[Federal Register Volume 63, Number 1 (Friday, January 2, 1998)]
[Notices]
[Pages 69-74]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-34172]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. EG98-22-000, et al.]


El Segundo Power, LLC, et al.; Electric Rate and Corporate 
Regulation Filings

December 24, 1997.
    Take notice that the following filings have been made with the 
Commission:

1. El Segundo Power, LLC

[Docket No. EG98-22-000]

    Take notice that on December 19, 1997, El Segundo Power, LLC, with 
its principal office at 1221 Nicollet Mall, Suite 700, Minneapolis, MN 
55403, filed with the Commission an application for determination of 
exempt wholesale generator status pursuant to Part 365 of the 
Commission's Regulations.
    Applicant states that it is a limited liability company organized 
under the laws of the State of Delaware. Applicant will be engaged 
directly and exclusively in owning and operating an approximately 1020 
MW gas-fired electric generating facility located at 301 Vista Del Mar 
Boulevard, El Segundo, CA 90245. Electric energy produced by the 
facility will be sold at wholesale to the Independent System Operator 
and into the California Power Exchange.
    Comment date: January 15, 1998, in accordance with Standard 
Paragraph E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

2. Tampa Electric Company

[Docket No. ER97-169-000]

    Take notice that on December 12, 1997, Tampa Electric Company 
(Tampa Electric) filed a letter agreement with the Florida Municipal 
Power Agency (FMPA) that amends the letter of commitment between Tampa 
Electric and FMPA tendered previously in this docket.
    Comment date: January 9, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

3. Central Hudson Gas & Electric Corporation; Consolidated Edison 
Company of New York, Inc.; Long Island Lighting Company; New York 
State Electric & Gas Corporation; Niagara Mohawk Power Corp.; 
Orange and Rockland Utilities, Inc.; Rochester Gas and Electric 
Corporation; New York Power Pool

[Docket Nos. ER97-1523-000, OA97-470-000, and ER97-4234-000 (Not 
Consolidated)]

    Take notice that on December 19, 1997, Central Hudson Gas & 
Electric Corporation, Consolidated Edison Company of New York, Inc., 
Long Island Lighting Company, New York State Electric & Gas 
Corporation, Niagara Mohawk Power Corporation, Orange and Rockland 
Utilities, Inc., and Rochester Gas and Electric Corporation (Member 
Systems) filed, pursuant to Section 205 of the Federal Power Act, 
revisions to the following documents filed on January 31, 1997, in the 
above-referenced proceedings as part of the restructuring of the New 
York Power Pool:
    1. Independent System Operator Agreement and the Independent System 
Operator Tariff;
    2. New York State Reliability Council Agreement;
    3. Independent System Operator--New York State Reliability Council 
Agreement; and
    4. Independent System Operator--Transmission Provider Agreement.
    In addition, the Member Systems filed the New York Independent 
System Operator Filing Definitions Document, supporting information and 
affidavits.
    The Member Systems state that the revised documents are being 
served on the parties to this proceeding and the New York State Public 
Service Commission, the Pennsylvania Public Utilities Commission and 
the New Jersey Board of Public Utilities.
    Comment date: January 23, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

4. Idaho Power Company

[Docket Nos. ER97-4021-000 and ER97-4023-000]

    Take notice that on December 8, 1997, Idaho Power Company (IPC), 
tendered for filing an amended filing with regard to its Power Sale 
Agreement with Truckee-Donner Public Utility District and the Network 
Integration Transmission Agreement by Idaho Power on its Open-Access 
Transmission Tariff.
    Comment date: January 9, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

5. Millennium Energy Corporation

[Docket No. ER98-174-000]

    Take notice that on December 11, 1997, Millennium Energy 
Corporation (Millennium Energy) tendered for filing an amendment and 
supplement to its application filed October 15, 1997, for waivers and 
blanket approvals under various regulations of the Commission and for 
an order accepting its FERC Electric Rate Schedule No. 1, to be 
effective on the date of the Commission's order accepting the Rate 
Schedule for filing.
    Comment date: January 9, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

6. Aurora Power Resources, Inc.

[Docket No. ER98-573-000]

    Take notice that on December 11, 1997, Aurora Power Resources, Inc. 
(APRI), filed a supplement to its application for market-based rates as 
power marketer. The supplemental information pertains to ownership of 
APRI, business activities of the owners and a statement of non-
affiliation of APRI with any other entity.
    Comment date: January 9, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

7. Central Illinois Public Service Company

[Docket No. ER98-858-000]

    Take notice that on December 1, 1997, Central Illinois Public 
Service Company (CIPS), submitted one non-firm point-to-point service 
agreement and two umbrella short-term firm transmission service 
agreements, each dated November 21, 1997, establishing the following as 
customers under the terms of CIPS' Open Access Transmission Tariff, 
Tenaska Power Services Co., and Entergy Power Marketing Corp.
    CIPS requests an effective date of November 21, 1997, for the 
service agreements. Accordingly, CIPS requests waiver of the 
Commission's notice requirements. Copies of this filing were

[[Page 70]]

served on the two customers and the Illinois Commerce Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

8. Southern Company Services, Inc.

[Docket No. ER98-860-000]

    Take notice that on November 26, 1997, Southern Company Services, 
Inc., acting on behalf of Gulf Power Company, filed an amended Service 
Agreement by and among itself, as agent for Gulf Power Company, Gulf 
Power Company and the Florida Public Utilities Company (FPUC), on 
behalf of its Marianna Division, pursuant to which Gulf Power Company 
will make wholesale power sales to FPUC for a term in excess of one (1) 
year.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

9. PP&L, Inc.

[Docket No. ER98-863-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and QST Energy 
Trading Inc., (hereinafter Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

10. PP&L, Inc.

[Docket No. ER98-864-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and UGI Power 
Supply, Inc., (hereinafter Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

11. PP&L, Inc.

[Docket No. ER98-865-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and Dupont Power 
Marketing, Inc., (hereinafter Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

12. PP&L, Inc.

[Docket No. ER98-866-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L, UGI Utilities, 
Inc. (UGI), and West Penn Power Company d/b/a Allegheny Power 
(Supplier). The terms and conditions contained within this Agreement 
are identical to the terms and conditions contained with the Form of 
Transmission Agency Agreement submitted to the Commission on October 3, 
1997, as part of the joint filing by the Pennsylvania Public Utility 
Commission and the Pennsylvania PJM Utilities at Docket No. ER98-64-
000. This filing merely submits an individual executed copy of the 
Transmission Agency Agreement between PP&L, UGI and an alternative 
supplier participating in UGI's Retail Access Pilot Program.
    Copies of the filing were served on UGI, the Supplier and the
    Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

13. PP&L, Inc.

[Docket No. ER98-867-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and Energis 
Resources, Incorporated (hereinafter Supplier). The terms and 
conditions contained within this Agreement are identical to the terms 
and conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

14. PP&L, Inc.

[Docket No. ER98-868-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and Delmarva Power 
& Light Company (hereinafter Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

15. PP&L, Inc.

[Docket No. ER98-869-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and NorAm Energy

[[Page 71]]

Management, Inc., (hereinafter Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

16. PP&L, Inc.

[Docket No. ER98-870-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L) filed an 
executed Transmission Agency Agreement between PP&L and Allegheny 
Energy Solutions, Inc., (hereinafter Supplier). The terms and 
conditions contained within this Agreement are identical to the terms 
and conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

17. PP&L, Inc.

[Docket No. ER98-871-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L) filed an 
executed Transmission Agency Agreement between PP&L and GPU Advanced 
Resources, Inc., (hereinafter Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

18. PP&L, Inc.

[Docket No. ER98-872-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and Strategic 
Energy Partners Ltd., (hereinafter Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

19. PP&L, Inc.

[Docket No. ER98-873-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L) filed an 
executed Transmission Agency Agreement between PP&L and New Energy 
Ventures, L.L.C., (hereinafter Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

20. PP&L, Inc.

[Docket No. ER98-874-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and DTE-CoEnergy, 
L.L.C., (hereinafter Supplier). The terms and conditions contained 
within this Agreement are identical to the terms and conditions 
contained with the Form of Transmission Agency Agreement submitted to 
the Commission on October 3, 1997, as part of the joint filing by the 
Pennsylvania Public Utility Commission and the Pennsylvania PJM 
Utilities at Docket No. ER98-64-000. This filing merely submits an 
individual executed copy of the Transmission Agency Agreement between 
PP&L and an alternative supplier participating in PP&L's Retail Access 
Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

21. PP&L, Inc.

[Docket No. ER98-875-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and Southern Energy 
Retail Trading and Marketing, Inc., (hereinafter Supplier). The terms 
and conditions contained within this Agreement are identical to the 
terms and conditions contained with the Form of Transmission Agency 
Agreement submitted to the Commission on October 3, 1997, as part of 
the joint filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

22. Southern Company Services, Inc.

[Docket No. ER98-876-000]

    Take notice that on December 2, 1997, Alabama Power Company (APC), 
filed proposed changes to Rate Schedule REA-1 of FERC Electric Tariff, 
Original Volume No. 1, of Alabama Power

[[Page 72]]

Company. The proposed changes will provide the affected customers a 
rate reduction. In addition, the filing proposes to revise Rate 
Schedule REA-1's provisions for terminating service at any given 
delivery point. APC has requested an effective date of January 1, 1997. 
The filing also contains corresponding Statements of Consent from the 
affected Customers.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

23. PP&L, Inc.

[Docket No. ER98-877-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and CNG Retail 
Services Corporation (hereinafter Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

24. PP&L, Inc.

[Docket No. ER98-878-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and Enron Power 
Marketing, Inc., (hereinafter Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L and an alternative supplier participating in 
PP&L's Retail Access Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

25. PP&L, Inc.

[Docket No. ER98-879-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L, UGI Utilities, 
Inc. (UGI), and New Energy Partners, L.L.C., (Supplier). The terms and 
conditions contained within this Agreement are identical to the terms 
and conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L, UGI and an alternative supplier participating 
in UGI's Retail Access Pilot Program.
    Copies of the filing were served on UGI, the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

26. PP&L, Inc.

[Docket No. ER98-880-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L, UGI Utilities, 
Inc. (UGI), and DTE Co Energy L.L.C., (Supplier). The terms and 
conditions contained within this Agreement are identical to the terms 
and conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L, UGI and an alternative supplier participating 
in UGI's Retail Access Pilot Program.
    Copies of the filing were served on UGI, the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

27. PP&L, Inc.

[Docket No. ER98-881-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L, UGI Utilities, 
Inc. (UGI), and Allegheny Energy Solutions, Inc., (Supplier). The terms 
and conditions contained within this Agreement are identical to the 
terms and conditions contained with the Form of Transmission Agency 
Agreement submitted to the Commission on October 3, 1997, as part of 
the joint filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L, UGI and an alternative supplier participating 
in UGI's Retail Access Pilot Program.
    Copies of the filing were served on UGI, the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

28. PP&L, Inc.

[Docket No. ER98-882-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L, UGI Utilities, 
Inc. (UGI), and Delmarva Power d/b/a Connectiv Energy (Supplier). The 
terms and conditions contained within this Agreement are identical to 
the terms and conditions contained with the Form of Transmission Agency 
Agreement submitted to the Commission on October 3, 1997, as part of 
the joint filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L, UGI and an alternative supplier participating 
in UGI's Retail Access Pilot Program.
    Copies of the filing were served on UGI, the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

29. PP&L, Inc.

[Docket No. ER98-883-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L, UGI Utilities, 
Inc. (UGI) and UGI Power Supply, Inc., (Supplier). The terms and 
conditions contained within this Agreement are identical to the terms 
and conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket

[[Page 73]]

No. ER98-64-000. This filing merely submits an individual executed copy 
of the Transmission Agency Agreement between PP&L, UGI and an 
alternative supplier participating in UGI's Retail Access Pilot 
Program.
    Copies of the filing were served on UGI, the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

30. PP&L, Inc.

[Docket No. ER98-884-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L and Horizon Energy 
Company (hereinafter Supplier). The terms and conditions contained 
within this Agreement are identical to the terms and conditions 
contained with the Form of Transmission Agency Agreement submitted to 
the Commission on October 3, 1997, as part of the joint filing by the 
Pennsylvania Public Utility Commission and the Pennsylvania PJM 
Utilities at Docket No. ER98-64-000. This filing merely submits an 
individual executed copy of the Transmission Agency Agreement between 
PP&L and an alternative supplier participating in PP&L's Retail Access 
Pilot Program.
    Copies of the filing were served on the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

31. PP&L, Inc.

[Docket No. ER98-885-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L, UGI Utilities, 
Inc. (UGI), and Energis Resources Incorporated (Supplier). The terms 
and conditions contained within this Agreement are identical to the 
terms and conditions contained with the Form of Transmission Agency 
Agreement submitted to the Commission on October 3, 1997, as part of 
the joint filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L, UGI and an alternative supplier participating 
in UGI's Retail Access Pilot Program.
    Copies of the filing were served on UGI, the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

32. PP&L, Inc.

[Docket No. ER98-888-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L, UGI Utilities, 
Inc. (UGI), and Horizon Energy (Supplier). The terms and conditions 
contained within this Agreement are identical to the terms and 
conditions contained with the Form of Transmission Agency Agreement 
submitted to the Commission on October 3, 1997, as part of the joint 
filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L, UGI and an alternative supplier participating 
in UGI's Retail Access Pilot Program.
    Copies of the filing were served on UGI, the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

33. PP&L, Inc.

[Docket No. ER98-889-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L) filed an 
executed Transmission Agency Agreement between PP&L, UGI Utilities, 
Inc. (UGI), and CNG Retail Service Corporation (Supplier). The terms 
and conditions contained within this Agreement are identical to the 
terms and conditions contained with the Form of Transmission Agency 
Agreement submitted to the Commission on October 3, 1997, as part of 
the joint filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L, UGI and an alternative supplier participating 
in UGI's Retail Access Pilot Program.
    Copies of the filing were served on UGI, the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

34. PP&L, Inc.

[Docket No. ER98-890-000]

    Take notice that on December 1, 1997, PP&L, Inc. (PP&L), filed an 
executed Transmission Agency Agreement between PP&L, UGI Utilities, 
Inc. (UGI), and Strategic Energy Partners Ltd. (Supplier). The terms 
and conditions contained within this Agreement are identical to the 
terms and conditions contained with the Form of Transmission Agency 
Agreement submitted to the Commission on October 3, 1997, as part of 
the joint filing by the Pennsylvania Public Utility Commission and the 
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing 
merely submits an individual executed copy of the Transmission Agency 
Agreement between PP&L, UGI and an alternative supplier participating 
in UGI's Retail Access Pilot Program.
    Copies of the filing were served on UGI, the Supplier and the 
Pennsylvania Public Utility Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

35. Cinergy Capital & Trading, Inc.

[Docket No. ER98-1063-000]

    Take notice that on December 15, 1997, Cinergy Capital & Trading, 
Inc. (CC&T), filed an amendment to its Rate Schedule FERC No. 1. CC&T 
has requested a January 15, 1998, effective date for the amendment to 
Rate Schedule FERC No. 1.
    Comment date: January 9, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

36. Consumers Energy Company

[Docket No. ER98-1117-000]

    Take notice that on December 15, 1997, Consumers Energy Company 
(Consumers), filed Amendment No. 1, to its Power Sales Agreement with 
Edison Sault Electric Company.
    Consumers has requested that this filing be accepted retroactive to 
January 1, 1997, to coincide with the proposed effective date of a 
concurrently filed settlement agreement of transmission agreement 
issues.
    Copies of the filing were served upon Edison Sault Electric Company 
and the Michigan Public Service Commission.
    Comment date: January 7, 1998, in accordance with Standard 
Paragraph E at the end of this notice.

Standard Paragraph

    E. Any person desiring to be heard or to protest said filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
motions or protests should be filed on or before the comment date. 
Protests will be considered by the Commission in

[[Page 74]]

determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Any person wishing to 
become a party must file a motion to intervene. Copies of this filing 
are on file with the Commission and are available for public 
inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 97-34172 Filed 12-31-97; 8:45 am]
BILLING CODE 6717-01-P