[Federal Register Volume 64, Number 77 (Thursday, April 22, 1999)]
[Notices]
[Pages 19853-19854]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-10110]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Environment Impact Statement: SR 20, Fredonia to 1-5, Skagit
County, WA
AGENCY: Federal Highway Administration (FHWA), DOT.
[[Page 19854]]
ACTION: Cancellation of notice of intent, FR document 91-15994.
-----------------------------------------------------------------------
SUMMARY: The FHWA is issuing this notice to rescind the previous Notice
of Intent issued on June 21, 1991, to prepare an environmental impact
statement (EIS) for the proposed highway project in Skagit County,
Washington.
FOR FURTHER INFORMATION CONTACT: Gene K. Fong, Federal Highway
Administration, Evergreen Plaza Building, Suite 501, 711 South Capitol
Way, Olympia, Washington, 98501-1284, Telephone: (360) 753-9413; Brian
Ziegler, State Design Engineer, Washington State Department of
Transportation, Transportation Administration Building, Olympia,
Washington, 98204, Telephone: (360) 705-7231; or, John Okamoto, WSDOT
Northwest Region Administrator, 15700 Dayton Avenue North, PO Box
330310, Seattle, Washington 98133-9710, Telephone: (206) 440-4691.
SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Washington
State Department of Transportation (WSDOT), issued a Notice of Intent
on June 21, 1991 to prepare an EIS on a proposal to improve or
construct a 4-1/2 mile section of SR 20 from two lanes to four lanes.
The Draft Environmental Impact Statement (DEIS) was originally
circulated on May 30, 1995, and was followed by an EIS/Design Hearing
on June 28, 1995. Since then, as the project elements have been
refined, impacts have been more specifically identified, and public and
agency comments have been evaluated, the FHWA and WSDOT have jointly
decided that the project will not result in significant impacts to the
environment and that an Environmental Assessment (EA) is the most
appropriate environmental document under the National Environmental
Policy Act (NEPA) rather than an EIS. The EA is available through the
above contacts. Because a previous hearing was held for this project,
another hearing is not planned for the current EA. However, any person
with questions about the project or wishing to request a hearing may
write to Bill James at 15700 Dayton Avenue North, MS 11, PO. Box
330310, Seattle, WA. 98133-9710, or call (206) 440-4139.
Authority: Catalog of Federal Domestic Assistance Program Number
20.205, Highway Research, Planning and Construction. The regulations
implementing Executive Order 12372 regarding intergovernmental
consultation of federal programs and activities apply to this
program.
Issued on: April 12, 1999.
Donald A Petersen,
Transportation and Environmental Engineer, Olympia, Washington.
[FR Doc. 99-10110 Filed 4-21-99; 8:45 am]
BILLING CODE 4910-22-M