Milford Power Limited Partnership, et al.; Electric Rate and 
Corporate Regulation Filings

November 16, 1999.
    Take notice that the following filings have been made with the 
Commission:

1. Milford Power Limited Partnership

[Docket No. EG00-20-000]

    Take notice that on November 5, 1999, Milford Power Limited 
Partnership, 100 Clinton Square, Suite 403, Syracuse, New York 13202, 
filed with the Federal Energy Regulatory Commission an application for 
determination of exempt wholesale generator status pursuant to Part 365 
of the Commission's regulations.
    Milford Power Limited Partnership owns and operates a cogeneration 
facility in Milford, New Jersey, with a name plate capacity of 
approximately 30.5 MW (Facility). Milford Power Limited Partnership 
sells electric energy and capacity from the Facility at wholesale to CL 
Power Sales Nine, L.L.C., a power marketer.
    Comment date: December 7, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

2. Liberty Electric Power, LLC

[Docket No. EG00-21-000]

    Take notice that on November 5, 1999, Liberty Electric Power, LLC 
(Liberty Electric), with its principal offices c/o Columbia Electric 
Corporation, 13880 Dulles Corner Lane, Herndon, VA 20171, filed with 
the Federal Energy Regulatory Commission an application for 
determination of exempt wholesale generator status pursuant to Section 
32 of the Public Utility Holding Company Act of 1935, as amended, and 
Part 365 of the Commission's regulations.
    Liberty Electric is a Delaware limited liability company which will 
be engaged exclusively in the business of owning and operating a 
nominal 500 MW natural gas-fired generating facility in Eddystone, 
Pennsylvania and selling electricity at wholesale.
    Comment date: December 7, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

[[Page 66627]]

3. Sithe New Jersey Holdings LLC

[Docket No. EG00-23-000]

    Take notice that on November 5, 1999, Sithe New Jersey Holdings LLC 
(SNJH) filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to Part 365 of the Commission's regulations.
    SNJH is an indirect subsidiary of Sithe Energies, Inc., and will 
own and operate five (5) generation facilities in New Jersey (the 
``SNJH Facilities'') after the acquisition of those facilities from 
Jersey Central Power & Light Company, Metropolitan Edison Company and 
Pennsylvania Electric Company. SNJH will be engaged directly and 
exclusively in the business of owning and/or operating the SNJH 
Facilities and selling the SNJH Facilities' electric energy at 
wholesale.
    Comment date: December 7, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

4. Sithe Pennsylvania Holdings LLC

[Docket No. EG00-24-000]

    Take notice that on November 5, 1999, Sithe Pennsylvania Holdings 
LLC (SPH) filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to Part 365 of the Commission's regulations.
    SPH is an indirect subsidiary of Sithe Energies, Inc., and will own 
and operate sixteen generation facilities in Pennsylvania (the SPH 
facilities) after the acquisition of those facilities from Jersey 
Central Power & Light Company, Metropolitan Edison Company and 
Pennsylvania Electric Company. SPH will be engaged directly and 
exclusively in the business of owning and/or operating the SPH 
Facilities and selling the SPH Facilities' electric energy at 
wholesale.
    Comment date: December 7, 1999, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

5. Pacific Gas and Electric Company

[Docket No. EL98-48-001]

    Take notice that on November 1, 1999, Pacific Gas and Electric 
Company (PG&E), tendered for filing a ``First Amendment to the 
Settlement Agreement Between Turlock Irrigation District and Pacific 
Gas and Electric Company'' in order to comply with the Federal Energy 
Regulatory Commission's (Commission) September 30, 1999 Letter. Copies 
of this filing have been served upon the Turlock Irrigation District 
and the California Public Utilities Commission.
    Comment date: December 1, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

6. Tenaska Power Services Co.; and TransAlta Energy Marketing 
(U.S.) Inc.

[Docket Nos. ER94-389-021 and ER98-3184-006]

    Take notice that on October 29, 1999, the above-mentioned power 
marketers filed quarterly reports with the Commission in the above-
mentioned proceedings for information only.

7. Sithe Power Marketing, Inc.

[Docket No. ER98-107-009]

    Take notice that on November 2, 1999, the above-mentioned power 
marketers filed quarterly reports with the Commission in the above-
mentioned proceedings for information only.

8. INFINERGY Services, LLC; Pacific Energy & Development 
Corporation; Entergy Power Marketing Corp.; and Quantum Energy 
Resources, Inc.

[Docket Nos. ER98-3478-004; ER98-1824-007; ER95-1615-020; ER96-947-012; 
ER96-947-013; and ER96-947-014]

    Take notice that on November 4, 1999, the above-mentioned power 
marketers filed quarterly reports with the Commission in the above-
mentioned proceedings for information only.

9. CL Power Sales Seven, L.L.C.; CL Power Sales Eight, L.L.C.; CL 
Power Sales Ten, L.L.C.; CL Power Sales Nine, L.L.C.; CP Power 
Sales Fifteen, L.L.C.; CP Power Sales Fourteen, L.L.C.; CP Power 
Sales Thirteen, L.L.C.; CP Power Sales Twelve, L.L.C.; CP Power 
Sales Nineteen, L.L.C.; CP Power Sales Seventeen, L.L.C.; CP Power 
Sales Eighteen, L.L.C.; CP Power Sales Twenty, L.L.C.; and H.Q. 
Energy Services (U.S.) Inc.

[Docket Nos. ER96-2652-038; ER96-2652-039; ER96-652-040; ER96-2652-041; 
ER99-890-004; ER99-891-004; ER99-892-004; ER99-893-004; ER99-4228-001; 
ER99-4229-001; ER99-4230-001; ER99-4231-001; and ER97-851-010]

    Take notice that on November 1, 1999, the above-mentioned power 
marketers filed quarterly reports with the Commission in the above-
mentioned proceedings for information only.

10. Reliant Energy Etiwanda, LLC

[Docket No. ER99-4398-000]

    Take notice that on November 4, 1999, Reliant Energy Etiwanda, LLC 
(Reliant Etiwanda) tendered for filing an amendment to its filing in 
the above-captioned docket.
    Comment date: November 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

11. Enron Power Marketing, Inc.

[Docket No. ER00-497-000]

    Take notice that on November 1, 1999, Enron Power Marketing, Inc. 
(EPMI), tendered for filing with the Commission an amendment to 
Electric Rate Schedule No. 1, to allow EPMI to sell specified ancillary 
services at market-based rates to the New England Power Pool. 
Consistent with the Commission's current requirements, EPMI also amends 
its rate schedule to specifically state that it sells the ancillary 
services of spinning reserve, non-spinning reserve, and regulation to 
the California ISO at market-based rates.
    EPMI requests that the tariff amendment be made effective on 
January 1, 2000.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

12. Rochester Gas and Electric Corporation

[Docket No. ER00-528-000]

    Take notice that on November 8, 1999, Rochester Gas and Electric 
Corporation (RG&E), tendered for filing with the Federal Energy 
Regulatory Commission (Commission) a Service Agreement between RG&E and 
Columbia Energy Power Marketing (Transmission Customer) for service 
under RG&E's open access transmission tariff. Specifically dealing with 
the Retail Access Program under RG&E's open access transmission tariff.
    RG&E requests waiver of the Commission's notice requirements for 
good cause shown and an effective date of November 1, 1999, for the 
Columbia Energy Power Marketing Service Agreement.
    A copy of this Service Agreement has been served on the 
Transmission Customer and the New York Public Service Commission.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

13. Idaho Power Company

[Docket No. ER99-4560-000]

    Take notice that on September 28, 1999, Idaho Power Company filed a 
service agreement for firm point-to-point transmission service to 
Arizona Public Service Company under Idaho Power Company's transmission 
tariff.
    The service agreement is proposed to become effective October 1, 
1999.

[[Page 66628]]

    Comment date: December 2, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

14. Illinova Power Marketing, Inc.

[Docket No. ER00-431-000]

    Take notice that on November 8, 1999, Illinova Power Marketing, 
Inc. (IPMI), tendered for filing an errata to the Electric Transaction 
Service Agreement filed in this docket on November 1, 1999, under which 
certain customers will take service pursuant to IPMI's power sales 
tariff, Rate Schedule FERC No. 1.
    IPMI has requested an effective date of October 1, 1999, for each 
service agreement.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

15. Portland General Electric Company

[Docket No. ER00-516-000]

    Take notice that on November 8, 1999, Portland General Electric 
Company (PGE), tendered for filing under PGE's Final Rule pro forma 
tariff (FERC Electric Tariff First Revised Volume No. 8, Docket No. 
OA96-137-000), executed Service Agreements for Short-Term Firm and Non-
Firm Point-to-Point Transmission Service with PG&E Energy Trading-
Power, LP.
    Pursuant to 18 CFR Section 35.11, and the Commission's Order in 
Docket No. PL93-2-002 issued July 30, 1993, PGE respectfully requests 
that the Commission grant a waiver of the notice requirements of 18 CFR 
Section 35.3 to allow the Service Agreement to become effective October 
22, 1999.
    A copy of this filing was caused to be served upon PG&E Energy 
Trading-Power, LP, as noted in the filing letter.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

16. St. Joseph Light & Power Company

[Docket No. ER00-517-000]

    Take notice that on November 8, 1999, St. Joseph Light & Power Co., 
(SJLP), tendered for filing eight executed agreements for transmission 
service under its Open Access Transmission Tariff. The eight agreements 
consist of two agreements for each of four customers, one for firm 
point-to-point service and one for non-firm point-to-point service. The 
four customers are The Energy Authority, Inc.; Energy Transfer Group, 
L.L.C.; NewEnergy, Inc.; and TransAlta Energy Marketing (U.S.) Inc. 
Also included in this filing is the Third Revised Sheet No. 72, to 
Tariff No.1 which is the Index of SJLP's point-to-point transmission 
service customers.
    Copies of the filing were served on each of these four companies.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

17. Ameren Services Company

[Docket No. ER00-518-000]

    Take notice that on November 8, 1999, Ameren Services Company 
(ASC), tendered for filing a Service Agreement for Firm Point-to-Point 
Transmission Services between ASC and Omaha Public Power District 
(Omaha). ASC asserts that the purpose of the Agreement is to permit ASC 
to provide transmission service to Omaha pursuant to Ameren's Open 
Access Transmission Tariff filed in Docket No. ER 96-677-004.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

18. Ameren Services Company

[Docket No. ER00-519-000]

    Take notice that on November 8, 1999, Ameren Services Company 
(ASC), tendered for filing a Service Agreement for Non-Firm Point-to-
Point Transmission Service between ASC and Omaha Public Power District 
(Omaha). ASC asserts that the purpose of the Agreement is to permit ASC 
to provide transmission service to Omaha pursuant to Ameren's Open 
Access Transmission Tariff filed in Docket No. ER96-677-004.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

19. FirstEnergy Corp., and Pennsylvania Power Company

[Docket No. ER00-520-000]

    Take notice that on November 8, 1999, FirstEnergy Corp., tendered 
for filing on behalf of itself and Pennsylvania Power Company, a 
Service Agreement for Network Integration Service and an Operating 
Agreement for the Network Integration Transmission Service under the 
Pennsylvania Electric Choice Program with Utility.com, Inc. pursuant to 
the FirstEnergy System Open Access Tariff. These agreements will enable 
the parties to obtain Network Integration Service under the 
Pennsylvania Electric Choice Program in accordance with the terms of 
the Tariff.
    The proposed effective date under these agreements is November 1, 
1999.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

20. Allegheny Power Service Corporation, on behalf of Monongahela 
Power Company, The Potomac Edison Company, and West Penn Power 
Company, (Allegheny Power)

[Docket No. ER00-521-000]

    Take notice that on November 8, 1999, Allegheny Power Service 
Corporation on behalf of Monongahela Power Company, The Potomac Edison 
Company and West Penn Power Company (Allegheny Power), tendered for 
filing Supplement Nos. 64, 65 and 66 to add West Penn Power d/b/a 
Allegheny Energy to Allegheny Power Open Access Transmission Service 
Tariff which has been accepted for filing by the Federal Energy 
Regulatory Commission.
    The proposed effective date under each Service Agreement is 
December 1, 1999.
    Copies of the filing have been provided to the Public Utilities 
Commission of Ohio, the Pennsylvania Public Utility Commission, the 
Maryland Public Service Commission, the Virginia State Corporation 
Commission, the West Virginia Public Service Commission.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

21. Alliant Energy Corporate Services, Inc.

[Docket No. ER00-523-000]

    Take notice that on November 8, 1999, Alliant Energy Corporate 
Services, Inc., tendered for filing executed Service Agreements for 
short-term firm point-to-point transmission service and non-firm point-
to-point transmission service, establishing Delmarva Power & Light 
Company as a point-to-point Transmission Customer under the terms of 
the Alliant Energy Corporate Services, Inc., transmission tariff.
    Alliant Energy Corporate Services, Inc., requests an effective date 
of October 22, 1999, and accordingly, seeks waiver of the Commission's 
notice requirements.
    A copy of this filing has been served upon the Illinois Commerce 
Commission, the Minnesota Public Utilities Commission, the Iowa 
Department of Commerce, and the Public Service Commission of Wisconsin.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

[[Page 66629]]

22. Niagara Mohawk Power Corporation

[Docket No. ER00-524-000]

    Take notice that on November 8, 1999, Niagara Mohawk Power 
Corporation (Niagara Mohawk), tendered for filing notice that effective 
upon the start date of the New York Independent System Operator 
(NYISO), the portion of Rate Schedule FERC No. 33, effective date 
December 12, 1983, and any supplements thereto, and filed with the 
Federal Energy Regulatory Commission by Niagara Mohawk that pertain to 
397 MW of capacity from Moses 17-18 and the Niagara Plant to Niagara 
Mohawk's Edic substation is to be canceled. The balance of Rate 
Schedule FERC No. 33 is unaffected by this cancellation.
    Notice of the proposed cancellation has been served upon Power 
Authority of the State of New York.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

23. Rochester Gas and Electric Corporation

[Docket No. ER00-525-000]

    Take notice that on November 8, 1999, Rochester Gas and Electric 
Corporation (RG&E), tendered for filing with the Federal Energy 
Regulatory Commission (Commission) a Service Agreement between RG&E and 
TXU Energy Services (Transmission Customer) for service under RG&E's 
open access transmission tariff. Specifically dealing with the Retail 
Access Program under RG&E's open access transmission tariff.
    RG&E requests waiver of the Commission's notice requirements for 
good cause shown and an effective date of November 1, 1999, for the TXU 
Energy Services Service Agreement.
    A copy of this Service Agreement has been served on the 
Transmission Customer and the New York Public Service Commission.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

24. Rochester Gas and Electric Corporation

[Docket No. ER00-526-000]

    Take notice that on November 8, 1999, Rochester Gas and Electric 
Corporation (RG&E), tendered for filing with the Federal Energy 
Regulatory Commission (Commission) a Service Agreement between RG&E and 
North American Energy, Inc., (Transmission Customer) for service under 
RG&E's open access transmission tariff. Specifically dealing with the 
Retail Access Program under RG&E's open access transmission tariff.
    RG&E requests waiver of the Commission's notice requirements for 
good cause shown and an effective date of November 1, 1999, for the 
North American Energy, Inc., Service Agreement
    A copy of this Service Agreement has been served on the 
Transmission Customer and the New York Public Service Commission.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

25. Rochester Gas and Electric Corporation

[Docket No. ER00-527-000]

    Take notice that on November 8, 1999, Rochester Gas and Electric 
Corporation (RG&E), tendered for filing with the Federal Energy 
Regulatory Commission (Commission) a Service Agreement between RG&E and 
Monroe County (Transmission Customer) for service under RG&E's open 
access transmission tariff. Specifically dealing with the Retail Access 
Program under RG&E's open access transmission tariff.
    RG&E requests waiver of the Commission's notice requirements for 
good cause shown and an effective date of November 1, 1999, for the 
Monroe County Service Agreement
    A copy of this Service Agreement has been served on the 
Transmission Customer and the New York Public Service Commission.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

26. Rochester Gas and Electric Corporation

[Docket No. ER00-529-000]

    Take notice that on November 8, 1999, Rochester Gas and Electric 
Corporation (RG&E), tendered for filing with the Federal Energy 
Regulatory Commission (Commission) a Service Agreement between RG&E and 
Energetix, Inc., (Transmission Customer) for service under RG&E's open 
access transmission tariff. Specifically dealing with the Retail Access 
Program under RG&E's open access transmission tariff.
    RG&E requests waiver of the Commission's notice requirements for 
good cause shown and an effective date of November 1, 1999, for the 
Energetix, Inc., Service Agreement
    A copy of this Service Agreement has been served on the 
Transmission Customer and the New York Public Service Commission.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

27. New England Power Pool

[Docket No. ER00-530-000]

    Take notice that on November 8, 1999, the New England Power Pool 
(NEPOOL), Participants Committee tendered for filing the Forty-Seventh 
Agreement Amending the New England Power Pool Agreement (the Forty-
Seventh Agreement) which modifies prospectively how capital 
expenditures and capitalized project costs of the ISO New England Inc., 
incurred on or after January 1, 2000 are to be allocated among and paid 
by the Participants.
    The NEPOOL Participants Committee states that copies of these 
materials were sent to the New England state governors and regulatory 
commissions and the NEPOOL Participants.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

28. Duquesne Light Company

[Docket No. ER00-532-000]

    Take notice that November 8, 1999, Duquesne Light Company (DLC), 
tendered for filing a Service Agreement dated November 5, 1999 with 
FirstEnergy Trading Services, Inc., under DLC's Open Access 
Transmission Tariff (Tariff). The Service Agreement adds FirstEnergy 
Trading Services, Inc., as a customer under the Tariff.
    DLC requests an effective date of November 5, 1999, for the Service 
Agreement.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

29. Duquesne Light Company

[Docket No. ER00-533-000]

    Take notice that on November 8, 1999, Duquesne Light Company (DLC), 
tendered for filing a Service Agreement for Network Integration 
Transmission Service and a Network Operating Agreement for Transmission 
Service dated November 1, 1999 with Allegheny Power Service under DLC's 
Open Access Transmission Tariff (Tariff). The Service Agreement and 
Network Operating Agreement adds Allegheny Power Service as a customer 
under the Tariff.
    DLC requests an effective date of November 1, 1999, for the Service 
Agreement.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

[[Page 66630]]

30. Duquesne Light Company

[Docket No. ER00-535-000]

    Take notice that on November 8, 1999, Duquesne Light Company (DLC), 
tendered for filing a Non-Firm Point-to-Point Service Agreement dated 
November 5, 1999 with TXU Energy Trading Company under DLC's Open 
Access Transmission Tariff (Tariff). The Service Agreement adds TXU 
Energy Trading Company as a customer under the Tariff.
    DLC requests an effective date of November 5, 1999, for the Service 
Agreement.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

31. McDonough Power Cooperative

[Docket No. ER00-537-000]

    Take notice that on November 9, 1999, McDonough Power Cooperative 
(McDonough), tendered for filing its Agreement between McDonough Power 
Cooperative and Central Illinois Public Service Company (CIPS 
Agreement) pursuant to Sec. 205 of the Federal Power Act (FPA), 16 
U.S.C. Sec. 824d, and Sec. 35.12 of the Regulations of the Federal 
Energy Regulatory Commission (Commission), 18 CFR 35.12.
    McDonough requests that the Commission accept the agreements with 
an effective date of November 18, 1999.
    McDonough's filing is available for public inspection at its 
offices in Macomb, Illinois.
    Comment date: November 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

32. Alliant Energy Corporate Services, Inc.

[Docket No. ER00-538-000]

    Take notice that on November 9, 1999, Alliant Energy Corporate 
Services, Inc., tendered for filing executed Service Agreements for 
short-term firm point-to-point transmission service and non-firm point-
to-point transmission service, establishing Conectiv Energy Supply, 
Inc., as a point-to-point Transmission Customer under the terms of the 
Alliant Energy Corporate Services, Inc., transmission tariff.
    Alliant Energy Corporate Services, Inc. requests an effective date 
of October 22, 1999, and accordingly, seeks waiver of the Commission's 
notice requirements.
    A copy of this filing has been served upon the Illinois Commerce 
Commission, the Minnesota Public Utilities Commission, the Iowa 
Department of Commerce, and the Public Service Commission of Wisconsin.
    Comment date: November 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

33. Minnesota Power, Inc.

[Docket No. ER00-539-000]

    Take notice that on November 9, 1999, Minnesota Power, Inc., 
tendered for filing a signed Service Agreement with UtiliCorp United 
Inc., and with OGE Energy Resources, Inc., under its market-based 
Wholesale Coordination Sales Tariff (WCS-2) to satisfy its filing 
requirements under this tariff.
    Comment date: November 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

34. Niagara Mohawk Power Corporation

[Docket No. ER00-501-000]

    Take notice that on November 5, 1999, Niagara Mohawk Power 
Corporation (Niagara Mohawk), tendered for filing with the Federal 
Energy Regulatory Commission an executed Transmission Service Agreement 
between Niagara Mohawk and Sithe Power Marketing, Inc. This 
Transmission Service Agreement specifies that Sithe Power Marketing, 
Inc., has signed on to and has agreed to the terms and conditions of 
Niagara Mohawk's Open Access Transmission Tariff as filed in Docket No. 
OA96-194-000. This Tariff, filed with FERC on July 9, 1996, will allow 
Niagara Mohawk and Sithe Power Marketing, Inc., to enter into 
separately scheduled transactions under which Niagara Mohawk will 
provide non-firm transmission service for Sithe Power Marketing, Inc., 
as the parties may mutually agree.
    Niagara Mohawk requests an effective date of November 2, 1999. 
Niagara Mohawk has requested waiver of the notice requirements for good 
cause shown.
    Niagara Mohawk has served copies of the filing upon the New York 
State Public Service Commission and Sithe Power Marketing, Inc.
    Comment date: November 26, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

35. Cinergy Services, Inc.

[Docket No. ER00-540-000]

    Take notice that on November 9, 1999, Cinergy Services, Inc. 
(Cinergy), tendered for filing a Non-Firm Point-To-Point Service 
Agreement under Cinergy's Open Access Transmission Service Tariff (the 
Tariff) entered into between Cinergy and Edison Mission Marketing & 
Trading, Inc., (Western).
    Cinergy and Western are requesting an effective date of October 9, 
1999.
    Comment date: November 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

36. Baltimore Gas and Electric Company; Constellation Power Source, 
Inc.

[Docket Nos. ER99-2948-001 and ER97-2261-013]

    Take notice that on November 12, 1999, Baltimore Gas and Electric 
Company and its affiliate, Constellation Power Source, Inc., tendered 
for filing notification of a change in status to reflect certain 
departures from the facts the Commission relied upon in granting 
market-based rate authority.
    Comment date: December 2, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

37. Pittsfield Generating Company, L.P.

[Docket No. ER00-496-000]

    Take notice that on November 4, 1999, Pittsfield Generating 
Company, L.P. filed their quarterly report for the quarter ending 
September 30, 1999.
    Comment date: November 29, 1999, in accordance with Standard 
Paragraph E at the end of this notice.

Standard Paragraphs

    E. Any person desiring to be heard or to protest such filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). All such motions 
or protests should be filed on or before the comment date. Protests 
will be considered by the Commission in determining the appropriate 
action to be taken, but will not serve to make protestants parties to 
the proceeding. Any person wishing to become a party must file a motion 
to intervene. Copies of these filings are on file with the Commission 
and are available for public inspection. This filing may also be viewed 
on the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-
208-2222 for assistance).
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-30839 Filed 11-26-99; 8:45 am]
BILLING CODE 6717-01-P