DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. CP98-764-000]


ANR Pipeline Company; Notice of Request Under Blanket 
Authorization

September 10, 1998.
    Take notice that on September 4, 1998, ANR Pipeline Company (ANR), 
500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. 
CP98-764-000 a request pursuant to Sections 157.205 and 157.211 of the 
Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 
157.211) for authorization to operate under the provisions of Section 
7(c) of the Natural Gas Act (NGA) an existing interconnection in Texas 
County, Oklahoma, that has been constructed pursuant to Section 311 of 
the Natural Gas Policy Act of 1978 (NGPA), all as more fully set forth 
in the request that is on file with the Commission and open to public 
inspection.
    Pursuant to Section 311 of the NGPA, ANR constructed an 
interconnection to the facilities of Hitch Enterprises, Inc., 
facilities consisted of a 2-inch turbine meter, a 2-inch insulating 
flange, a 4-inch tap valve, and an electronic measurement system. The 
cost of the facilities was approximately $64,000, which was fully 
reimbursed by Hitch. ANR delivers natural gas at this interconnection 
under rate Schedule ITS of its FERC Gas Tariff, Second Revised Volume 
No. 1.
    ANR states that the construction of the proposed interconnection 
facilities will have no effect on its peak day and annual deliveries, 
that its existing tariff does not prohibit additional interconnections, 
that deliveries will be accomplished without detriment or disadvantage 
to its other customers and that the total volumes delivered will not 
exceed total volumes authorized prior to this request.
    Any person or the Commission's staff may, within 45 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
the request. If no protest is filed within the time allowed therefor, 
the proposed activity shall be deemed to be authorized effective the 
day after the time allowed for filing a protest. If a protest is filed 
and not withdrawn within 30 days after the time allowed for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Secretary.
[FR Doc. 98-24684 Filed 9-14-98; 8:45 am]
BILLING CODE 6717-01-M