[Federal Register Volume 63, Number 189 (Wednesday, September 30, 1998)] [Notices] [Pages 52249-52250] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 98-26100] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP98-794-000] Northwest Pipeline Corporation; Notice of Application September 24, 1998. Take notice that on September 18, 1998, Northwest Pipeline Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84158, filed in Docket No. CP98-794-000, an application pursuant to Section 7(C) of the Natural Gas Act (NGA) and Part 157 of the Federal Energy Regulatory Commission's (Commission) regulations, for a blanket certificate of public convenience and necessity authorizing the construction and operation of temporary compression facilities, all as more fully set forth in the application which is on file with the Commission and open to public inspection. Northwest seeks authorization to temporarily install and operate portable compressor units at the existing Chehalis Compressor Station in Lewis County, Washington and at a proposed new Fort Lewis Compressor Station in Pierce County, Washington. Northwest also requests certificate authorization to construct the appurtenant facilities at those two sites necessary to accommodate the portable compressor units. Northwest proposes to construct a new Fort Lewis Compressor Station and related facilities (excluding a permanent compressor unit). Northwest also proposes to construct appurtenant facilities at the existing Chehalis Compressor Station necessary to accommodate temporary operation of a portable turbine compressor unit. Northwest states that it owns two portable Solar Centaur compressor units (4,700 ISO-rated horsepower each) which currently are dedicated to temporarily replacing out-of-service permanent units under existing blanket certificate authority. Northwest requests blanket authority, with pre-granted abandonment, for temporary installation and operation of the existing portable Solar Centaur compressor units--one each at the new Fort Lewis Compressor Station and the existing Chehalis Compressor Station; but only when such portable units are not needed for their primary function of temporarily replacing out-of-service permanent compressor units. Northwest avers that the Fort Lewis/Chehalis area of Northwest's system historically has been an operational bottleneck for movement of Canadian [[Page 52250]] gas supplies southward during off-peak periods. Northwest states that the proposed project will increase Northwest's off-peak physical south flow capacity through the Fort Lewis area by as much as 75 MDth/d to 130 MDth/d, depending upon upstream market conditions. Any person desiring to be heard or making any protest with reference to said application should on or before October 15, 1998, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene or a protest in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10). All protests filed with the Commission will be considered by it in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. The Commission's rules require that protestors provide copies of their protests to the party or person to whom the protests are directed. Any person wishing to become a party to a proceeding or to participate as a party in any hearing therein must file a motion to intervene in accordance with the Commission's Rules. A person obtaining intervenor status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents issued by the Commission, filed by the applicant, or filed by all other intervenors. An intervenor can file for rehearing of any Commission order and can petition for court review of any such order. However, an intervenor must serve copies of comments or any other filing it makes with the Commission to every other intervenor in the proceeding, as well as filing an original and 14 copies with the Commission. A person does not have to intervene, however, in order to have comments considered. A person, instead, may submit two copies of such comments to the Secretary of the Commission. Commenters will be placed on the Commission's environmental mailing list, will receive copies of environmental documents, and will be able to participate in meetings associated with the Commission's environmental review process. Comments will not be required to serve copies of filed documents on all other parties. However, commenters will not receive copies of all documents filed by other parties or issued by the Commission, and will not have the right to seek rehearing or appeal the Commission's final order to a Federal court. The Commission will consider all comments and concerns equally, whether filed by commenters or those requesting intervenor status. Take further notice that, pursuant to the authority contained in and subject to the jurisdiction conferred upon the Federal Energy Regulatory Commission by Sections 7 and 15 of the NGA and the Commission's Rules of Practice and Procedure, a hearing will be held without further notice before the Commission or its designee on these applications if no motion to intervene is filed within the time required herein, if the Commission on its own review of the matter finds that a grant of the certificate is required by the public convenience and necessity. If a motion for leave to intervene is timely filed, or if the Commission on its own motion believes that a formal hearing is required, further notice of such hearing will be duly given. Under the procedure herein provided for, unless otherwise advised, it will be unnecessary for Northwest to appear or be represented at the hearing. David P. Boergers, Secretary. [FR Doc. 98-26100 Filed 9-29-98; 8:45 am] BILLING CODE 6717-01-M