NUCLEAR REGULATORY COMMISSION
Illinois Power Company; Notice of Withdrawal of Application for
Exemption to 10 CFR 50, Appendix A, General Design Criterion 17 and
Amendment to Facility Operating License
[Docket No. 50-461]
The U.S. Nuclear Regulatory Commission (the Commission) has granted
the request of Illinois Power Company (the licensee) to withdraw its
July 22, 1997, application for proposed exemption to 10 CFR Part 50,
Appendix A, General Design Criterion (GDC) 17, ``Electric Power
Systems,'' and amendment to Facility Operating License No. NPF-62 for
the Clinton Power Station, located in DeWitt County, Illinois.
The proposed exemption and amendment would have temporarily
permitted plant operation with one fully qualified offsite circuit and
one circuit that does not strictly conform to the capacity and
capability requirements of GDC-17.
The Commission had previously issued an environmental assessment
and finding of no significant impact published in the Federal Register
on July 25, 1997 (62 FR 40123). However, by letter dated September 30,
1997, the licensee withdrew the proposed change.
For further details with respect to this action, see the
application for exemption and amendment dated July 22, 1997,
supplemented July 23, August 1, and August 12, 1997, and the licensee's
letter dated September 30, 1997, which withdrew the application for
exemption and license amendment. The above documents are available for
public inspection at the Commission's Public Document Room, the Gelman
Building, 2120 L Street, NW., Washington, DC, and at the local public
document room located at the Vespasian Warner Public Library, 310 N.
Quincy Street, Clinton, IL 61727.
Dated at Rockville, Maryland, this 8th day of April 1998.
For the Nuclear Regulatory Commission.
Jon B. Hopkins,
Senior Project Manager, Project Directorate III-3, Division of Reactor
Projects--III/IV, Office of Nuclear Reactor Regulation.
[FR Doc. 98-9995 Filed 4-14-98; 8:45 am]