[Federal Register Volume 64, Number 209 (Friday, October 29, 1999)] [Notices] [Page 58390] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 99-28325] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP00-11-00] Tennessee Gas Pipeline Company; Notice or Request Under Blanket Authorization October 25, 1999. Take notice that on October 20, 1999, Tennessee Gas Pipeline (Tennessee), a Delaware Corporation, Post Office Box 2511, Houston, Texas 77252, filed a request with the Commission in Docket No. CP00-11- 000, pursuant to Sections 157.205 and 157.208(f)(2) of the Commission's Regulations under the Natural Gas Act (NGA) for authorization to increase the maximum allowable operating pressure (MAOP) through an uprate of Tennessee's Grand Cheniere-N.W. Chalkey Line also designated as Line 507A-800 (Line 807A-800) and a delivery meter designated as Meter No. 02-0484 located in Calcasieu Parish, Louisiana, authorized in blanket certificate issued in Docket No. CP82-413-000, all as more fully set forth in the request on file with the Commission and open to public inspection. This filing may be viewed on the web at http:// www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance). Tennessee proposes to increase the MAOP of Line 507A-800 from 800 p.s.i.g. to 999 p.s.i.g. Tennessee wishes to uprate Line 507A-800 and Meter No. 02-0484 in order to increase the operational efficiency of the lateral and to eliminate the manual efforts required to operate the lateral. Line 507A-800 is a lateral that consists of approximately 2.2 miles of six-inch diameter pipe. The lateral is used only to provide natural gas deliveries to a single agricultural end-user in Calcasieu Parish, Louisiana. Line 507A-800 is connected to Tennessee's mainline 507A-100 which operates at 999 p.s.i.g. To provide service to the delivery tap on the lateral, Meter No. 02-0484, Tennessee personnel must manually bleed gas into Line 507A-800 from Line 507A-100. Once Line 507A-800 and Meter No. 02-0484 are uprated to 999 p.s.i.g., the manual monitoring can be eliminated. The estimated cost of this uprate is $15,000. Any person or the Commission's staff may, within 45 days after the Commission has issued this notice, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the allowed time, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. David P. Boergers, Secretary. [FR Doc. 99-28325 Filed 10-28-99; 8:45 am] BILLING CODE 6717-01-M