[Federal Register Volume 64, Number 98 (Friday, May 21, 1999)]
[Notices]
[Pages 27772-27776]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-12818]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. ER95-1240-003, et al.]


PacifiCorp, et al.; Electric Rate and Corporate Regulation 
Filings

May 11, 1999.
    Take notice that the following filings have been made with the 
Commission:

1. PacifiCorp

[Docket No. ER95-1240-003]

    Take notice that on May 4 1999, PacifiCorp, tendered for filing in 
accordance with 18 CFR 35 of the Commission's Rules and Regulations and 
the Commission's Order under FERC Docket No. ER95-1240-000, dated April 
21, 1999, an amended refund report.
    Copies of this filing were supplied to the Washington Utilities and 
Transportation Commission and the Public Utility Commission of Oregon.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

2. Duke Energy Moss Landing, LLC

[Docket No. ER98-2668-000]

    Take notice that on May 3, 1999, Duke Energy Moss Landing, LLC, 
tendered for filing an addendum to its April 30, 1999, filing in the 
above referenced docket.
    Comment date: May 21, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

[[Page 27773]]

3. Monmouth Energy, Inc.

[Docket No. ER99-1293-001]

    Take notice that on May 4, 1999, Monmouth Energy, Inc., tendered 
for filing its amended refund report in accordance with Commission 
Staff inquiry.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

4. New England Power Pool

[Docket No. ER99-2707-000]

    Take notice that on April 30, 1999, the New England Power Pool 
Executive Committee tendered for filing a signature page to the New 
England Power Pool (NEPOOL) Agreement dated September 1, 1971, as 
amended, signed by Penobscot Hydro, LLC (Penobscot). The NEPOOL 
Agreement has been designated NEPOOL FPC No. 2.
    The Executive Committee states that the Commission's acceptance of 
Penobscot's signature page would permit NEPOOL to expand its membership 
to include Penobscot. NEPOOL further states that the filed signature 
page does not change the NEPOOL Agreement in any manner, other than to 
make Penobscot a member in NEPOOL.
    NEPOOL requests an effective date of May 1, 1999, for commencement 
of participation in NEPOOL by Penobscot.
    Comment date: May 20, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

5. Duke Energy Trading and Marketing, L.L.C.

[Docket No. ER99-2774-000]

    Take notice that on May 3, 1999, Duke Energy Trading and Marketing, 
L.L.C. (DETM), tendered for filing a Notice of Succession with the 
Federal Energy Regulatory Commission indicating that the name of NP 
Energy Inc., has been changed to Duke Energy Trading and Marketing, 
L.L.C., effective March 31, 1999. In accordance with Sections 35.16 and 
131.51 of the Commission's regulations, 18 CFR 35.16, 131.51, DETM 
adopted and ratified all applicable rate schedules filed with the FERC 
by NP Energy Inc.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

6. Central Power and Light Company, West Texas Utilities Company, 
Public Service Company of Oklahoma and Southwestern Electric Power 
Company

[Docket No. ER99-2779-000]

    Take notice that on May 3, 1999, Central Power and Light Company, 
West Texas Utilities Company, Public Service Company of Oklahoma, and 
Southwestern Electric Power Company (collectively, the CSW Operating 
Companies) tendered for filing: (1) an amendment to the unexecuted 
Network Operating Agreement (NOA) between the CSW Operating Companies 
and Northeast Texas Electric Cooperative, Inc. (NTEC); and (2) an 
amendment to the unexecuted NOA between the CSW Operating Companies and 
East Texas Electric Cooperative, Inc., (ETEC). The originally filed 
unexecuted NOAs between the CSW Operating Companies ad NTEC and ETEC 
have been set for hearing in Docket Nos. ER99-1659-000 and ER99-1660-
000 (consolidated). See Central Power and Light Co., et al., 87 FERC 
para. 61,001 (1999).
    The amendments propose a new NOA Section 3.2. This provision 
specifies certain circumstances under which a network customer's 
network load may be curtailed.
    The CSW Operating Companies request an effective date of July 2, 
1999.
    The CSW Operating Companies state that a copy of this filing has 
been served on each person listed on the official service list in 
Docket Nos. ER99-1659-000 and ER99-1660-000 (consolidated).
    Comment date: May 21, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

7. Pacific Gas and Electric Company

[Docket No. ER99-2780-000]

    Take notice that on May 3, 1999, Pacific Gas and Electric Company 
(PG&E), tendered for filing as a supplement to PG&E Rate Schedule FERC 
No. 85, the Interconnection Agreement between PG&E and the City of 
Santa Clara, California (City or Santa Clara), a Letter Agreement 
between PG&E and Santa Clara retroactively adjusting the demand rates 
for the City for 1995 and 1996. The filing also includes a 1995 
decision by the California Public Utilities Commission (CPUC), Decision 
No. 95-05-043, and a calculation of the Diablo Canyon Demand True-Up 
plus interest for the years 1995 and 1996.
    Copies of this filing were served upon City and the CPUC.
    Comment date: May 21, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

8. San Diego Gas & Electric Company

[Docket No. ER99-2789-000]

    Take notice that on May 3, 1999, San Diego Gas & Electric Company 
(SDG&E), tendered for filing a Notice of Cancellation of Service 
Agreement Nos. 1 though 7, including Supplement No. 1 of FERC Electric 
Tariff Original Volume No. 5, by which SDG&E obtains wholesale 
distribution service under SDG&E's Open Access Distribution Tariff (the 
OADT) for its combustion turbines.
    SDG&E requests that these notices of cancellation be made effective 
on the date as of which completion of the transfer of title from SDG&E 
to Cabrillo Power II LLC (Cabrillo Power II)--the purchaser and new 
owner of these combustion turbines--takes place. The closing of this 
transfer of title currently is anticipated to occur on or about May 14, 
1999.
    Copies of this filing have been served upon the California Public 
Utilities Commission and Cabrillo Power II.
    Comment date: May 21, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

9. San Diego Gas & Electric Company

[Docket No. ER99-2790-000]

    Take notice that on May 3, 1999, San Diego Gas & Electric Company 
(SDG&E), tendered for filing executed Service Agreements between SDG&E 
and Cabrillo Power II LLC (Cabrillo Power II) for service under SDG&E 
Open Access Distribution Tariff (OATD). SDG&E states that it tenders 
the Service Agreements to assure that service under the OATD is 
available to Cabrillo Power II by the date on which Cabrillo Power 
takes title to SDG&E's combustion turbines located in SDG&E's service 
area, currently anticipated to occur on May 14, 1999.
    Copies of this filing have been served upon the California Public 
Utilities Commission and Cabrillo Power II.
    Comment date: May 21, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

10. Ogden Martin Systems of Union, Inc.

[Docket No. ER99-2791-000]

    Take notice that on May 4, 1999, Ogden Martin Systems of Union, 
Inc., tendered for filing with the Commission (1) the Power Purchase 
and Interconnection Agreement dated April 11, 1990 between Union County 
Utilities Authority (UCUA) and Public Service Electric and Gas Company 
(PSE&G); (2) an Amendment to the Power Purchase and Interconnection 
Agreement dated May 28, 1998 between UCUA and PSE&G; and (3) an 
Assignment and Assumption of Power Purchase and Interconnection 
Agreement dated July 22, 1998, between UCUA and Ogden Union.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

[[Page 27774]]

11. Archer Daniels Midland

[Docket No. ER99-2792-000]

    Take notice that on May 4, 1999, Archer Daniels Midland (ADM), of 
Decatur, Illinois tendered for filing with the Commission a Power 
Purchase Agreement with Central Illinois Light Company, under which ADM 
would sell energy to CILCO at market-based rates.
    ADM requested an effective date of June 1, 1999.
    Copies of the filing were served on the affected customer and the 
Illinois Commerce Commission.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

12. Central Maine Power Company

[Docket No. ER99-2793-000]

    Take notice that on May 4, 1999, Central Maine Power Company (CMP), 
tendered for filing a service agreement for Non-Firm Point-to-Point 
Transmission service entered into with HQ Energy Services (U.S.) Inc. 
Service will be provided pursuant to CMP's Open Access Transmission 
Tariff, designated rate schedule CMP--FERC Electric Tariff, Original 
Volume No. 3, as supplemented.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

13. Pacific Gas and Electric Company

[Docket No. ER99-2794-000]

    Take notice that on May 4, 1999, Pacific Gas and Electric Company 
(PG&E), tendered for filing Amendment No. 1 to the Interim Short Term 
Coordination Agreement between the Sacramento Municipal Utility 
District (SMUD) and PG&E (Agreement). Amendment No. 1, modifies certain 
terms and provisions of the Agreement and extends its term. The filing 
does not modify any rate levels.
    The Agreement and its appendices were originally accepted for 
filing by the Commission in FERC Docket No. ER98-4067-000 and 
designated as PG&E Rate Schedule FERC No. 201.
    Copies of this filing were served upon SMUD, the California 
Independent System Operator and the California Public Utilities 
Commission.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

14. Great Bay Power Corporation

[Docket No. ER99-2796-000]

    Take notice that on May 4, 1999, Great Bay Power Corporation (Great 
Bay), tendered for filing a service agreement between Cinergy Capital & 
Trading, Inc., and Great Bay for service under Great Bay's revised 
Tariff for Short Term Sales. This Tariff was accepted for filing by the 
Commission on July 24, 1998, in Docket No. ER98-3470-000.
    The service agreement is proposed to be effective April 30, 1999.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

15. Alliant Energy Corporate Services, Inc.

[Docket No. ER99-2797-000]

    Take notice that on May 4, 1999, Alliant Energy Corporate Services, 
Inc., tendered for filing an executed Service Agreement for short-term 
firm point-to-point transmission service, establishing The Energy 
Authority, Inc., as a point-to-point Transmission Customer under the 
terms of the Alliant Energy Corporate Services, Inc., transmission 
tariff.
    Alliant Energy Corporate Services, Inc., requests an effective date 
of April 26, 1999, and accordingly, seeks waiver of the Commission's 
notice requirements.
    A copy of this filing has been served upon the Illinois Commerce 
Commission, the Minnesota Public Utilities Commission, the Iowa 
Department of Commerce, and the Public Service Commission of Wisconsin.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

16. Sierra Pacific Power Company

[Docket No. ER99-2798-000]

    Take notice that on May 4, 1999, Sierra Pacific Power Company 
(Sierra), tendered for filing Service Agreements (Service Agreements) 
with Energy Transfer Group, L.L.C., for both Short-Term Firm and Non-
Firm Point-to-Point Transmission Service under Sierra's Open Access 
Transmission Tariff (Tariff).
    Sierra filed the executed Service Agreements with the Commission in 
compliance with Sections 13.4 and 14.4 of the Tariff and applicable 
Commission regulations. Sierra also submitted revised Sheet No. 148 
(Attachment E) to the Tariff, which is an updated list of all current 
subscribers.
    Sierra requests waiver of the Commission's notice requirements to 
permit and effective date of May 5, 1999, for Attachment E, and to 
allow the Service Agreements to become effective according to their 
terms.
    Copies of this filing were served upon the Public Service 
Commission of Nevada, the Public Utilities Commission of California and 
all interested parties.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

17. Maine Electric Power Company Inc.

[Docket No. ER99-2800-000]

    Take notice that on May 4, 1999, Maine Electric Power Company, Inc. 
(MEPCO), tendered for filing a service agreement for Non-Firm Point-to-
Point transmission service entered into with Florida Power & Light 
Company (FPLEMT). Service will be provided pursuant to MEPCO's Open 
Access Transmission Tariff, designated rate schedule MEPCO--FERC 
Electric Tariff, Original Volume No. 1, as supplemented.
    MEPCO respectfully requests that the Commission accept this Service 
Agreement for filing and requests waiver of the Commission's notice 
requirements to permit service under the agreement to begin effective 
as of May 4, 1999.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

18. Maine Electric Power Company Inc.

[Docket No. ER99-2801-000]

    Take notice that on May 4, 1999, Maine Electric Power Company, Inc. 
(MEPCO), tendered for filing a service agreement for Umbrella Non-Firm 
Point-to-Point transmission service entered into with Constellation 
Power Source, Inc. Service will be provided pursuant to MEPCO's Open 
Access Transmission Tariff, designated rate schedule MEPCO--FERC 
Electric Tariff, Original Volume No. 1, as supplemented.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

19. Maine Electric Power Company Inc.

[Docket No. ER99-2802-000]

    Take notice that on May 4, 1999, Maine Electric Power Company, Inc. 
(MEPCO), tendered for filing a service agreement for Short-Term Firm 
Point-to-Point transmission service entered into with Constellation 
Power Source, Inc. Service will be provided pursuant to MEPCO's Open 
Access Transmission Tariff, designated rate schedule MEPCO--FERC 
Electric Tariff, Original Volume No. 1, as supplemented.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

20. Montaup Electric Company

[Docket No. ER99-2804-000]

    Take notice that on May 4, 1999, Montaup Electric Company 
(Montaup), tendered for filing an executed service

[[Page 27775]]

agreements under Montaup's market-based power sales tariff, FERC 
Electric Tariff, Original Volume No. 8, between Montaup and the 
following companies:

Baltimore Gas & Electric Co. (BG&E)
DukeSolutions, Inc. (DukeSolutions)
Enserch Energy Services, Inc. (EESI)
FPL Energy Power Marketing, Inc. (FPL EPMI)

    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

21. Storm Lake Power Partners I LLC

[Docket No. ER99-2805-000]

    Take notice that on May 4, 1999, in compliance with the 
Commission's orders approving its market-based rate schedule, 80 FERC 
para. 61,051 (1997) and Unreported Letter Order in Docket No. ER98-
4643-000, dated November 10, 1998, Storm Lake Power Partners I LLC, 
(Storm Lake I), tendered for filing a Notification of Change in Status. 
The Storm Lake I filing describes the generation facilities of new 
affiliates of Storm Lake I and concludes that Storm Lake I's 
affiliation with these facilities does not alter the characteristics 
that the Commission relied upon in approving the market-based pricing 
for Storm Lake I.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

22. Storm Lake Power Partners II, LLC

[Docket No. ER99-2806-000]

    Take notice that on May 4, 1999, in compliance with the 
Commission's order approving its market-based rate schedule, 81 FERC 
para. 61,058 (1997), Storm Lake Power Partners II, LLC (Storm Lake II), 
tendered for filing a Notification of Change in Status. The Storm Lake 
II filing describes the generation facilities of new affiliates of 
Storm Lake II and concludes that Storm Lake II's affiliation with these 
facilities does not alter the characteristics that the Commission 
relied upon in approving the market-based pricing for Storm Lake II.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

23. Enron Power Marketing, Inc.

[Docket No. ER99-2807-000]

    Take notice that on May 4, 1999, in compliance with the 
Commission's orders approving its market-based rate schedule, 65 FERC 
para. 61,305 (1993) and 66 FERC para. 61,244 (1994), Enron Power 
Marketing, Inc. (EPMI), tendered for filing a Notification of Change in 
Status. The EPMI filing describes the generation facilities of new 
affiliates of EPMI and concludes that EPMI's affiliation with these 
facilities does not alter the characteristics that the Commission 
relied upon in approving the market-based pricing for EPMI.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

24. Enron Energy Services, Inc.

[Docket No. ER99-2808-000]

    Take notice that on May 4, 1999, in compliance with the 
Commission's orders approving its market-based rate schedule, 81 FERC 
para. 61,267 (1997), and 84 FERC para. 61,214, Enron Energy Services, 
Inc. (EES), tendered for filing a Notification of Change in Status. The 
EES filing describes the generation facilities of new affiliates of EES 
and concludes that EES's affiliation with these facilities does not 
alter the characteristics that the Commission relied upon in approving 
the market-based pricing for EES.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

25. Clinton Energy Management Services, Inc.

[Docket No. ER99-2809-000]

    Take notice that on May 4, 1999, in compliance with the 
Commission's order approving its market-based rate schedule, 84 FERC 
para. 61,214 (1998), Clinton Energy Management Services, Inc. (Clinton 
Energy), tendered for filing a Notification of Change in Status. The 
Clinton Energy filing describes the generation facilities of new 
affiliates of Clinton Energy and concludes that Clinton Energy's 
affiliation with these facilities does not alter the characteristics 
that the Commission relied upon in approving the market-based pricing 
for Clinton Energy.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

26. Lake Benton Power Partners, LLC

[Docket No. ER99-2810-000]

    Take notice that on May 4, 1999, in compliance with the 
Commission's orders approving its market-based rate schedule, 80 FERC 
para. 61,051 (1997) and Unreported Letter Order in Docket No. ER98-
4643-000, dated November 10, 1998, Lake Benton Power Partners, LLC, 
(Lake Benton, LLC) tendered for filing a Notification of Change in 
Status. The Lake Benton, LLC filing describes the generation facilities 
of new affiliates of Lake Benton, LLC and concludes that Lake Benton, 
LLC's affiliation with these facilities does not alter the 
characteristics that the Commission relied upon in approving the 
market-based pricing for Lake Benton, LLC.
    Comment date: May 5, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

27. Louisville Gas and Electric Co., Kentucky Utilities Company

[Docket No. ER99-2811-000]

    Take notice that on May 4, 1999, Louisville Gas and Electric 
Company/Kentucky Utilities (LG&E/KU), tendered for filing an executed 
Service Agreement for Firm Point-To-Point Transmission Service between 
LG&E/KU and FirstEnergy Corp., under LG&E/KU's Open Access Transmission 
Tariff.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

28. Louisville Gas and Electric Co. and Kentucky Utilities Company

[Docket No. ER99-2812-000]

    Take notice that on May 4, 1999, Louisville Gas and Electric 
Company/Kentucky Utilities (LG&E/KU), tendered for filing an executed 
Service Agreement for Non-Firm Point-To-Point Transmission Service 
between LG&E/KU and DukeSolutions, Inc., under LG&E/KU's Open Access 
Transmission Tariff.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

29. Louisville Gas and Electric Co. and Kentucky Utilities Company

[Docket No. ER99-2813-000]

    Take notice that on May 4, 1999, Louisville Gas and Electric 
Company/Kentucky Utilities (LG&E/KU), tendered for filing an executed 
Service Agreement for Firm Point-To-Point Transmission Service between 
LG&E/KU and DukeSolutions, Inc., under LG&E/KU's Open Access 
Transmission Tariff.
    Comment date: May 24, 1999, in accordance with Standard Paragraph E 
at the end of this notice.

Standard Paragraphs

    E. Any person desiring to be heard or to protest such filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). All such motions 
or protests should be filed on or before the comment date. Protests 
will be considered by the Commission in determining the appropriate 
action to be taken, but will not serve to make

[[Page 27776]]

protestants parties to the proceeding. Any person wishing to become a 
party must file a motion to intervene. Copies of these filings are on 
file with the Commission and are available for public inspection. This 
filing may also be viewed on the Internet at http://www.ferc.fed.us/
online/rims.htm (call 202-208-2222 for assistance).
David P. Boergers,
Secretary.
[FR Doc. 99-12818 Filed 5-20-99; 8:45 am]
BILLING CODE 6717-01-P