DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Project No. 11060-000 Idaho]


J.M. Miller Enterprises, Inc.; Notice of Availability of Draft 
Environmental Assessment

August 27, 1998.
    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office 
of Hydropower Licensing has reviewed the application for an original, 
minor license for the proposed Sahko Hydroelectric Project, and has 
prepared a Draft Environmental Assessment (DEA) for the project. The 
project would be located on the Kastelu Drain, an irrigation return 
ditch also known as Southside 39 Drain, near Filer, Idaho in Twin Falls 
County. The DEA contains the Commission staff's analysis of the 
potential future environmental impacts of the project and has concluded 
that licensing the project, with appropriate environmental protective 
measures, would not constitute a major federal action that would 
significantly affect the quality of the human environment.
    Copies of the DEA are available for review in the Public Reference 
Room, Room 2A, of the Commission's offices at 888 First Street, NE., 
Washington, DC 20426.
    Any comments should be filed within 30 days from the date of this 
notice and should be addressed to David P. Boergers, Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426. For further information, contact Nan Allen, Environmental 
Coordinator, at (202) 219-2938, or E-mail [email protected].
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-23589 Filed 9-1-98; 8:45 am]
BILLING CODE 6717-01-M