be 
accompanied by proof of service on all persons listed on the service 
list prepared by the Commission in this proceeding in accordance with 
18 CFR 4.34(b) and 385.2010.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-32262 Filed 12-13-99; 8:45 am]
BILLING CODE 6717-01-M