[Federal Register Volume 63, Number 186 (Friday, September 25, 1998)]
[Notices]
[Page 51345]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-25662]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Application Tendered for Filing With the Commission

September 21, 1998.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of application: Major Hydropower Project.
    b. Project No: 2722-008.
    c. Date filed: August 21, 1998.
    d. Applicant: PacifiCorp.
    e. Name of Project: Pioneer Hydroelectric Project.
    f. Location: On the Ogden River, near the town of Ogden, Utah in 
Weber County. Most of this existing project is located within the Cache 
National Forest. Water is supplied from the U.S. Bureau of 
Reclamation's Pineview Reservoir.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Randy Landolt, Director, Hydro Resources, 
PacifiCorp, 920 SW Sixth Avenue, Portland, Oregon 97204, (503) 464-
5339.
    i. FERC Contact: Carl Keller at (202) 219-2831.
    j. Brief Description of the Project: The existing project consists 
of: (1) a 206-foot-long and 10-foot-high diversion dam; (2) an 80-foot 
by 60-foot concrete intake structure; (3) an approximately 16,000-foot-
long water conveyance system; (4) an 86-foot-wide by 51-foot-long 
concrete powerhouse; (5) one turbine generator unit with a rated 
capacity of 6.35 megawatts; (6) a 3,000-foot-long, tailrace canal; and 
(7) other appurtenances.
    k. With this notice, we are initiating consultation with the UTAH 
STATE HISTORIC PRESERVATION OFFICER (SHPO), as required by Sec. 106, 
National Historic Preservation Act, and the regulations of the Advisory 
Council on Historic Preservation, 36, CFR, at 800.4.
    l. Under Section 4.32 (b)(7) of the Commission's Regulations (18 
CFR), if any resource agency, Indian Tribe, or person believes that the 
applicant should conduct an additional scientific study to form an 
adequate factual basis for a complete analysis of the application on 
its merits, they must file a request for the study with the Commission, 
not later than 60 days after the filed application date in paragraph c, 
and must serve a copy of the request on the applicant.
David P. Boergers,
Secretary.
[FR Doc. 98-25662 Filed 9-24-98; 8:45 am]
BILLING CODE 6717-01-M