DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice Accepting Application for Filing and Requesting 
Interventions and Protests

May 14, 1999.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Minor License.
    b. Project No.: 11541-001.
    c. Date Filed: February 26, 1999.
    d. Applicant: Atlanta Power Company, Inc.
    e. Name of Project: Atlanta Power Station Hydroelectric Project.
    f. Location: On the Middle Fork Boise River in Elmore County, 
Idaho, near the town of Atlanta within the Boise National Forest 
(T5N,R11E, sections 5, 4, 3, 2, and 11 Boise Meridian).
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. Secs. 791(a)-
825(r).
    h. Applicant Contact: Lynn E. Stevenson, President Atlanta Power 
Company, Inc., Box 100, Fairfield, ID (208) 352-4692.
    Michael C. Creamer, Esq. Givens Pursley LLP, 277 N. 6th Street, 
suite 200, P.O. Box 2720, Boise, ID 83701 (208) 388-1200.
    i. FERC Contact: Gaylord W. Hoisington, E-mail address 
[email protected], or telephone (202) 219-2756.
    j. Deadline for filing motions to intervene and protest: 60 days 
from the issuance date of this notice.

[[Page 27534]]

    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the documents on that resource agency.
    k. Status of Environmental Analysis: This application is not ready 
for environmental analysis at this time.
    l. Description of the Project: The proposed project would consist 
of the existing Atlanta Power Station facilities located at the Forest 
Service's Kirby Dam, consisting of: (1) A penstock intake structure; a 
powerhouse, containing a single generating unit with a capacity of 187 
kilowatts; and (3) other appurtenances.
    m. Locations of the application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE, Room 2A, Washington, 
DC 20426, or by calling (202) 208-1371. The application may be viewed 
on http://www.ferc.fed.us/rims.htm (call (202) 208-2222 for 
assistance). A copy is also available for inspection and reproduction 
at the address in item h above.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    Protests or Motions to Intervene--Anyone may submit a protest or a 
motion to intervene in accordance with the requirements of Rules of 
Practice and Procedure, 18 CFR 385.210, .211 and .214. In determining 
the appropriate action to take, the Commission will consider all 
protests filed, but only those who file a motion to intervene in 
accordance with the Commission's Rules may become a party to the 
proceeding. Any protests or motions to intervene must be received on or 
before the specified deadline date for the particular application.
    Filing and Service of Responsive Documents--The application is not 
ready for environmental analysis at this time; therefore, the 
Commission is not now requesting comments, recommendations, terms and 
conditions, or prescriptions.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, or prescriptions.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. Any of these documents must be filed by providing the 
original and the number of copies required by the Commission's 
Regulations to: The Secretary and an additional copy must be sent to 
the Director, Division of Project Review, Office of Hydropower 
Licensing, at the above-mentioned address. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-12673 Filed 5-19-99; 8:45 am]