[Federal Register Volume 63, Number 239 (Monday, December 14, 1998)]
[Notices]
[Pages 68760-68761]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-33022]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene and Protest

December 8, 1998.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: New Major License.
    b. Project No.: 2588-004.
    c. Date filed: July 10, 1998.
    d. Applicant: City of Kaukauna.
    e. Name of Project: Little Chute Hydroelectric Project.
    f. Location: On the Fox River in the Village of Combined Locks, 
Outagamie County, Wisconsin. The project uses the United States Army 
Corps of Engineer's Little Chute Dam. The project does not occupy 
federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Secs. 791(a)-
825(r).
    h. Applicant Contact: Peter D. Prast, P.E., General Manager, 
Kaukauna Electric & Water Department, 777 Island Street, P.O. Box 1777, 
Kaukauna, Wisconsin 54130-7077, (920) 766-5721.
    i. FERC Contact: Any questions on this notice should be addressed 
to Steve Kartalia, E-mail address, [email protected], or 
telephone 202-219-2942.
    j. Deadline for filing motions to intervene and protest: 60 days 
from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE, Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Status of environmental analysis: This application is not ready 
for environmental analysis at this time.
    l. Description of the project: The project consists of the 
following existing facilities: (1) an integral intake powerhouse, 
located at the right abutment of the United States Army Corps of 
Engineers' Little Chute Dam, containing three units with a total 
installed capacity of 3,300 kW; (2) connections to three 2.4/12-kV 
single phase transformers and a 12-kV transmission line 1.25 miles 
long; and (3) other appurtenances.
    m. Locations of the application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE, Room 2A, Washington, 
D.C. 20426, or by

[[Page 68761]]

calling (202) 208-1371. The application may be viewed on the web at 
www.ferc.fed.us. Call (202) 208-2222 for assistance. A copy is also 
available for inspection and reproduction at the address in item h 
above.
    n. This notice also consists of the following standard paragraphs: 
B1 and E1.
    B1. Protests or Motions to Intervene--Anyone may submit a protest 
or a motion to intervene in accordance with the requirements of Rules 
of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In 
determining the appropriate action to take, the Commission will 
consider all protests filed, but only those who file a motion to 
intervene in accordance with the Commission's Rules may become a party 
to the proceeding. Any protests or motions to intervene must be 
received on or before the specified deadline date for the particular 
application.
    E1. Filing and Service of Responsive Documents--The application is 
not ready for environmental analysis at this time; therefore, the 
Commission is not now requesting comments, recommendations, terms and 
conditions, or prescriptions.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, or prescriptions.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading 
the name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. 
Agencies may obtain copies of the application directly from the 
applicant. Any of these documents must be filed by providing the 
original and the number of copies required by the Commission's 
regulations to: The Secretary, Federal Energy Regulatory Commission, 
888 First Street, N.E., Washington, D.C. 20426. An additional copy must 
be sent to Director, Division of Project Review, Office of Hydropower 
Licensing, Federal Energy Regulatory Commission, at the above address. 
A copy of any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-33022 Filed 12-11-98; 8:45 am]
BILLING CODE 6717-01-M