[Federal Register Volume 63, Number 211 (Monday, November 2, 1998)]
[Notices]
[Page 58797]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-29263]



[[Page 58797]]

-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Fire Protection Functional Inspection (FPFI) Program Workshop

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice of public meeting.

-----------------------------------------------------------------------

SUMMARY: The Nuclear Regulatory Commission staff is holding a workshop 
to discuss with and obtain feedback from the nuclear industry and the 
public regarding the results of the recently completed four Fire 
Protection Functional Inspection (FPFI) Program pilot inspections. A 
written summary will be issued to registered participants after the 
meeting.

AGENDA: The workshop will be held from 8:00 a.m.--5:00 p.m. on November 
10, 1998, at the Doubletree Hotel, 1750 Rockville Pike, Rockville, MD 
20952 (Twinbrook Metro Stop). Presentations will be made by speakers 
from NRC Staff and staff contractors, NEI, and other public and 
industry representatives.

SUPPLEMENTARY INFORMATION: The preliminary agenda for the proposed 
workshop is:

7:30-8:00  Registration
8:00-8:10  Introduction and Presentation of Agenda
    L.B. Marsh, Chief, Plant Systems Branch, NRR
8:10-8:25  Keynote Address
    Samuel J. Collins, Director, Office of Nuclear Reactor Regulation
8:25-8:35  Introductory Remarks by an Industry Representative
    Industry Speaker TBD
8:35-8:50  Focus Comparison Between Appendix R, NRC Core, and FPFI 
Temporary Instruction
    Pat Madden, Fire Protection Engineering Section, SPLB/NRR
8:50-9:30  FPFI Pilot, Clinton, and Quad Cities Fire Protection 
Inspection Results; and Discussion of Safety Significant Commercial 
Reactor Fire Protection Issues Highlighted During the Inspections
    Pat Madden, Fire Protection Engineering Section, SPLB/NRR
    Ken Sullivan, Brookhaven National Laboratory
9:30-9:45  Break
9:45-10:00  Use of Risk Information for FPFI Inspection Focus, and NRC 
Process for Assessment of FPFI Inspection Finding Risk Significance
    Rich Barrett, Chief, Probabilistic Safety Assessment Branch, NRR
10:00-11:00  Public and Industry Observations on FPFI Pilot Program 
Activities
    Public and Industry Speakers TBD
11:00-11:30  Comparison of Pilot FPFI Program Objectives and Results
    Steve West, Chief, Fire Protection Engineering Section, SPLB/NRR
11:30-12:00  Post-Pilot FPFI Program Continuation Options
    L.B. Marsh, Chief, Plant Systems Branch, NRR
12:00-1:30  Lunch Break
1:30-3:30  Stakeholder Views on FPFI Continuation Options
    Public and Industry Speakers TBD
3:30-4:30  Open Discussion and Question and Answer Session
    NRC, Public and Industry on the dais, participants TBD
4:30-4:40  Industry Closing Remarks
    Fred Emerson, Nuclear Energy Institute
4:40-4:50  NRC Closing Remarks and Adjourn
    L.B. Marsh, Chief, Plant Systems Branch, NRR

FOR FURTHER INFORMATION CONTACT: Leon E. Whitney, Mail Stop O-8-D1, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. 
Telephone (301) 415-3081; E-mail: [email protected].

PUBLIC PARTICIPATION: Individuals wishing to make a presentation at the 
workshop should contact Leon Whitney directly. Individuals who wish to 
attend the workshop are encouraged to provide their name, 
organizational affiliation, address, and phone number either by FAX 
(415-415-2300) or by E-mail ([email protected]).

    Dated at Rockville, Maryland this 27th day of October 1998.

    For the Nuclear Regulatory Commission.
Ledyard B. Marsh,
Chief, Plant System Branch, Division of Systems Safety and Analysis, 
Office of Nuclear Reactor Regulation.
[FR Doc. 98-29263 Filed 10-30-98; 8:45 am]