SUMMARY: The FHWA is issuing this notice to advise the public that an
Environmental Impact Statement (EIS) will be prepared for a proposed
highway project in Orange County, Florida.
FOR FURTHER INFORMATION CONTACT: Mr. Mark D. Bartlett, Programs
Operation Engineer, Federal Highway Administration, 227 N. Bronough
Street, Room 2015, Tallahassee, Florida 32301, Telephone (904) 942-
9598.
SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Florida
Department of Transportation, will prepare an EIS for a proposal to
improve and extend SR 438 (John Young Parkway) from SR 50 (W. Colonial
Drive) to SR 424 (Edgewater Drive) at SR 434 (Forest City Road), a
distance of approximately 4.2 miles (6.7 km). The proposed improvement
will complete
[[Page 26247]]
the link between Kissimmee and Maitland. This arterial will provide an
alternative to I-4 traffic through Orlando, and will also alleviate
traffic congestion on the existing local connecting streets of Lee
Road, Carder Road, US 441, All American Boulevard, and Edgewater Drive
that now must carry continuing northbound traffic to Forest City Road.
Alternatives under consideration are: (1) ``No Build'', or no
improvements within the corridor beyond what is now committed; (2)
Improvement of existing roadway facilities including transportation
management system (TSM) within the corridor and; (3) New alignment:
six-laning and extension of John Young Parkway from SR 50 to Forest
City Road.
In the EIS, the FHWA and local agencies will evaluate all
environmental impacts of the project, including socio-economic impact,
cultural impact, and public recreational facility impact to the roadway
corridor and surrounding communities, natural impacts to the wildlife
and vegetation, and physical impacts to land use aesthetics, noise
levels, and air and water quality of the area. Impacts to floodplain
and Outstanding Florida Waters, wetlands and endangered or threatened
species, wildlife corridors and critical habitat will be evaluated. The
presence of contaminated properties or potential contamination will be
evaluated. Impacts will be evaluated for both short term and long term
duration and mitigation of any impacts will be studied. Storm water
volume and quality management will be a major design consideration.
Meeting the local transportation needs, both personal and mass transit,
and public service needs of the area communities are goals of the
study.
Letters with description of the proposed project soliciting
comments will be sent to appropriate Federal, State, and local
agencies, as well as private groups and citizens that have expressed
interest in this proposal. Public notice will be issued for a series of
public meetings and hearings to be held in Orange County and the City
of Orlando between April, 1998 and March, 1999, where the Draft EIS
will be available to the agencies and public for review and discussion.
A formal scoping meeting is planned at the project site during 1998.
Comments on the proposal from all interested parties are solicited and
should be directed to the FHWA contact person listed above.
(Catalog of Federal Domestic Assistance Program Number 20.205,
Highway Research, Planning and Construction. The regulations
implementing Executive Order 12372 regarding intergovernmental
consultation on Federal programs and activities apply to this
program)