[Federal Register Volume 64, Number 190 (Friday, October 1, 1999)]
[Notices]
[Pages 53379-53380]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-25631]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6246-6]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or (202) 564-7153.
Weekly receipt of Environmental Impact Statements
Filed September 20, 1999 Through September 24, 1999 Pursuant to 40 CFR 
1506.9.
EIS No. 990335, Final EIS, COE, AZ, Alamo Lake Reoperation and 
Ecosystem Restoration Feasibility Study, Implementation, Reoperation of 
Alma Dam on the Bill Williams River, La Paz and Mohave Counties, AZ, 
Due: November 01, 1999, Contact: Timothy Smith (213) 452-3854.
EIS No. 990336, Final EIS, NRS, HI, Lower Hamakua Ditch Watershed Plan, 
To Provide a Stable and Affordable Supply of Agricultural Water to 
Farmers and Other, COE Section 404 Permit, Watershed Protection and 
Flood Prevention, Hawaii County, HI, Due: November 01, 1999, Contact: 
Kenneth Kaneshiro (808) 541-2600.
EIS No. 990337, Draft EIS, IBR, NM, Elephant Butte and Caballo 
Reservoirs, Resource Management Plan (RMP), Implementation, Sierra and 
Socorro Counties, NM, Due: November 23, 1999, Contact: Clay McDermeit 
(505) 248-5391.
EIS No. 990338, Final EIS, IBR, CA, Contra Loma Reservoir Project, 
Future Use and Operation of Contra Costa Water District, COE Section 
404 Permit, Contra Costa County, CA, Due: November 01, 1999, Contact: 
Bob Eckart (916) 978-5051.
EIS No. 990339, Final EIS, AFS, OR, Mill Creek Watershed Timber Sales 
Project, Implementation, Ochoco National Forest, Crook County. OR, Due: 
November 01, 1999, Contact: Dave Owens (541) 416-6425.
EIS No. 990340, Draft EIS, NPS, ID, MT, WY, Yellowstone and Grand Teton 
National Parks and John D. Rockefeller, Jr. Memorial Parkway Winter Use 
Plan, Implementation, Fremont County, ID, Gallatin and Park Counties, 
MT and Park and Teton Counties, WY, Due: November 15, 1999, Contact: 
Clifford Hawkes (303) 969-2262.
EIS No. 990341, Final EIS, FHW, MS, Airport Parking/Mississippi 25 
Connectors, Construction at Intersection of High Street/ Interstate 55 
(I-55) in the City of Jackson, Hinds and Rankin Counties, MS, Due: 
November 01, 1999, Contact: Cecil W. Vick, Jr. (601) 965-4217.
EIS No. 990342, Final EIS, FHW, MN, Phalen Boulevard Project, 
Construction of a new 4.3 Kilometer Roadway, from I35E to Johnson 
Parkway, Funding, in the City of St. Paul, Ramsey County, MN, Due: 
November 01, 1999, Contact: Bill Lohr (651) 291-6100.
EIS No. 990343, Final EIS, AFS, ID, Long Prong Project, Timber 
Harvesting, Road Construction and Reconstruction, Boise National 
Forest, Cascade Ranger District, Valley County, ID, Due: November 01, 
1999,

[[Page 53380]]

Contact: David D. Rittenhouse (208) 373-4100.
EIS No. 990344, Final EIS, BLM, WY, Wyodak Coal Bed Methane Project, 
Implementation of Road Construction, Drilling Operation, Electrical 
Distribution Line, Powder River Basin, Campbell and Converse Counties, 
WY, Due: November 01, 1999, Contact: Richard Zander (307) 684-1161.
EIS No. 990345, Draft EIS, DOD, AK, ND, AS, National Missile Defense 
(NMD) Deployment System, Selection of Possible Deployment Sites: AK, AS 
and ND, Due: November 15, 1999, Contact: Julia Hudson (256) 955-4822.
EIS No. 990346, Final EIS, DOE, WA, Hanford Remedial Action, Revised 
and New Alternatives, Comprehensive Land Use Plan, Hanford Site lies in 
the Pasco Basin of the Columbia Plateau, WA, Due: November 01, 1999, 
Contact: Thomas W. Ferns (509) 376-4360.
EIS No. 990347, Draft EIS, SFW, CA, San Joaquin County Multi-Species 
Habitat Conservation and Open Space Plan, Issuance of Incidental Take 
Permit, San Joaquin County, CA, Due: November 15, 1999, Contact: Ben 
Harrison (503) 231-2068.
EIS No. 990348, Draft EIS, COE, NY, NJ, New York and New Jersey Harbor 
Navigation Study, Identify, Screen and Select Navigation Channel 
Improvements, NY and NJ, Due: November 15, 1999, Contact: Jenine Gallo 
(212) 264-0912.

Amended Notices

EIS No. 990163, Draft EIS, BLM, CA, Soledad Canyon Sand and Gravel 
Mining Project, Proposal to Mine, Produce and Sell, ``Split Estate'' 
Private Owned and Federally Owned Lands, Transit Mixed Concrete, Los 
Angeles County, CA, Due: January 03, 2000, Contact: Ms Elena Misquez 
(760) 251-4804.
    Published FR 05-21-99--Review Period Reestablished.
EIS No. 990266, Draft EIS, AFS, WY, Squirrel Meadows--Grand Targhee 
Land Exchange Proposal, Implementation, Targhee National Forest, Teton 
County, WY, Due: October 20, 1999, Contact: Patty Bates (208) 354-2312.
    Published FR 08-06-99--Review Period extended. from 09-20-99 to 10-
20-99.

    Dated: September 28, 1999.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 99-25631 Filed 9-30-99 8:45 pm]
BILLING CODE 6560-50-U