Take notice that on May 3, 1999, Northwest Pipeline Corporation
(Northwest), 295 Chipeta Way, Salt Lake City, Utah 84108, filed in
Docket No. CP99-453-000 a request pursuant to sections 157.205, 157.211
and 157.216 of the Commission's Regulations under the Natural Gas Act
(18 CFR 157.205, 157.211 and 157.216) for approval to abandon obsolete
facilities at the Pinehurst Meter Station in Shoshone County, Idaho,
and to construct and operate modified replacement facilities at this
station to better accommodate existing firm delivery obligations under
authorized transportation agreements with Avista Corporation, under
Northwest's blanket certificate issued in Docket No. CP82-433-000
pursuant to Section 7 of the Natural Gas Act, all as more fully set
forth in the request that is on file with the Commission and open to
public inspection. The application may be viewed on the web at http://
www.ferc.fed.us/online/rims.htm (call (202) 208-2222 for assistance).
Northwest proposes to modify the Pinehurst Meter Station by
removing a 4-inch positive displacement meter and appurtenances and
installing a 2-inch rotary meter and appurtenances. Northwest states
that the maximum design delivery capacity of the meter station will
increase from 468 Dth per day to approximately 648 Dth per day at 150
psig. The total cost of the proposed facility replacements at the
Pinehurst Meter Station is estimated to be approximately $65,200.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the Natural Gas Act.
David P. Boergers,
Secretary.