[Federal Register Volume 64, Number 139 (Wednesday, July 21, 1999)]
[Notices]
[Page 39124]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-18523]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 309-PA]
Sithe Piney LLC; Notice of Pennsylvania Electric Company's
Request to Use Alternative Procedures in Filing a License Application
July 15, 1999.
On June 24, 1999, the existing licensee, Pennsylvania Electric
Company (Penelec), filed a request to use alternative procedures for
submitting an application for new license for the existing Sithe Piney
Hydroelectric Project No. 309. The project is located on the Clarion
River, in Clarion County, Pennsylvania.
The project consists of: (1) the 427-foot-long and 139-foot-high
concrete arch dam with crest elevation of 1,075 ft. msl, an 84-foot-
long left non-overflow wall, and a 200-foot-long right non overflow
wall; (2) an 800-acre surface area reservoir; (3) an 84-foot-wide
integral intake; (4) three 230-foot-long; 14-foot-diameter penstocks;
(5) a powerhouse with 3 generating units totaling 28,300 kilowatts; (6)
a 250-foot-long tailrace; (7) 700-foot-long and 900-foot-long
transmission lines; and (8) appurtuenant facilities.
Penelec states that it has discussed the applicant prepared
environmental assessment process with the Pennsylvania Fish and Boat
Commission, Pennsylvania Department of Environmental Protection, and
U.S. Fish and Wildlife Service, and that those agencies have expressed
support for the use of alternative procedures. Penelec is developing a
draft communications protocol that will be distributed to the other
participants in the relicensing process.
The purpose of this notice is to invite any additional comments on
Penelec's request to use the alternative procedures, pursuant to
Section 4.34(i) of the Commission's regulations.\1\ Additional notices
seeking comments on the specific project proposal, interventions and
protests, and recommended terms and conditions will be issued at a
later date.
---------------------------------------------------------------------------
\1\ Order No. 596, Regulations for the Licensing of
Hydroelectric Projects, 81 FERC para.61,103 (1997).
---------------------------------------------------------------------------
The alternative procedures being requested here combine the
prefiling consultation process with the environmental review process,
allowing Penelec to complete and file an Environmental Assessment (EA)
in lieu of Exhibit E of the license application. This process differs
from the traditional way the applicant prepares a license application
because the prefiling consultation with agencies, Indian tribes, and
nongovernmental organizations (NGOs) is done concurrently with the
environmental review process rather than waiting for the Commission
staff to conduct its environmental review of the application after it
is filed with the Commission. The alternative procedures are intended
to simplify and expedite the licensing process by combining the
prefiling consultation and environmental review processes into a single
process, to facilitate greater participation, and to improve
communication and cooperation among the participants.
Applicant Prepared EA Process and Piney Project Schedule
Penelec has distributed an Information Package for the proposed
project to state and federal resource agencies, and NGOs. Penelec has
held an initial consultation meeting to discuss potential issues by the
participants, and is currently conducting studies. Penelec has
submitted a proposed schedule for the alternative licensing process
that leads to the filing of a license application by October 2000.
Comments
Interested parties have 30 days from the date of this notice to
file with the Commission, any comments on Penelec's proposal to use the
alternative procedures to file an application for the Piney
Hydroelectric Project.
Filing Requirements
The comments must be filed by providing an original and 8 copies as
required by the Commission's regulations to: Federal Energy Regulatory
Commission, Office of the Secretary, Dockets--Room 1A, 888 First
Street, NE, Washington, DC 20426.
All comment filing must bear the heading ``Comments on the
Alternative Procedures,'' and include the project name and number
(Piney Hydroelectric Project No. 309).
For further information on this process, please contact William
Guey-Lee of the Federal Energy Regulatory Commission at 202-219-2808 or
E-mail at [email protected].
David P. Boergers,
Secretary.
[FR Doc. 99-18523 Filed 7-20-99; 8:45 am]
BILLING CODE 6717-01-M