[Federal Register Volume 63, Number 120 (Tuesday, June 23, 1998)]
[Notices]
[Page 34161]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-16609]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Tendered for Filing with the Commission
June 17, 1998.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a.Type of Application: Minor license.
b. Project No.: P-11616-000.
c. Date Filed: June 1, 1998.
d. Applicant: City of Portland, Michigan.
e. Name of Project: Portland Municipal Hydroelectric Project.
f. Location: On the Grand River in Ionia County, Michigan.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-824(r).
h. Applicant Contact: Robert Masselink, P.E., Glen Hendrix, Earth
Tech, Inc., 5555 Glenwood Hills Pkwy, Grand Rapids, MI 49588, (616)
942-9600.
i. FERC Contact: Michael Spencer at (202) 219-2846.
j. Comment Date: 60 days from the date of filing of the
application.
k. Description of Project: The constructed project consists of a
dam and reservoir, a forebay and powerhouse located at the south
abutment containing two turbine-generator units with a total installed
capacity of 375 kilowatts, and appurtenant facilities. The project will
generate about 1,572 megawatt-hours per year.
l. With this notice, we are initiating consultation with the
MICHIGAN STATE HISTORIC PRESERVATION OFFICER (SHPO), as required by
Sec. 106, National Historic Preservation Act, and the regulations of
the Advisory Council on Historic Preservation, 36 CFR 800.4.
m. Pursuant to Section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
David P. Boergers,
Acting Secretary.
[FR Doc. 98-16609 Filed 6-22-98; 8:45 am]
BILLING CODE 6717-01-M