DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket Nos. 2299-040 and -042]


Turlock and Modesto Irrigation Districts; Notice of Application 
to Amend License

September 9, 1998.
    By letter dated March 6, 1998, the U.S. Army Corps of Engineers 
(Corps) requested the Commission modify article 38 of the license for 
the Don Pedro Project, No. 2299. Consultation among the Turlock and 
Modesto Irrigation Districts (licensees) and the Corps resulted in a 
joint request, filed on August 14, 1998, to amend subparagraph (a) of 
article 38. The licensee requests the paragraph be amended to read:

    Article 38(a). Flows below La Grange bridge may be altered by 
the licensees at any time in connection with the operation of the 
project for flood control purposes or other emergencies provided 
that, if such flood control operations are required, flows shall be 
made to meet the requirements of the U.S. Army Corps of Engineer's 
approved Water Control Plan, Water (Flood) Control Diagram, and 
Emergency Spillway Release Diagram or an approved deviation from 
these documents. The licensees shall take reasonable measures to 
insure that releases from the project do not cause the flow in the 
Tuolumne River at the Modesto gage to below Dry Creek to exceed 
9,000 cfs unless otherwise agreed to by the Corps of Engineers. 
After flood control criteria within the reservoir have been met, the 
licensees shall reduce the releases from the project as soon as it 
is reasonably practicable.

    Please submit any comments on the request within 30 days from the 
date of this notice. Any comments, conclusions, or recommendations that 
draw upon studies, reports, or other working papers of substance should 
be supported by appropriate documentation. Please affix Project No. 
2299-042 on all filings.
    Comments, protests and requests to intervene may be made in 
accordance with the following paragraphs.
    Comments, Protests, or Motions to Intervente--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protest, or motions 
to intervene must be received on or before the specified comment date 
for the particular application.
    Filing and Service of Responsive Documents--Any filings must bear 
in all capital letters the title ``COMMENT'', ``RECOMMENDATIONS FOR 
TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. Any of the above-named documents must be filed 
by providing the original and the number of copies provided by the 
Commission's regulations to: The Secretary, Federal Energy Regulatory 
Commission, 888 First Street, N.E., Washington, D.C. 20426. A copy of 
any motion to intervene must also be served upon each representative of 
the Applicant specified in the particular application.
    Agency Comments--Federal, state, and local agencies are invited to 
file comments on the described application. A copy of the application 
may be obtained by agencies directly from the Applicant. If an agency 
does not file comments within the time specified for filing comments, 
it will be presumed to have no comments. One copy of an agency's 
comments must also be sent to the Applicant's representatives.
David P. Boergers,
Secretary.