[Federal Register Volume 64, Number 152 (Monday, August 9, 1999)]
[Proposed Rules]
[Pages 43129-43132]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-20199]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 300
[FRL-6413-6]
National Oil and Hazardous Substances Pollution Contingency Plan;
National Priorities List
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice of intent to delete the Smuggler Mountain Superfund site
from the National Priorities List; request for comments.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency, Region 8 announces its
intent to delete the Smuggler Mountain Superfund Site (Site) from the
National Priorities List (NPL) and requests public comment on this
proposed action. The NPL constitutes appendix B of 40 CFR part 300
which is the National Oil and Hazardous Substances Pollution
Contingency Plan (NCP), which EPA promulgated pursuant to section 105
of the Comprehensive Environmental Response, Compensation, and
Liability Act (CERCLA) of 1980, as amended. EPA and the State of
Colorado (State) have determined that the Site as remediated poses no
significant threat to public health or the environment and, therefore,
further remedial measures pursuant to CERCLA are not appropriate.
DATES: Comments concerning this Site may be submitted on or before
September 8, 1999.
ADDRESSES: Comments may be mailed to: Armando Saenz, Remedial Project
Manager, U.S. Environmental Protection Agency, Region 8, 999 18th
Street, Suite 500, Mail Stop EPR-SR, Denver, Colorado 80202-2466.
Comprehensive information on this Site is available through the public
docket which is available for viewing at the Smuggler Mountain
Superfund Site information repositories at the following locations:
Superfund Records Center, U.S. Environmental Protection Agency, Region
8, 999 18th Street, 5th Floor, Denver, Colorado 80202-2466, (303) 312-
6473. Hours of operation are 8:00 AM to 4:30 PM.
Aspen/Pitkin Environmental Health Department, 130 S. Galena Street,
Aspen, Colorado 81611, (970) 920-5070. Hours of operation are 8 AM to 5
PM.
FOR FURTHER INFORMATION CONTACT: Armando Saenz, Remedial Project
Manager, U.S. Environmental Protection Agency, Region 8, 999 18th
Street, Suite 500, Mail Stop EPR-SR, Denver, Colorado 80202-2466, (303)
312-6559.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Introduction
II. NPL Deletion Criteria
III. Deletion Procedures
IV. Basis for Intended Site Deletion
V. Summary
I. Introduction
The Environmental Protection Agency (EPA), Region 8 announces its
intent to delete the Smuggler Mountain Superfund Site (Site) located in
Aspen, Colorado from the National Priorities List (NPL), appendix B of
the National Oil and Hazardous Substances Pollution Contingency Plan
(NCP), 40 CFR part 300, and requests comments on this deletion. EPA
identifies sites that appear to present a significant risk to public
health, welfare, or the environment and maintains the NPL as a list of
these sites. As described in Sec. 300.425(e)(3) of the NCP, sites
deleted from the NPL remain eligible for remedial actions in the
unlikely event that conditions at the site warrant such action.
EPA will accept comments on this proposed deletion for thirty days
following publication of this document in the Federal Register.
Section II of this document explains the criteria for deleting
sites from the NPL. Section III discusses procedures that EPA is using
for this action. Section IV discusses the Smuggler Mountain Superfund
Site and explains how the Site meets the deletion criteria. Section V
summarizes this document.
II. NPL Deletion Criteria
Section 300.425(e) of the NCP provides that releases may be deleted
from the NPL where no further response is appropriate. In making a
determination to delete a release from the NPL, EPA shall consider, in
consultation with the state, whether any of the following criteria have
been met:
(i) Responsible parties or other parties have implemented all
appropriate response actions required;
(ii) All appropriate Fund-financed responses under CERCLA have been
implemented, and no further action by responsible parties is
appropriate; or
(iii) The remedial investigation has shown that the release poses
no significant threat to public health or the environment and,
therefore, taking remedial measures is not appropriate.
Even if a site is deleted from the NPL, where hazardous substances,
pollutants, or contaminants remain at the site above levels that allow
for unlimited use and unrestricted exposure, EPA will conduct a five-
year review of the site five years after the initiation of the remedial
action to ensure that the site remains protective of public health and
the environment. A statutory five-year review was completed at this
site on November 11, 1997. In the case of this Site, the selected
remedy is protective of human health and the environment. A subsequent
five-year review will be completed prior to November 11, 2002. If new
information becomes available which indicates a need for further
action, EPA may initiate remedial actions. Whenever there is a
significant release from a site deleted from the NPL, the site may be
restored to the NPL without the application of the Hazard Ranking
System.
III. Deletion Procedures
The following procedures were used for the intended deletion of
this Site: (1) EPA Region 8 has recommended deletion of the Smuggler
Site and has prepared the relevant documents; (2) The State of Colorado
has concurred with EPA's intent to delete the Smuggler Site; (3)
Concurrent with this Notice of Intent to Delete, a notice has been
published in local newspapers and has been distributed to appropriate
Federal, State and local officials, and other interested parties
announcing the commencement of a 30-day public comment period on EPA's
Notice of Intent to Delete; and, (4) The Region has made all relevant
documents available in the Regional Office and local Site information
repositories.
Deletion of the Site from the NPL does not in itself create, alter,
or revoke any
[[Page 43130]]
individual's rights or obligations. The NPL is designed primarily for
informational purposes and to assist Agency management. As mentioned in
section II of this document, Sec. 300.425(e)(3) of the NCP states that
the deletion of a Site from the NPL does not preclude eligibility for
future response actions should future Site conditions warrant such
action.
Prior to deletion of this Site, EPA's Regional Office will accept
and evaluate public comments on EPA's Notice of Intent to Delete before
making a final decision to delete. If necessary, the Agency will
prepare a Responsiveness Summary to address any significant comments
received.
A deletion occurs when the Regional Administrator places a final
notice in the Federal Register. Generally, the NPL will reflect
deletions in the final update following the notice.
IV. Basis for Intended Site Deletion
The following summary provides EPA's rationale for recommending
deletion of the Smuggler Mountain Superfund Site.
A. Site Background
The Smuggler Mountain Superfund Site is located in northeastern
Aspen, Pitkin County, Colorado. It is in the Roaring Fork River valley,
on the southwestern flank of Smuggler Mountain. The Site is largely
developed, containing large and small condominiums, mobile home parks,
a tennis club and numerous single family residences. The Site was
placed on the National Priorities List (NPL) on June 10, 1986 (51 FR
21073).
Soil analyses in the early 1980's, conducted first by residents and
later by EPA and the Potentially Responsible Parties (PRP's),
identified concentrations of lead as high as 46,000 parts per million
(ppm), well above EPA's cleanup level of 1,000 ppm. Elevated levels of
cadmium were also found in the soils of the site. The sources of the
lead and cadmium are the waste rock and tailings (mine wastes) from the
mines on Smuggler Mountain. These wastes are exposed, covered or mixed
with native soils across the site.
The Site has been divided into two study areas or Operable Units
(OUs)--OU1 and OU2. OU1 is mainly a residential area on the
northeastern edge of the town of Aspen and covers approximately 300
acres. OU2 includes the mine site on the upward slope of Smuggler
Mountain just north of OU1 and covers approximately 25 acres.
Three mine waste dumps, containing an estimated 22,000 cubic yards
of mine wastes, are located on the mine site. Potential future mining
activities at OU 2 are expected to produce as much as 2,100 cubic yards
of additional waste rock per year. These wastes will be placed on the
existing dumps. The mine site dumps can accommodate the projected
quantities of waste for the projected life of the mine without
significantly changing the character of the dumps.
B. Early Actions Performed
A number of investigations have been undertaken at the site. An EPA
Field Investigation Team sampled the site in 1983. This study was the
result of a request by Pitkin County to characterize any human or
environmental threat posed by abandoned mine tailings in the northeast
quarter of the Aspen townsite.
Another study was sponsored by Western Slope Development Company on
behalf of the Hunter Creek Condominiums, and a plan for surface
covering and revegetation was developed for the areas surrounding the
development (1985). Similar studies were conducted by other condominium
developments in the area. In July 1985, discussions were held between a
number of potentially responsible parties and EPA resulting in a
Remedial Investigation/Feasibility Study (RI/FS). The RI/FS was
conducted by Fred C. Hart Associates, Inc.
C. Remedial Investigation/Feasibility Study (RI/FS)
The RI/FS Report was finished and released in March 1986.
Environmental protection goals and remedial objectives used to analyze
potential remedial alternatives called for an isolation of the source
of the contamination (lead in mine wastes) to prevent direct contact
and the distribution of windblown dusts. The recommended remedial
action from the selection of two alternatives was surface sealing
(capping) and grading. An RI/FS Addendum for OU 2 was issued on May 7,
1986, to characterize the nature and extent of contamination and
determine the appropriate extent of remedy at the Smuggler-Durant Mine
Site.
The contaminants of concern at the Smuggler site are primarily lead
and cadmium in soils. Lead and cadmium are hazardous substances within
the meaning of CERCLA section 101(14), 42 U.S.C. 9604(14). Potential
and/or actual routes of exposure are direct ingestion of contaminated
soils and inhalation of wind blown dust.
There are no surface water sources on or flowing through the area.
Nor are there any significant gullies entering or leaving the area.
Thus, there is little opportunity for exposure to potentially
contaminated runoff. Additionally, there are no known threatened or
endangered wildlife or plant species inhabiting the site.
D. ROD & ESD Findings & Cleanup Activities Performed
In September 1986, a Record of Decision (ROD) was issued that
divided the Site into two OUs. The OU 1 remedy was modified by several
Explanations of Significant Differences (ESDs), the last of which was
dated June, 1993. OU 1 is mostly residential. The remedy selected in
the ROD was solely for OU 1, but OU 2 was briefly discussed. The mine
site (OU 2) is not developed for residential use, but does include the
Smuggler Mine on Smuggler Mountain. OU 2 is an ongoing mining operation
and operations are expected to continue for the next 25-30 years and
perhaps indefinitely. The remedy selection for OU 2 was documented in
an Action Memorandum.
Operable Unit 1. During the OU1 Remedial Design (RD), additional
technical information showed that the OU 1 remedy was not implementable
due to the unexpectedly high volume of soils. The ROD was modified in
the March 1989 ESD. This ESD described a plan to remove the top two
feet of soils containing more than 1,000 ppm lead in the residential
areas, an additional on-site repository for the extra volume of soil,
and institutional controls to ensure the permanence of the remedy.
However, the Aspen community found this remedy unacceptable and the
plan was put on hold pending further investigation.
The Aspen community submitted an alternative proposal to EPA which
resulted in a second ESD issued in May 1990. The May 1990 ESD included
a greater reliance on Institutional Controls (ICs) and removal of 6
inches of contaminated soil in the Hunter Creek and Centennial
Condominium areas. For individual properties, the protective cover of
clean soil, placed over contaminated areas, would be reduced from two
feet to a geotextile liner overlain with one foot of clean soil. Pitkin
County adopted ICs in May, 1991, but they were repealed based upon
citizen concerns about the need for any remedy at all.
EPA issued a Minor Modification to the remedy in October of 1991
that recognized that landowners could implement land use controls
rather than local government. The modification provided for
implementation of ICs by the adoption and enforcement of local
ordinances by Pitkin County or the City of Aspen, by compliance with
EPA approved Operation and Maintenance
[[Page 43131]]
plans by private parties or by the use of EPA's enforcement authority.
Some citizens contended that the cleanup, with heavy equipment and
dust, would be more hazardous than living with the health risk at the
Site. To address the community's concerns, an independent panel, called
a Technical Advisory Committee (TAC), was convened in October of 1992.
The TAC included six nationally recognized lead experts and three
technical advisors. It released a final report in January 1993. The
June 1993 ESD was based on the TAC report.
The June 1993 ESD modified the ROD and previous ESDs. The OU 1
actions were to be implemented through a Partial Consent Decree with
Pitkin County filed with the United States District Court for the
District of Colorado on March 24, 1995, for civil action No. 89-C-1802.
The final OU 1 remedy selected and ultimately implemented was: (1) The
Pitkin County Health Department agreed to a blood lead surveillance
program for young children and implemented an indoor dust sampling
program over a two year period; (2) The berm area was to be capped with
clean soil and revegetated. Other common-use areas of exposed mine
waste, including Mollie Gibson Park, were to be covered, revegetated
and monitored; (3) Vegetable gardens were required to be planted in at
least 12 inches of clean soil; and (4) The Aspen/Pitkin Environmental
Health Department was required to evaluate site construction projects
or land use changes to determine whether they present a threat of soil
exposure to young children.
The ESD also stated that groundwater monitoring would cease and
that a ground-water corrective action was not necessary. Site
conditions suggested that the groundwater contamination identified
earlier was due to the high natural metals content in the soils, or the
result of well materials and ultimately not a health threat.
EPA was also to make a final determination regarding remediation of
the OU 1 residential soils based on EPA's review of completed lead
speciation, bioavailability, and blood lead monitoring studies. Please
see the ``Monitoring Results'' section.
Operable Unit 2. An Engineering Evaluation/Cost Analysis (EE/CA)
was conducted for OU2 to determine the necessary removal actions. The
EE/CA was completed on January 25, 1995 and stated the following
removal objectives: abate the threat of direct contact with lead
contaminated soils and waste rock in mine waste dumps; abate the threat
of inhalation of contaminated dust; abate the threat of migration of
contamination via air and surface water; and attain applicable or
relevant and appropriate requirements (ARARS).
The removal actions, outlined in an Action Memorandum dated April
19, 1995, were eventually made part of an Administrative Order on
Consent with the mine owners in May 1995. An Action Memorandum was used
because of the simplicity of the response action. The removal action
selected in the OU2 Action Memorandum included the following: (1)
Regrading a part of mine dump #2 to drain back into the mountain; (2)
Cribbing the unstable, if any, portions of the toe of Dump #2. (This
has turned out to be unnecessary.); (3) Regrading the lower parking
area to drain back into the mountain; (4) Controlling dust emissions
from dirt roads and the parking area by periodic spraying of a
magnesium chloride dust suppressant solution; and (5) Extending the
existing fence to restrict entry to the lower portion of the mine site.
All of the work was completed by September 1996, except for the second
activity. The toe of Dump #2 was not unstable, therefore cribbing was
not necessary.
E. Protectiveness
Monitoring Results. Under the OU 1 June 1993 ESD, EPA was to make a
final determination regarding remediation of the OU 1 residential soils
based on EPA's review of completed lead speciation, bioavailability,
and blood lead monitoring studies. The results of the soil
bioavailability study may be found in the May 1996 preliminary report,
``Bioavailability Of Lead In Soil Samples From The Smuggler Mountain
NPL Site Aspen, Colorado.'' This study showed that bioavailability of
predominately lead carbonate was near the EPA default of 30% (absolute)
which further substantiated the need for a blood lead assessment to
help ascertain potential future risks.
In 1996, the Pitkin County Health Department's contractor, the
University of Cincinnati (UC), and EPA Region 8 designed a biological
and environmental sampling study to identify blood lead levels in
children associated with lead levels found in the children's play
environment. This biomonitoring study was recommended by the TAC and
included in the 1993 ESD. Children between the ages of 1 and 7 years
were identified who lived in the more contaminated yards, and venous
blood samples were obtained. At the same time the biological samples
were obtained, environmental samples were taken (indoor and exterior
dust, soil, water, and hand-wipes from the children).
To complete the requirement of identifying all pertinent facts
surrounding the demographic element for the study, a survey was created
to document all variables that might affect the results found in the
blood study. In other words, all major sources and factors that might
impact the blood lead levels found in the children were identified.
The schedule of events focused on obtaining the biological and
environmental samples in the late Summer and early Fall of 1996 (and
was partially repeated in the early Fall of 1997). This was done to
optimize the time when the children had been exposed to their outside
environment, and to maximize the level of lead they had obtained
throughout the summer.
The final report summarizing the results of the blood lead study
and incorporating data from previous studies was completed in October
1998. The report, titled ``Blood Lead Surveillance and Exposure of
Young Children to Elevated Soil Lead at the Smuggler Superfund Site,
Aspen, CO--Final Report,'' was prepared by UC.
Additional analyses of the study were conducted by EPA Region 8
toxicologist. These findings can be found in a report titled ``Further
Assessment of Risks from Exposure to Lead in Soils at the Smuggler
Superfund Site, Aspen, CO, Using a Weight of Evidence Approach,'' EPA
Region 8, Denver, CO, May 1999 (Gerry Henningsen, Region 8
Toxicologist).
Both reports conclude that children living on the Site are not at
unacceptable risk due to exposure to lead in the soil. Although
environmental lead levels are slightly elevated, and the EPA IEUBK
modeling indicates some potential risk to children who are in contact
with this lead, repeated screening of children shows no impact of this
exposure on blood lead levels of children at the Site. Consequently,
EPA has concluded that further remediation of the OU 1 soils is not
needed to adequately protect human health.
O&M Assurances. The OU 1 Operations and Maintenance Plan (O&M Plan)
is represented in its entirety by the Institutional Controls (ICs)
enacted for OU1 under the Consent Decree. After the signing of the
Consent Decree, Pitkin County proposed amendments to the Pitkin County
Code to enact ICs (Land Use Restrictions) for the Site. These ICs were
reviewed and approved by EPA and enacted by the City of Aspen and
Pitkin County to restrict the movement of contaminated soils in and
from the Site and to aid in preserving the
[[Page 43132]]
integrity of the remedy constructed at the Site.
With the OU 1 Consent Decree, The Aspen/Pitkin Environmental Health
Department has assured EPA and the State that all necessary ICs are in
full force and effect within the Site boundary. The Consent Decree also
includes reopeners in the event that the County were to repeal or
disregard these ordinances. A Five-year Review conducted by EPA and
completed on November 7, 1997, confirmed that these controls are in
force and that the program is working.
A recent amendment to the OU 2 AOC has provided EPA and the State
with indefinite O&M assurances. As stated in the AOC Amendment, the O&M
Plan, as defined by the EE/CA, Action Memorandum and original workplan,
will provide for maintenance of runoff control, dust control,
restricted site access and site reclamation measures. This O&M Plan
will become effective upon the termination of the permit with the
Colorado Mined Land Reclamation Board and will be implemented by the
PRP, Wright and Preusch Mining, LTD.
F. Community Relations
Community outreach at the Smuggler Mountain Superfund Site
included: timely information about the Superfund process, ongoing
communications, and opportunities for community participation in the
decision-making process for the Site remedy. Specific activities
included monitoring community concerns, preparation and mailing of fact
sheets, coordination of community meetings and providing communication
between EPA, the community and Pitkin County (and the other PRPs).
EPA's outreach efforts to meet community needs and interests resulted
in integral participation by the Aspen community and periodic
revision(s) to the Site remedy.
V. Summary
The responsible parties have implemented all appropriate response
actions required to sufficiently protect human health and the
environment. Reports on lead speciation, bioavailability, and blood
lead monitoring studies have concluded that children living on the Site
are not at unacceptable risk due to exposure to lead in the soil. Also,
this Site meets all the site completion requirements as specified in
Close Out Procedures for National Priorities List Sites (OSWER
Directive 9320.2-09). Further, O&M of the Site is assured via the OU 1
Consent Decree and the OU 2 AOC and AOC Amendment.
Because hazardous substances will remain at the site, EPA will
conduct periodic inspections of the site to ensure that the remedy
remains protective of human health and the environment. EPA is required
to conduct such reviews under section 121(c) of CERCLA and the NCP.
EPA, with the concurrence of the State of Colorado, has determined
that all appropriate response actions required by CERCLA at the
Smuggler Mountain Site have been completed, and that no further cleanup
by responsible parties is appropriate.
Dated: July 27, 1999.
Jack W. McGraw,
Acting Regional Administrator, Region 8.
[FR Doc. 99-20199 Filed 8-6-99; 8:45 am]