[Federal Register Volume 63, Number 2 (Monday, January 5, 1998)] [Notices] [Pages 273-274] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 98-98] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-295 and 50-304] Commonwealth Edison Company; Notice of Issuance of Amendments to Facility Operating Licenses The U.S. Nuclear Regulatory Commission (Commission) has issued Amendment No. 178 to Facility Operating License No. DPR-39 and Amendment No. 165 to Facility Operating License No. DPR-48, issued to Commonwealth Edison Company (ComEd, the licensee), which revised the operating licenses and the Technical Specifications (TS) for operation of the Zion Nuclear Power Station, Units 1 and 2, located in Lake County, Illinois. The amendments are effective as of the date of issuance and shall be implemented prior to Unit 2 entering Mode 4. The amendments replace, in their entirety, the Zion Technical Specifications with a set based on NUREG-1431, Revision 1, ``Standard Technical Specifications--Westinghouse Plants'' issued in April 1995, and on guidance provided in the Commission's ``Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors,'' published on July 22, 1993 (58 FR 39132). The amendments also modify the licenses by relocating requirements from four license [[Page 274]] conditions to the Technical Specifications and one license condition to the Updated Final Safety Analysis Report. Further, the amendments add a new license condition 2.C.(12) reflecting the licensee's commitments regarding relocation of Technical Specification and license condition requirements to licensee-controlled documents and add an Appendix D to the Facility Operating Licenses describing those commitments. In addition, the amendments revise Technical Specification 4.3.1.B.4.A.10 by identifying enhancements to the Combustion Engineering welded steam generator tube sleeve process described in Topical Report CEN-331-P, Revision 1-P. The application for the amendments complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, as set forth in the license amendments. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Opportunity for a Hearing in connection with this action as it applies to the Improved Technical Specifications was published in the Federal Register on December 29, 1995 (60 FR 67366). No request for a hearing or petition for leave to intervene was filed following this notice. The Commission has prepared an Environmental Assessment related to the action and has determined not to prepare an environmental impact statement. Based upon the environmental assessment, the Commission has concluded that the issuance of the amendments will not have a significant effect on the quality of the human environment. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing in connection with this action as it applies to enhancements to the Combustion Engineering welded steam generator tube sleeve process described in Topical Report CEN-331-P, Revision 1-P was published in the Federal Register on November 6, 1996 (61 FR 57483). No request for a hearing or petition for leave to intervene was filed following this notice and no significant hazards consideration comments were received. The February 3, 1997, supplement provided Technical Specification pages reformatted in the Improved Technical Specification format. This supplement was within the scope of the original application and did not change the staff's initial proposed no significant hazards consideration determination. For further details with respect to the action see (1) the application for amendment dated November 3,1995, as supplemented by letters dated November 22, 1995, March 15, 1996, April 30, 1996, May 8, 1996, May 17, 1996, May 21, 1996, June 6, 1996, July 5, 1996, July 17, 1996, September 13, 1996, September 20, 1996, November 1, 1996, December 11, 1996, January 2, 1997, February 3, 1997, two letters dated May 8, 1997, June 6, 1997, September 19, 1997, October 20, 1997, November 10, 1997, and November 28, 1997, (2) Amendment No. 178 to License No. DPR-39 and Amendment No.165 to License No. DPR-48, and (3) the Commission's related Safety Evaluation and Environmental Assessment. All of these items are available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street NW., Washington, DC, and at the local public document room located at the Waukegan Public Library, 128 N. County Street, Waukegan, Illinois 60085. A copy of items (2) and (3) may be obtained upon request addresses to the U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention: Director, Division of Reactor Projects--III/IV. Dated at Rockville, Maryland, this 19th day of December 1997. For the Nuclear Regulatory Commission. Clyde Y. Shiraki, Project Manager, Project Directorate III-2, Division of Reactor Projects--III/IV, Office of Nuclear Reactor Regulation. [FR Doc. 98-98 Filed 1-2-98; 8:45 am] BILLING CODE 7590-01-P