NUCLEAR REGULATORY COMMISSION

[Docket No. 50-397]


Washington Public Power Supply System; Notice of Withdrawal of 
Application for Amendment to Facility Operating License

    The U.S. Nuclear Regulatory Commission (the Commission) has granted 
a request by Washington Public Power Supply System (the licensee) to 
withdraw its July 16, 1997, application for an amendment to Facility 
Operating License No. NPF-21, issued to the licensee for operation of 
the Nuclear Project No. 2 (WNP-2), located in Benton County, 
Washington. Notice of Consideration of Issuance of this amendment was 
published in the

[[Page 46257]]

Federal Register on October 8, 1997 (62 FR 52591).
    The proposed amendment would have added new minimum reactor vessel 
pressure versus reactor vessel metal temperature (P/T) curves, 
applicable to 12 EFPY (effective full power years). Subsequently, by 
letter dated June 2, 1998, the licensee informed the staff that based 
upon an earlier commitment, new P/T curves would be submitted to the 
NRC staff.
    For further details with respect to this action, see (1) the 
application for amendment dated July 16, 1997, and (2) the staff's 
letter dated August 25, 1998.
    These documents are available for public inspection at the 
Commission's Public Document Room, the Gelman Building, 2120 L Street, 
NW., Washington, DC and at the Richland Public Library, 955 Northgate 
Street, Richland, Washington 99352.

    Dated at Rockville, Maryland this 25th day of August 1998.

For the Nuclear Regulatory Commission.
Chester Poslusny,
Senior Project Manager, Project Directorate IV-2, Division of Reactor 
Projects III/IV, Office of Nuclear Reactor Regulation.
[FR Doc. 98-23339 Filed 8-28-98; 8:45 am]