DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Conduit Exemption
January 9, 1998.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Conduit Exemption (Tendered Notice).
b. Project No.: 11610-000.
c. Date filed: November 7, 1997.
d. Applicant: Gary R. Hobbs.
e. Name of Project: Cherry Grove Project.
f. Location: At the Crab Creek Canyon, in Utah County, Utah.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. Secs. 791(a)-
825(r).
h. Applicant Contact: Gary R. Hobbs, H.C. 13, Box 520, Fairview, UT
84629, (801) 873-3343.
i. FERC Contact: Robert W. Bell (202) 219-2806.
j. Description of Project: The proposed project consists of: (1) A
powerhouse that would be built on the City of Spanish Fork's 14-inch-
diameter, ductile iron pipeline, with one generating unit having an
installed capacity of 224-kW. The applicant would use all the power
generated for a proposed housing development. The average annual
generation would be 1,726,000 kWh.
k. Under section 4.32(b)(7) of the Commission's regulations (18
CFR), if any resource agency, Indian Tribe, or person believes that the
applicant should conduct an additional scientific study to form an
adequate factual basis for a complete analysis of the application on
its merits, they must file a request for the study with the Commission,
not later than 60 days after the date of this notice, and must serve a
copy of the request on the applicant.
Linwood A. Watson, Jr.
Acting Secretary.